W50S9B-20-Q-0026, Exterior LED Lighting Questions and Answers
26 August 2020
The following are the questions received in connection with W50S9B-20-Q-0026. Following each question is the Government’s official response.
Q1. What is the minimum foot-candle level per light fixture?
A1. Statement of Work (SOW) has been revised to include the minimum foot-candle.
Q2. SOW, paragraph 7.1.c states that the lights shall illuminate Zone D. However, the Fixture Schedule does not have fixtures on the east side of the building. Is the intent for the most easterly fixture mounted to north and south side of the building to illuminate Zone D?
A2. Yes, if possible
Q3. Will as-built electrical drawings be provided?
A3. As-built electrical drawings are not available. However, the 100% design drawings for lighting and power plan is provided as an attachment to the revised SOW. During construction of the facility, the government ensured the design plans were followed.
Q4. SOW, paragraph 7.1.a requires the installation of “switch or switches.” How many switches is required?
A4. 1 switch
Q5. SOW, paragraph 7.1.a requires an interior switch and paragraph 7.1.b requires the lamps to be photocell capable. Is the intent for the lights to be photocell or manual switched?
A5. The intent is to have a photocell with an override (switch).
Q6. How far is the electrical panel from the lights to be installed?
A6. Approximately 50 ft.
Q7. Is there a specific height the lights need to be mounted at?
A7. A minimum of 14 ft from the ground. Light fixtures are required to be uniformed and able to illuminate the areas specified.
Q8. What is the height of the building?
A8. Approximately 16 ft.
Q9. What are the building dimensions?
A9. Zone A side of the building is 90 ft. wide. The length from the building to the end of parking lot is 82 ft.
Zone B side of the building is 90 ft. wide. The length from the building to the fence line is 55 ft.
Zone C side of the building is 53 ft. wide. The length from the building to the fence ling is 47 ft.
R. FRANK HARTZELL, SMSgt, VaANG Contracting Officer