This solicitation is for the construction of an aircraft maintenance facility at Joe Foss Field ANG Base in Sioux Falls, South Dakota. The project includes site work, demolition, construction of a 38,975 square foot facility with administration and maintenance areas, utilities, HVAC systems, and other miscellaneous work. There are also three options that can be awarded which include interior finishes, additional construction, and demolition and parking lot construction. Interested contractors must register in SAM and on Contract Opportunities to access the solicitation and plans. The pre-bid conference is scheduled for a date in January 2022 with questions due by that date. The bid opening is January 20, 2022. This is a 100% small business set aside project with a NAICS code of 236220 and size standard of $39.5M average annual revenue. The anticipated contract value is between $10M-$25M.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04 SF1419 Abstract-W50S9622B0001.pdf | ||
| B.08 W50S9622B0001 Amendment 0003-Construct Aircraft Maintenance Shops (SF 30).pdf | ||
| B.08 W50S9622B0001 Amendment 0002-Construct Aircraft Maintenance Shops (SF 30).pdf | ||
| B.08 W50S9622B0001 Amendment 0001-Construct Aircraft Maintenance Shops (SF 1442).pdf | ||
| B.08 W50S9622B0001-Construct Aircraft Maintenance Shops.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LUXC099042
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 to solicitation number W50S9622B0001 - Construct Aircraft Maintenance Shops is changed as follow s: See next page and Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9622B0001
X 9B. DATED (SEE ITEM 11)
09-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2022
CODE
SDANG 114FW BASE CONTRACTING
1201 W ALGONQUIN ST
SIOUX FALLS SD 57104-0264
W50S96 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9622B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0001
1. Section 00100 Instructions do Bidders updated as follows:
a. Description: changed existing building demolition to site demolition for Option 3. Building demolition is not part of this option, site demo will be required.
b. Para 4.3. The date ALL questions are due is extended to from 10 Jan 2022 at 01:00 PM local time to 12 Jan 2022 at 01:00 PM local time.
c. Para 5.1. Clarification: email bids only to jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil. Do not email bids to anyone else.
d. Added Para 5.3. For those emailing bids or to attend the bid opening remotely we will have a conference phone in the room for you to listen in. You must register to attend the bid opening by sending your Name and phone number you will be calling from via email to jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil. The call-in number will be provided to you then. Only the phone number you register will be able to call in.
2. The following attachments are provided:
a. Amendment 0001 - Attachment 1 QnA1
b. Amendment 0001 - Attachment 2 1-B2 Geotechnical Report #1 (Reference Question 0019)
c. Amendment 0001 - Attachment 2 1-B3 Geotechnical Report #2 (Reference Question 0019)
d. Amendment 0001 - Attachment 3 Site Plan (Reference Question 0002)
e. Amendment 0001 - Attachment 4 Room WM117 Data Locations (Reference Question 0011)
f. Amendment 0001 - Attachment 5 Pre-Bid Conference Slides, Sign In, Notes
3. The following changes are hereby made to the solicitation:
a. Removed “The solicitation will include a BRAND NAME JUSTIFCATION for the following: Monaco – fire alarm reporting system; and Best Access Systems – door locks.” from sam.gov solicitation description.
b. Wage Determination updated. See section 00800.
c. Removed DFARS 252.223-7999.
4. All other terms and conditions of the solicitation remain unchanged.
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0004
The CLIN description has changed from Demolotion & Parking Lot to Site Demolotion & Parking Lot.
The CLIN extended description has changed from:
Option 3 - Provide existing building demolition; furnish and install a new parking lot on the east side of the building.
This option would add 30 days to the Period of Performance.
