This statement of work outlines requirements for a contract to replace the boiler system at Building 810 at Nashville International Airport for the 118th Wing Tennessee Air National Guard. The contractor will demolish the existing boiler, pumps, piping, flue and controls and furnish and install a new replacement system. The contractor must complete work within 120 days of receiving notice to proceed and in accordance with the attached plans and specifications. The contractor is responsible for providing all labor, equipment, transportation and supervision for the project. The contractor must also install a temporary heating system during replacement of the boiler and pumps. The solicitation number for this opportunity is W50S9723B0005 and it was issued by the Department of the Army National Guard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
UNITED STATES AIR FORCE
118th Wing Tennessee Air National Guard
Berry Field Air National Guard Base, Nashville, TN
STATEMENT OF WORK
BKTZ212007
Repair Boiler B810
REVISED 15 Sept 2023
1.0 STATEMENT OF WORK
1.1. The contractor shall provide, unless otherwise noted, all management, tools, equipment, transportation, supervision, and labor necessary to demolish, furnish and install replacement of pumps, piping, and controls of existing boiler system and related mechanical components in building 810 in accordance with the attached plans and drawings at Nashville
International Airport (IAP) within the period of performance of 120 days after notice to proceed. Contractor shall perform all work in accordance with this Statement of Work (SOW), plans and specifications titled “Replace Boiler System B810”, manufacturer specifications, UFC 3-430-11 Boiler Plant Instrumentation and Control Systems dated 4-27-2021. Contractor shall coordinate all work with the Contracting Officer and Civil Engineer office and is subject to the attached drawings and specifications.
1.2. These requirements, together with the technical specifications, standards, and drawings specified in the contract documents, cover the requirements for all work associated with furnishing, installing, and connecting all boiler equipment for building
720 at Nashville IAP. The following is a general description of the work involved:
1.3. Provide all material and services required to perform the following services:
1.3.1. Demolish existing, furnish, and install new boiler
1.3.2. Demolish existing, furnish, and install new piping
1.3.3. Demolish exiting, furnish, and install new pumps according to specifications
1.3.4. Selectively demolish existing flue, furnish and install new flue according to specifications
1.3.5. Furnish and install tools and equipment for controls to include connections, circuits, and programming
1.3.6. Provide temporary heating system for hot water circuit during boiler and pump replacement.
1.4. Complete Antiterrorism Level 1 Training (general) and provide proof of completion upon request.
2.0 SPECIFICATIONS: Contractor SHALL comply with the following items:
2.1. Work shall be performed as shown on the attached drawings and specifications.
2.2. INSTALLATION:
2.2.1. Installation shall meet or exceed all applicable federal, state and local requirements, referenced standards and conform to codes and ordinances of authorities having jurisdiction to include UFC 3-430-11 Boiler Plant Instrumentation and
Control Systems.
2.2.2. All installations shall be in accordance with manufacturer’s published recommendations and the attached drawings and specifications.
2.2.3. Contractor shall furnish all parts and assembly during construction.
2.2.4. The Contractor shall install all equipment in accordance with manufacturer’s specifications and guidelines.
2.3. PRODUCTS
2.3.1. GENERAL: All materials shall meet or exceed all applicable referenced standards, local requirements, and conform to codes and ordinances of authorities having jurisdiction. Contractor must provide submittals of materials to the Civil
Engineer.