W50S9A-24-Q-A017 Amend 001 - Specifications - Breathing Air Compressor.pdf

PDF 284 KB Posted

Attached to
Breathing Air Compressor
Solicitation number
W50S9A-24-Q-A017
Issued by

About this file

This document is a set of technical specifications for a Breathing Air Compressor required by the UTANG Fire Department located at Salt Lake City International Airport. The key details are:

The specifications outline requirements for an all-in-one high-pressure breathing air compressor, including a 20 HP 3-phase/5-stage compressor with a minimum 6000 psig output, a 3-position containment fill station, auto cascade system, 4 ASME cylinders, and integrated carbon monoxide and hydrogen sulfide monitoring/alarm systems. The compressor must meet NFPA 1989 and OSHA 1910.134 standards. Delivery, installation, and training are required within 60 days of award. An extended 3-year warranty beyond the 2-year factory warranty is also required.

This specification is related to a federal contract opportunity (Solicitation #W50S9A-24-Q-A017) issued by the 151 Civil Engineering Squadron of the Utah Air National Guard to procure the breathing air compressor. The solicitation is a 100% small business set-aside with a NAICS code of 3333912 (Air and Gas Compressor Manufacturing). Quotes are due by the stated solicitation closing date and time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Breathing Air Compressor

BACKGROUND: The UTANG Fire Department located at Salt Lake City International Airport in Salt Lake City, UT has a requirement for an All-in-One High- Pressure Breathing Air Compressor.

EQUIPMENT: The following specifications delineate the required criteria for the supplies to be considered acceptable.

1) All-in-One High- Pressure Breathing Air Compressor

a. 3 phase/5 stage compressor

b. Minimum: 20 HP Motor

c. Minimum: 6000 psig output

d. 3 position containment fill station accommodates SCBA or SCUBA cylinders up to 31”overall length

e. Auto Cascade system or similar rated to 7000 PSIG

f. 4 ASME Cylinders

g. Low-pressure oil pump system

h. Minimum: 2-year factory warranty

i. Must meet all NFPA 1989 Standards on Breathing Air Quality for Emergency Services Respiratory

Protection and OSHA 1910.134 - Respiratory protection requirements

2) Carbon Monoxide Monitoring/Alarm System (Factory Installed/Integrated)

3) H2S Monitoring/Alarm System (Factory Installed/Integrated)

4) Regulated remote fill hose connection

5) 100 ft high pressure cabinet enclosed hose reel

6) Extended Warranty (Minimum additional 3-year beyond factory warranty)

DELIVERY, INSTALLATION, & TRAINING: Delivery, installation, and training of this item is anticipated to be no later than 60 days after receipt of award.

Delivery shall be to:

UTANG Fire Department C/O Chief Barry Goff 765 N 2200 W Salt Lake City, UT 84116

If this delivery timeline cannot be met, the vendor shall state the best alternate delivery timeline they can provide. Installation services shall include all manpower, tools, equipment, and other items as necessary to secure the breathing air compressor to the floor, route the fresh air intake, and connect the unit to the provided power supply. Training on the device shall be conducted upon the completion of the installation work and shall include instructions on how to operate and maintain the device, as well as training government personnel on how to perform the process for proper air sampling and what safety measures need to be taken while in use.

**END SPECIFICATIONS**