25QA016 Q and A 22 SEP 25.pdf
PDF 27 KB Posted
- Attached to
- Equipment Decontamination Federal contract opportunity
- Solicitation number
- W50S9C-25-Q-A018
About this file
This document is a Questions and Answers (Q&A) document for a federal contract (Solicitation Number W50S9C-25-Q-A018) for equipment decontamination. The Q&A was issued on 22 SEP 2025 and covers key details about the procurement. Site visits are available by request (48 hours in advance) or on 18 and 19 SEP at 1300 EST. The contract is a new effort with a 90-day performance period to be completed by 29 December. The contractor will be responsible for decontamination of a machine, including potential modifications to ensure effectiveness, and must provide all necessary equipment and supplies. The government will be responsible for waste disposal, while the contractor handles safe handling and decontamination. No government-furnished equipment or supplies will be provided, and the contractor must determine the appropriate labor mix to execute the decontamination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| I.A.02. PWS and PRS Template1211 Final.pdf | ||
| 25QA018 Q and A 18 SEP 25.pdf | ||
| 25QA016 Q and A 17 SEP 25.pdf | ||
| PWS 17-SEP-25.pdf | ||
| Solicitation - W50S9C25QA018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9C-25-Q-A018 Equipment decontamination Q&A as of 22 SEP
Number Question Answer
1 Will a site visit be offered?
Site visits are avaliable by request (48 hours in advance) or at 1300 EST 18 SEP and 19 SEP (responding to KO).
PWS 5.3.2. refrences the term disposal, should it be turn in to Government? Correct, PWS revised.
3 Can additional time be allocated for (possible) remedial work?
Please see revised PWS allocated time is 90 days. Performance and any remediation needs to be complete by 29 December.
4 Is this a renewal or new effort? This is a new effort.
To ensure full compliance with pre-award procedures, may we request a copy of Attachement 1 - Level of Effort and Mix of labor
Attachment 1 - Level of Effort and mix of labor, is not provided for this requirement. The contractor shall determine the necessary labor mix to execute the decontamination.
Is the machine allowed to be modified (cut/drilled/etc) to ensure the effectiveness of the decontamination? Yes.
PWS 3.4 states Government will dispose of all waste generated during the project, but PWS 5.3.2 states the contractor will dispose, can you confirm which is correct?
See PWS revisions. The Government is responcible to dispose of the waste, the contrator shall be responcible for the safe handling/decontamination of the machine.
In section 5.2, could you confirm what a "158 bulk enviromental hazardous waste container" is that the contractor needs to put pourous material into?
Removed. No government furnished equipment or supplies are included. The contractor will be responcible for providing all equipment and supplies to perform the decontamination.