To:
Option 3 - Provide site demolition; furnish and install a new parking lot on the east side of the building. This option would add 30 days to the Period of Performance.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Description of the Project: Construct Aircraft Maintenance Facility. Project includes construction of a new 38,975 SF facility including administration and maintenance areas, site work, landscaping, demolition, concrete, asphalt paving, utilities, precast concrete walls, masonry, fully adhered membrane roofing, structural and miscellaneous metals, doors, windows and glazing, HVAC and DDC, plumbing, electrical and communications systems, fire and security alarm systems, fire suppression, flooring, demountable wall systems, painting, and other miscellaneous work as required. In addition to a base price for the work described above, the solicitation includes Options. There will be a total of three Options. Options are as follows: (1) interior finishes and construction within 7,045 SF of shelled space included in the Base Bid; (2) construction of additional shop and storage space of 6,805 SF (for increased total of 45,780 SF); (3) site demolition and construction of parking lot. This project shall meet LEED SILVER Certifiable level of construction; Energy Policy Act of 2005 compliance; and Executive Order 13693 compliance.
1. Instructions to Bidders:
1.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S9622B0001 –
Construct Aircraft Maintenance Shops, Project Number LUXC099042, at the 114th Fighter Wing Air National Guard Base, Sioux Falls, SD.
1.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
1.3. This solicitation is set-aside 100% for small businesses.
2. EVALUATION FOR AWARD.
Option CLINs will be evaluated in accordance with FAR 52.217-5.
3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
3.1. A pre-bid conference will be conducted on January 5, 2022 at 2:00 PM CST for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at 114th Fighter Wing – South Dakota Air National Guard Base, 1201 West Algonquin St, Sioux Falls, SD 57104. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference. All questions for the pre-bid conference must be submitted via email by seven calendar days prior to the pre-bid conference (current deadline is December 29, 2021, 1:00 PM CST but subject to change if the pre-bid conference date/time changes).
3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Lt Nick Benz at the following email address: nicholas.benz@us.af.mil and CC the following: jeremiah.minter@us.af.mil, eric.comes@us.af.mil and monty.c.eisenbraun.mil@army.mil.
Company Name:
Are you Prime or Subcontractor?
Name:
Email Address:
Phone Number:
Lt Benz will email a form back that will require information for each person attending along with instructions on submitting the form AND current COVID protocol while on base. Face coverings/masks must be worn at all times while on the installation. No exceptions.
3.3. This information must be provided 5 business days prior to the meeting in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary;
however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
3.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to the meeting. Please arrive
30-45 minutes early to allow sufficient time for processing. You will be required to present the following information upon arrival: a valid Drivers License or valid Government issued identification. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at https://sam.gov. The record will include minutes of the meeting, sign-in sheet, and presentation slides.
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1. Submit all questions in the format shown below by email to the Contracting Office at the email addresses shown below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W50S9622B0001 – Construct Aircraft Maintenance Shops
Email(s): jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil.
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address: _____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.3. All questions and requests for information (RFI) must be received NOT LATER THAN January 12, 2022, 1:00 PM CST . OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS
PROCESS.
4.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://sam.gov.
4.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.6. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system.
4.6.1. Amendments, if/when issued will be posted to https://sam.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
5. BID REPOSITORY AND BID OPENING:
5.1. Email is the preferred method of delivery for bids. Electronic documents shall be submitted in Microsoft Word format or Adobe Acrobat (PDF). Documents must not be locked or require a password. Bids may also be mailed to the address in Block 7 of the SF1442 or hand carried to the bid opening. Hand carried bids must be received by the Contracting Office and time stamped prior to the established IFB closing time. If you are planning on hand carrying bids or attending the bid opening, you must send an email at least seven days in advance of the IFB closing date to jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil.
Instructions for obtaining entry to hand carry bids or attend the bid opening will be provided upon request. Late receipt of bids may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
5.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
5.3. For those emailing bids or to attend the bid opening remotely we will have a conference phone in the room for you to listen in. You must register to attend the bid opening by sending your Name and phone number you will be calling from via email to jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil. The call-in number will be provided to you then. Only the phone number you register will be able to call in.
