This document is a Questions and Answers file for a federal demolition contract solicitation for Building 1522 at the Roland R. Wright Air National Guard Base in Salt Lake City, Utah. The solicitation (RFQ #W50S9A-25-Q-A011) is a 100% small business set-aside for demolishing a building, with key details including a site visit on 22 April 2025, no bid bond requirement, and work to be performed using calendar days. The Q&A covers various technical details such as utility handling, air clearance requirements for asbestos abatement, electrical and mechanical system removal, and specific site conditions like concrete cutting, tree trimming, and temporary road closures.
The document provides specific answers to 27 contractor questions, addressing topics like temporary power availability, transformer and HVAC equipment removal, interior appliance demolition, gas line handling, and permitting requirements. Wage determination and past performance will be evaluated using lowest price technically acceptable (LPTA) criteria, with contractors needing to demonstrate relevant demolition and landscaping experience. The solicitation is subject to fund availability, with the NAICS code 238910 and a small business size standard of $19M.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. Is this project tax exempt?
a. Yes.
2. Are there Liquidated damages for this project?
a. No.
3. Is the POP in calendar days or working days?
a. Calendar Days.
4. Is a bid bond required with proposal?
a. No.
5. What is required for air clearance post abatement?
a.
6. Is daily air clearance testing required?
a. No.
7. Are we required to have a CIH on site during abatement?
8. Is temporary power available for contractors to use?
a. Yes. Please see section “3.5 Utilities” in PWS for Information.
9. Is temporary fencing required?
a. Any hazards left exposed on the site while the contractor is not present shall be clearly marked or protected. The base is hosting a family day on 2 August barrier.
10. Can the road in-front of the building be closed during the duration of the project?
a.
temporary closures for essential equipment movement or safety-critical operations. You must coordinate these times with the COR.
11. Can the tree’s be trimmed back by the base for contractors to access that side without damage?
a.
needed.
12. RED line or leave concrete as is currently on BLUE line. (SEE PICTURE BELOW)
a. The concrete will be cut at the RED line.
13.
landscaping requirements for between the sidewalk and the fence?
a. The sidewalk will remain. No landscaping will be required between the sidewalk and the fence.
14. Is the green electrical box and equipment pad to be removed?
a. Small transformer and pad on southwest corner will be demolished. Conduit can be abandoned in place.
15. Is the electrical feeder conduit to be removed or just the power wiring?
a.
abandoned in place.
16. Will the HVAC pad and small sidewalk on the southwest building be demolished?
a. Yes.
17. Will Appliances be removed inside?
a. Appliances inside the building are considered part of the entire interior which shall be demolished.
18. What will be done to the gas line and asphalt nearby?
a. will be repaired following abandonment of the line.
19. Is a dig permit required?
a. Contractor will require a dig permit; this is done in coordination with Civil Engineering. Contractor will need to maintain both a base dig permit and a Blue Stakes dig permit. Enbridge will mark gas through the Blue Stakes program (coordination must be done to meet them at the base gate) and the base will mark the remaining utilities.
20. Utility drawing shows electrical line going through a junction box in grass for?
a. The line does not go through that junction box – it goes directly to the building transformer.
21. Going through the wage determination for the Davis Bacon Wages. There is no asbestos technician line-
a. Please refer to the Service Contract Act attached in the solicitation for wage rates regarding service personnel and hazardous materials.
22. Do you anticipate a bid extension?
23. What are the dimensions of the building to be demolished? Are there old
24. Can photos of the interior of the existing building to be demolished be made available to see the general existing conditions so we can provide the most accurate estimate?
a. Unable to get pictures at the time. Please reference above on layout and pictures of the outside.
25. What are the dimensions of the transformer to be removed and what type of
26. Can photos of the transformer in question be made available to see the general existing conditions so we can provide the most accurate estimate?
a. See photos below.
27. -builts to the mechanical be removed.
a. below. Mech room pictures not currently available.