Amendment 0001 W50S9C-23-B-0001.pdf
PDF 721 KB Posted
- Attached to
- Expand Photovoltaic (PV) array Federal contract opportunity
- Solicitation number
- W50S9C-23-B-0001
About this file
This is an amendment to solicitation W50S9C-23-B-0001 issued by the Department of the Army Vermont Army National Guard to expand an existing photovoltaic array. The amendment provides answers to nine questions from potential offerors to clarify requirements. It modifies option descriptions in the solicitation and contract form to specify that pricing for options should be incremental costs. Option 6 for stone drainage is expanded to include the entire solar panel area of both the base bid and option 3. The bid opening date is Friday, August 18, 2023, and all questions must be submitted five working days prior.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment incorporates Questions and Answ ers As of 8/18/23 inclusive of questions 1 through 9 and their respective answ ers as part of this solicitation. The BOLD letter w ording from question 9 responses have also been amended in each respective CLIN description block.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S9C23B0001
X 9B. DATED (SEE ITEM 11)
21-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Aug-2023
CODE
USPFO VT 158 MISSION SUPPORT CONTRACTING
45 NCO DR SUITE A
SOUTH BURLINGTON VT 05403-5867
W50S9C 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9C23B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWERS
1. Question: What type of stone is required for Option #6 Stone Drainage Cover?
Answer: This is detailed on drawing C-1. This drawing was accidentally omitted for the original drawing set.
It was uploaded to SAM.gov on 15 Aug 23.
2. Question: Where is the laydown area?
Answer: The laydown area is depicted below. Contractor to install construction snow fencing from fire department to connect to the installation perimeter fence line. See picture below. Contractor is responsible for returning the laydown site to existing conditions upon conclusion of the project.
3. Question: Is there a preferred method of excavation?
Answer: Means and methods are not dictated, contractor shall take reasonable precautions to not damage utilities in utility rich areas or in areas where unprotected utilities are present.
4. Question: Are the trees staying near the areas where equipment is located near NCO Drive?
Answer: Yes.
5. Question: What is the water line depth on base?
Answer: Varies. Assume a minimum of 5-6ft.
6. Question: Is there water connection on site for providing water for fire suppression?
Answer: BESS system shall meet the requirements of UL9540A and NFPA 855. BESS battery section shall be provided with self-contained, internal fire suppression system with water supply located in a tank within the BESS enclosure. Remaining sections of BESS for inverter and other components outside the battery area to be chemical type system (i.e. Novec). BESS shall have the required fire/smoke detection, gas detection and ventilation as required by NFPA 855.
7. Question: Does Option #6 Stone Drainage only include area under the Base Bid?
Answer: Price for Option #6 shall include the entire solar panel area encompassed by both Base Bid and Option #3.
8. Question: The written specification says:
The BESS shall be rated at 125 kVA at 0.95 pf and deliver 125 kWh at End of Life year 20 at point of interconnection.
1. The BESS shall be rated at 250 kVA at 0.95 pf and deliver 250 kWh at End of Life year 20 at point of interconnection.
2. The BESS shall be rated at 250 kVA at 0.95 pf and deliver 500 kWh at End of Life year 20 at point of interconnection.
The drawings call for a BESS that is:
125kW/125kWH 250kW/250kWh or 250kw/500kWh
Please confirm that delivering 125, 250 and 500kWh at 20-year end of life is correct as this increases the size of the ESS.
Answer: The BESS rating shall be based on the "End of Life year 20 at point of interconnection" per the specifications.
9. Question: Please provide clarification on how to price CLINS. Are these intended to be Incremental Cost?
Answer: The following is provided for changes to wording on Drawings E3.1 and E3.2. Changes are indicated in BOLD. CLIN Descriptions have been revised to reflect same wording.