6. WAGE DETERMINATION:
6.1. Construction Wage Rates applicable to this project are SD20210028, Modification 3 dated 09/03/2021 as shown in Section 00800.
7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
8. CLAUSES:
8.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
9. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
10. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
11. BRAND NAME OR SOLE SOURCE JUSTIFICATIONS:
- None.
SECTION 00700 - CONTRACT CLAUSES
The following have been deleted:
252.223-7999 (Dev) Ensuring Adequate COVID-19 Safety Protocols for Federal
Contractors (Deviation 2021-O0009)
OCT 2021
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
"General Decision Number: SD20220028 01/07/2022
Superseded General Decision Number: SD20210028
State: South Dakota
Construction Type: Building
County: Minnehaha County in South Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract.
The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually.
If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/07/2022
BRSD0001-004 05/01/2020
Rates Fringes
BRICKLAYER.......................$ 38.04 3.31
CARP0587-002 05/01/2021
Rates Fringes
CARPENTER (Drywall Finishing/Taping, Drywall Hanging and Metal Stud Installation Only)...............$ 32.51 13.92
* ELEC0426-002 06/01/2021
Rates Fringes
ELECTRICIAN......................$ 30.83 9.5%+13.32
ELEV0033-004 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 46.30 34.765
FOOTNOTES: 8 Paid Holidays: New Year's Day; Memorial Day;Independence Day; Labor Day; Veteran's Day;
Thanksgiving Day; the Day after Thanksgiving & Christmas Day.
PLUM0300-015 05/01/2021
Rates Fringes
PIPEFITTER.......................$ 31.61 15.19
SUSD2012-025 08/21/2014
Rates Fringes
CARPENTER (Excludes Drywall Finishing/Taping, Drywall Hanging and Metal Stud Installation)....................$ 17.61 8.53
CEMENT MASON/CONCRETE FINISHER...$ 17.54 2.65
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 15.20 0.00
IRONWORKER, STRUCTURAL...........$ 23.91 12.05
LABORER: Common or General......$ 16.21 2.21
LABORER: Mason Tender - Brick...$ 20.96 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.90 0.00
PAINTER (Brush, Roller and Spray), Excludes Drywall Finishing/Taping.................$ 23.61 17.90
PLUMBER..........................$ 21.12 9.00
ROOFER...........................$ 13.82 1.34
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 19.28 7.63
TRUCK DRIVER: Dump Truck........$ 15.06 1.10
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
W50S9622B0001 – Construct Aircraft Maintenance Shops Question and Answer – Amendment 1
Amendment 1 – 10 January 2022
Question 0001: Sheet E100, note E026, is the 200 pair copper all new from building 64 to the new building 17? Sheet E100, note E032, are the (2) 24 strand fiber optic cables all new from building 64 to the new building 17? Also, this note ‘existing fiber and copper’, is this in addition to the 200 pair and (3) 24 strand FO; if so what are the pairs and strands of the existing? Will any of the FO or copper need spliced in the manholes? Do the FO cables need terminated in building 17 and 64? Are there existing EMPTY innerducts with pull ropes in the existing conduits, what size is the existing conduit or innerduct if there is any?
Response 0001:
Note E026: 200 pair copper will be new installed from contractor with new entrance protectors. No existing Copper.
Note E032: (3) 24 strand fiber terminates in Bldg 37 not Bldg 64. No existing copper coiled in manhole. Fiber will be long enough to extend into room S105 without splice and will need to be terminated in room S105. Distant end in Bldg 37 is terminated.
Interduct with pull rope is available to Bldg 64 for the new copper.
Question 0002: Sheet E100, Is there an overall site plan that shows the manholes and the location of building 64?
Response 0002: See Amendment 0001, Attachment 3.
Question 0003: Sheet E101, the communications conduits feeding the new building in room S105 (note E037) show to be from the existing comm inground box to the south, not the new manhole, is this correct? Are the (3) fiber optic cables not needed under the alternate #3, there is no plan note for them.
