W50S9A-24-Q-A017 Amend 002 - Specifications - Breathing Air Compressor.pdf
PDF 792 KB Posted
- Attached to
- Breathing Air Compressor
- Solicitation number
- W50S9A-24-Q-A017
About this file
This document is a set of specifications for a Breathing Air Compressor for the UTANG Fire Department located at the Salt Lake City International Airport. The key requirements include:
-
An All-in-One High-Pressure Breathing Air Compressor with a 3-phase/5-stage design, minimum 20 HP motor, 6000 psig output, 3-position containment fill station, cascade system, 4 ASME cylinders, low-pressure oil pump system, and 2-year factory warranty. It must meet NFPA 1989 and OSHA 1910.134 standards.
-
Integrated carbon monoxide and H2S monitoring/alarm systems.
-
100 ft high pressure hose reel.
-
Extended 3-year warranty beyond the factory warranty.
The delivery, installation, and training is required within 60 days after award. Installation services and training on operation and maintenance are included. This requirement is part of a Federal Contract Opportunity W50S9A-24-Q-A017 issued by the 151 Civil Engineering Squadron, Utah Air National Guard. It is a 100% Small Business Set-Aside with a NAICS code of 3333912 Air and Gas Compressor Manufacturing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
9-10-2024
Breathing Air Compressor
BACKGROUND: The UTANG Fire Department located at Salt Lake City International Airport in Salt Lake City, UT has a requirement for an All-in-One High- Pressure Breathing Air Compressor.
EQUIPMENT: The following specifications delineate the required criteria for the supplies to be considered acceptable.
1) All-in-One High- Pressure Breathing Air Compressor
a. 3 phase/5 stage compressor
b. Minimum: 20 HP Motor
c. Minimum: 6000 psig output
d. 3 position containment fill station accommodates SCBA or SCUBA cylinders up to 31”overall length
e. Cascade system or similar rated to 7000 PSIG
f. 4 ASME Cylinders
g. Low-pressure oil pump system
h. Minimum: 2-year factory warranty
i. Must meet all NFPA 1989 Standards on Breathing Air Quality for Emergency Services Respiratory
Protection and OSHA 1910.134 - Respiratory protection requirements
2) Carbon Monoxide Monitoring/Alarm System (Factory Installed/Integrated)
3) H2S Monitoring/Alarm System (Factory Installed/Integrated)
4) 100 ft high pressure cabinet enclosed hose reel
5) Extended Warranty (Minimum additional 3-year beyond factory warranty)
DELIVERY, INSTALLATION, & TRAINING: Delivery, installation, and training of this item is anticipated to be no later than 60 days after receipt of award.
Delivery shall be to:
UTANG Fire Department C/O Chief Barry Goff 765 N 2200 W Salt Lake City, UT 84116
If this delivery timeline cannot be met, the vendor shall state the best alternate delivery timeline they can provide. Installation services shall include all manpower, tools, equipment, and other items as necessary to secure the breathing air compressor to the floor, route the fresh air intake, and connect the unit to the provided power supply. Training on the device shall be conducted upon the completion of the installation work and shall include instructions on how to operate and maintain the device, as well as training government personnel on how to perform the process for proper air sampling and what safety measures need to be taken while in use.
**END SPECIFICATIONS**
W50S9A-24-Q-A017 Amend 002
File details come from the government source that posted it. Updated .