BASE DESIGN:
1. 1200A, 277/480V SWITCHBOARD, 500KVA PAD TRANSFORMER, 125KW/125KWH BESS, 375KW
PV, GREEN MOUNTAIN POWER (GMP) RTU. GMP RTU FURNISHED AND INSTALLED BY GMP
HOWEVER CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS (ESTIMATE $30,000).
ELECTRICAL CONTRACTOR TO PROVIDE PEDESTAL, ALL CIRCUITING AND MOUNTING OR
RTU ON PEDESTAL.
OPTION #1:
1. INCREMENTAL COST TO ADD GMP RECLOSER AND DELETE GMP RTU. GMP RECLOSER
FURNISHED AND INSTALLED BY GMP HOWEVER CONTRACTOR SHALL BE RESPONSIBLE FOR
COSTS (ESTIMATE $80,000 INSTEAD OF $30,000). ELECTRICAL CONTRACTOR TO PROVIDE
RECLOSER VAULT AND ALL WORK EXCEPT SETTING AND ENERGIZATION OF RECLOSER.
OPTION #2:
1. INCREMENTAL COST TO CHANGE 500KVA TRANSFORMER TO 750KVA TRANSFORMER.
OPTION #3:
1. INCREMENTAL COST TO CHANGE PHOTOVOLTAIC SYSTEM FROM 375KWAC/406KWDC
SYSTEM TO 437.5KVAC/474KWDC SYSTEM BY CHANGING THE NUMBER OF 62.5KW INVERTERS
FROM (6) TO (7) AND INCREASING THE PHOTOVOLTAIC PANELS PROPORTIONATELY.
OPTION #4:
1. INCREMENTAL COST TO CHANGE BESS FROM 125KW/125KWH TO 250KW/250KWH OUTPUT.
OPTION #5:
1. INCREMENTAL COST TO CHANGE OPTION #4 BESS ENERGY OUTPUT FROM 250KWH TO
500KWH.
OPTION #6:
1. ADD STONE/DRAINAGE UNDER BASE DESIGN AND OPTION #3 NEW SOLAR ARRAY PER
DETAILS. MATCHES AND EXTENDS FROM EXISTING STONE/DRAINAGE AT EXISTING ARRAY
REMINDER – ALL QUESTIONS MUST BE SUBMITTED FIVE WORKING DAYS PRIOR TO BID OPENING
DATE (FRIDAY 18 AUG 23).
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0002
The CLIN extended description has changed from:
ADD GMP recloser and DELETE GMP RTU. See Option Key Notes on drawings.
To:
Incremental cost to ADD GMP recloser and DELETE GMP RTU. See Option Key Notes on drawings.
CLIN 0003
Change 500 KVA Transformer to 750 KVA Transformer. See Option Key Notes on drawings.
Incremental Cost To Change 500 KVA Transformer to 750 KVA Transformer. See Option Key Notes on drawings.
CLIN 0004
Change PV system from 375 KWAC/ 406 KWDC to 437.5 KVAC/ 474 KWDC System. See Option Key Notes on drawings.
Incremental Cost To Change PV system from 375 KWAC/ 406 KWDC to 437.5 KVAC/ 474 KWDC System. See Option Key Notes on drawings.
CLIN 0005
Change BESS from 125 KW/ 125 KWH to 250 KW/ 250 KWH Output. See Option Key Notes on drawings.
Incremental Cost To Change BESS from 125 KW/ 125 KWH to 250 KW/ 250 KWH Output. See Option Key Notes on drawings.
CLIN 0006
Change BESS From 125KW/125KWH to 250 KW/ 500 KWH Output. See Option Key Notes on drawings.
Incremental Cost To Change Option #4 BESS Energy Output From 250 KWH to 500 KWH Output. See Option Key Notes on drawings.
CLIN 0007
Add Stone/Drainage under new solar array. See Option Key Notes on drawings.
Add Stone/Drainage under new solar array. See Option Key Notes on drawings. Inclusive of both Base Bid and Option #3 areas.
(End of Summary of Changes)