Response 0003: Replace manhole as noted E041 with a manhole capable of withstanding vehicle traffic. Delete notes E038 and E039.
Question 0004: E113, how many comm racks are in room S100?
Response 0004: Number of racks to be determined by total number of terminated drops serviced by room S100 meeting TIA standard for fill ratio.
Question 0005: What does the Cat6 copper backbone cabling need to terminate to in the comm rooms A105 & S100? (110 blocks;
wall or rack mounted? Or Cat6 patch panels?) Do these cable terminate on the service entrance protector in room S105, or does this room also need a patch panel or 110 block?
Response 0005: Cables will need to terminate on a rack mounted Cat6 patch panel in room S100 and S105. Do not terminate on the service entrance protector.
Question 0006: Is the intent to use Basket or Ladder style tray in the comm rooms?
Response 0006: Metal Cable Tray Systems shall comply with Specification Section 26 0536 2.02 D. Metal Wire Mesh/Basket Cable Tray.
Question 0007: Are the only rooms fed from comm room A105: A103 & A105?
Response 0007: Yes, room A103 is the only room fed by A105. Cross connect from A105 to S105 as noted in Note E348.
Question 0008: Room WM104, data on left wall, is this 4 cat6 and 2 fiber pair? Is this room feed from A105 or S105?
Response 0008: Yes, 4 Cat6 and 2 fiber pair. To be fed from room S105.
Question 0009: Room A102, do the desks in the middle of the room need communication cabling?
Response 0009: Note E360 (J) change to (2) additional data drop locations (4 data per drop).
Question 0010: E112, room WM105 data location, is this 4 fibers and 2 data?
Response 0010: Misprint, should be 4 data, no fiber.
Amendment 0001 - Attachment 1
Question 0011: E112, room WM117, there are no data locations shown in this room, are they needed?
Response 0011: Provide data drops according to the attached (updated) drawing for room WM117. See Amendment 0001, Attachment 4.
Question 0012: E112, room WM119 & 118, floorbox locations, if we need to terminate the data cable jacks in faceplates, we will only be able to fit 6 per compartment. If we do not need a faceplate/frame to mount the jacks and can only terminate on the jacks and leave loose in the floorbox, 8 per compartment will work. Or we will need to add additional floor boxes for the data locations.
Response 0012: Plan sheet E112 – locations noted as E254 with 8 data jacks shall be changed to 6 data jacks at each location terminated in faceplates.
Question 0013: Will the Bicsi RCDD be required for this project? Or will Bicsi Technicians be acceptable?
Response 0013: BICSI Technician is acceptable.
Question 0014: Are you looking for single mode or multi mode for the horizontal fiber optic cable? LC style inserts in the faceplates for the Fiber optic jacks, what color?
Response 0014: Multi mode from comm room to data drop with LC terminations. Shielded cable and shielded ends for SIPR.
SIPR cabling must be marked with red every 3 feet. No color requirements or any other special requirements will be needed from the contractor/installer for general communications requirements.
Question 0015: Any color requirements besides standard fiber cable colors or the Horizontal Fiber optic cable?
Response 0015: No special color requirements.
Question 0016: Do you have an estimated value for this project? Need it for the bid bond.
Response 0016: Construction project magnitude is between $10M and $25M. Bid bond needs to cover bid.
Question 0017: Will Procore be an approved equal for submittal exchange?
Response 0017: Submittal exchange will need to be approved during the submittal process after contract award.
Question 0018: Spec section 099723 Concrete and Masonry Coatings is calling to seal concrete floors, however 033511 Concrete Floor Finishes is also a spec for sealing concrete. Please clarify.
Response 0018: Specification Section 09 9723 applies only to (concrete and masonry) walls. Specification Section 03 3511 applies to Concrete Floor Finishes.
Question 0019: The specs state that there are 2 Geotechnical reports available for inspection at the US Government’s office during normal business hours. We and our subcontractors do not have access to that office; is there any way the reports could be shared with us electronically?
