Questions and Answers 1 dtd 14 Aug 24.docx
DOCX document 15 KB Posted
- Attached to
- Vehicle Wrap
- Solicitation number
- W50S9B24Q0030
- Issued by
-
Department of the Army National Guard
About this file
This document contains Questions and Answers from the agency regarding a federal contract opportunity for a Vehicle Wrap.
The key details are:
- The contract is for providing labor, materials, and equipment to manufacture and install removable wrap-around graphics and remove existing graphic wraps from a 2023 Nissan Altima Government-owned vehicle.
- The period of performance is 4 weeks from the contract award date. Additional time can be requested if needed.
- The agency does not have specific requirements for the wrapping material, but wants high quality material that will not crack or fade easily and can be removed without damaging the existing paint.
- The contractor will work with "airforceads.com" to receive the Air Force approved template and print the wrap graphics.
- The agency has requested photos of the wrapped vehicle for inclusion in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2023 Altima Pic 1.png | PNG image | |
| Att 1 SOW Vehicle Wrap 14 Aug 2024.pdf | ||
| 2023 Altima Pic 2.pdf | ||
| Att 3 Wage Determination 2015-4341 Rev 27.pdf | ||
| Att 2 Provision and Clauses.pdf | ||
| Att 1 SOW Vehicle Wrap 18 June 2024.pdf | ||
| B.01 Combined Synopsis Solicitation W50S9B24Q0030 Vehicle Wrap.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers 1 14 Aug 24
1. Is there a specific requirement for wrapping material?
There isn’t any language specific on what material to use. Use the best quality material the company has to offer. The Air National Guard doesn’t want the material to crack and fade easily and is able to be removed without damaging the existing paint on the vehicle.
1. Does the period of performance commence after the final approval of artwork?
IAW paragraph 1.3. The period of performance for this contract is 4 weeks from the award date of the contract. If additional time is required, please reflect required time on quote.
1. Is there any way you can send me photos of the wrapped vehicle as well as the year/make/and model of the vehicle being wrapped? – can you please send pictures to upload with the solicitation As referenced in Technical Exhibit 1 found on page 4 of the Statement of Work (SOW), vehicle wrap is to be for a 2023 Nissan Altima. The pictures will be added to solicitation for reference
1. Do you already have the wrap printed or would you need us to do that as well?
IAW paragraph 4.4 of the SOW, the contractor shall produce graphics in accordance with the measurements obtained by the contractor. Contractor will work with “airforceads.com” to receive the Air Force approved template. Company will print the wrap.
File details come from the government source that posted it. Updated .