Q and A 7-29 OHWS.pdf

PDF 38 KB Posted

Attached to
OHWS Athletic Training
Solicitation number
W50S9C26QA009
Issued by

About this file

This is a Questions and Answers document for a federal contract opportunity. The document addresses seven clarifications submitted by prospective offerors between July 21-26, regarding a follow-on requirement to contract W50S9C-25-P-A010, previously awarded to Duro Health LLC. The contract is a single-year requirement with no option periods, ending September 22, 2027.

Key submission requirements clarified include: technical capability documentation limited to 10 pages (separate from resumes, which are capped at 3 pages each); past performance references limited to two sources; work schedule consisting of generally two 5-hour blocks per discipline per day, Tuesday through Saturday, as specified in Technical Exhibit 3; and an Excel compatibility revision provided by the contracting officer. These clarifications address proposal format and administrative requirements rather than substantive service or product specifications.

View the file

Other files

File Type Posted
26QA009 Pricing Workbook.xlsx XLSX spreadsheet
Combined Synopsis.docx DOCX document
Performance Assessment Questionaire.docx DOCX document
CLSExport_W50S9C26QA009 Revised.pdf PDF
National Guard Protest Procedures -.pdf PDF
158FW OHWS PWS.pdf PDF
Combined Synopsis.docx DOCX document
26QA009 Pricing Workbook.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question Received Answer 1 Excel compatibility 21-Jul Revised attached.

Is this a new contract or a follow-on / recompete? If it's a recompete can you provide the contract number? 21-Jul

This is a follow on rerquirement to: W50S9C-25-P-A010 awarded to Duro Health LLC

Do you know if there will be any option periods after the first one ending 9-22-2027 21-Jul

This is a single year contract, with no option years

Can you confirm the general work schedule will be 5 hours per day, Tues – Saturday? 21-Jul

Please see Technical Exhibit 3, generally two 5 hour blocks per disclipline per day.

Are the Resumes seprate from the 10 page technical capability page limit 21-Jul

Resumes are seprate from technical capability, the page limit for each resume is 3 pages.

6 Clarifying Technical capability 5 or 10 pages? 26-Jul PWS revised 10 pages 7 Past Performance and Questionare clarification 2 or 5? 26-Jul Past performance is limited to two sources.