Questions and Answers- update.pdf

PDF 234 KB Posted

Attached to
Fire Pumps Emergency Backup Generator Federal contract opportunity
Solicitation number
W50S99-22-B-0002
Issued by
Department of the Army National Guard

About this file

This document contains a solicitation for a construction project to install a fire pump emergency backup generator at an Air National Guard base in Memphis, Tennessee. The project includes furnishing all labor, materials, tools and equipment to install a 400kW diesel generator on a new concrete pad and connect it to an existing electrical panel. The NAICS code for this project is 238210 with a small business size standard of $16.5 million in average annual receipts. The project value is between $250,000 and $500,000. Questions regarding the solicitation are due by August 23rd and bids are due by August 31st. Award will be made based on lowest price to a contractor registered in the System for Award Management. The point of contact for questions is Chris Rhyne at the listed email addresses.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Pumps Emergency Backup Generator, newest first.
File Type Posted
Questions and Answers.pdf PDF
solicitation_W50S99-22-B-0002_Fire Pumps Backup Generator.pdf PDF
Design Plans - Fire_Pump_Generator_PYKL162023.pdf PDF
PWS_PYKL162023_FIRE_PUMP_EMERGENCY_BACK UP_GENERATOR.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - Project Number PYKL162023 “Fire Pump Emergency Backup Generator”

1) In order to pull out and pull new feeds into the existing transformer, whether you do them one at a time or all at once, the power company transformer will have to be shut down. This will shut down all 3 existing feeds currently feeding the fire pumps. Will a standby generator be required for the fire pumps during any outage? - No

2) Are the new conduits from the new generator required to be in a concrete encased duct bank? If so, please provide detail. - Yes, it is of typical design

3) The PWS states “The diesel generator shall feed the existing emergency back up panel”. The one-line drawing does not show an existing emergency back up panel. It shows the generator feeding the transfer switches direct and then to the Fire Pump Controllers. Please clarify. - The existing emergency panel is fed by another generator

4) Is there a preferred Fire Suppression Contractor that either services or maintains the existing Fire

Pump Controllers? - Yes, VCS of Memphis TN

5) Please provide specifications associated with the project to include all generator specs, sound enclosure specs, underground conduit specs, transfer switch specs etc. - There is not one specified, so the contractor would submit one as a material submittal if awarded the contract.

6) Will the TNANG be responsible for de-energizing and re-energizing the power company transformer, or will the awarded contractor be required to use a medium voltage contractor outside of the base? -

The local utility company which is Memphis Light Gas and Water

7) Can a time extension for the bid due date be issued in order to process the answers associated with the Q&A? – The Government is not planning to extend the bid due date at this time

9) The current POP for the project is 365 days. Most generators have a minimum of a one-year manufacturer lead time. Will a time extension be issued in relation to equipment lead times? – The

Government is not planning to issue a time extension at this phase of the procurement process

10) Will there be a public bid opening? – Bids will be opened electronically – The Government will provide a bid response

11) Per 1.1.1 of the PWS, the contractor is to submit a narrative describing their work plan. Will this project be awarded solely based on “Low Price” or will it be considered a “Best Value” award? – Lowest

Price

12) Are any architectural/ flashing covers required over the exposed conduits to be mounted on the side of the building where the conduits transition from underground and into the fire pump room? - Only the

ELB as required

13) We had a point of clarification on the sub note 26 as shown below on Drawing E130.

It states to provide 3/4" threaded copper pipe to reconnect the fire pump controller sense lines at the new locations beside the fire pumps.

Typically, these sense lines are 1/2" threadable brass. We wanted to make sure of the pipe type and size. Could you please verify and advise? – Provide ¾” threaded copper pipe to connect existing valve and gauge