Response 0019: See Amendment 0001, Attachment 2.
Question 0020: Please confirm the email address to use when submitting the bid thru email. It is unclear in section 5.1 - Email is the preferred method of delivery of bids.
Response 0020: All emailed bids must be sent ONLY TO jeremiah.minter@us.af.mil, monty.c.eisenbraun.mil@army.mil, monty.c.eisenbraun.mil@mail.mil and eric.comes@us.af.mil. Do not send bids or pricing info to any others.
The following Questions were asked during the Pre-Bid Meeting
Question 0021: Please clarify submittal requirements. Excerpt from 52.236-21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) - ALTERNATE I (APR 1984). Please confirm that all submittals will be done electronically in accordance with Section 01 3000, Administrative Requirements.
Response 0021: IAW FAR 52.236-21(g), “The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated)…”. In Section 01 3000, Administrative Requirements, Section 3.12, “All construction submittals (e.g., shop drawings, coordination drawings, product data, etc.) are to be provided in an electronic (.pdf) format and transmitted and stored on either an Internet based submittal service or an FTP server accessible by all parties involved (Construction Contractor, subcontractors, Architect, Architect's consultants, Commissioning Authority, and U.S. Government personnel) for upload and download of electronic files.”
Question 0022: In the Solicitation, Offer and Award, Section 00100, para 4.3 it states “All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day after the pre-bid conference; current deadline is January 10, 2022, 1:00 PM CST . OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.” Please confirm that per the question and answer at the pre bid meeting, the deadline for submitting questions is January 10th.
Response 0022: All questions are currently due January 10, 2022, 1:00 PM CST. Working day should be calendar day.
Question 0023: Request to have the Government provide copies of the Geotechnical Reports as discussed at pre bid meeting.
Response 0023: See Response 0019.
Question 0024: Please confirm that other than Federal Aviation Administration permits, no other permit are required by the contractor.
Response 0024: No City or State Building Permits will be required from the Contractor. Standard Environmental erosion control plan may be required by the State of SD – See Specification Section 01 5713 Temporary Erosion and Sediment Control.
Question 0025: Clause 52.236-14 – AVAILABILITY AND USE OF UTILITY SERVICES. This clause references use of existing utility services. What utilities will be provided by the Government and what utilities will be charged to the contractor?
Response 0025: Specification Section 01 1000 1.22 – Utilities is hereby changed to the following:
1.22 TEMPORARY FACILITIES
A. The Construction Contractor shall contact local utility providers for connection and any required metering for this project. The Government will be responsible for the cost of all utilities used on the project, including but not limited to, water, sanitary sewer, electricity, and natural gas charges by the utility companies or the U.S. Government for the duration of the project. The Construction Contractor shall be responsible for the costs of propane and heaters for temporary heating.
B. If the Construction Contractor modifies or alters any existing utilities, the Construction Contractor is responsible for furnishing and paying for any such modifications and all additional temporary utility services other than those already identified above. This includes arranging with utility companies for these additional services. Any expense incurred to gain access to utilities (temporary tap-ins, temporary meters, etc.) shall be the responsibility of the Construction Contractor in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14).
Any utilities modified by the Construction Contractor will be returned to their original or final configurations before the end of the contract.
C. The Construction Contractor is responsible for all costs of other temporary facilities such as those described in this
Section, Section 01 5000 - TEMPORARY FACILITIES AND CONTROLS, Section 01 5713 - TEMPORARY EROSION AND SEDIMENT CONTROL, Section 01 5813 - TEMPORARY PROJECT SIGNAGE, and Section 01
5950 - SAFETY AND HEALTH.
Question 0026: Question on required taxes to be paid by the contractor. Verify that contractors are required to pay all taxes in accordance with state and local requirements.
Response 0026: Contractors shall contact the State of SD Department of Revenue for clarification on what taxes are applicable to this project.
Question 0027: Clause 252.223-7999 (Dev) – Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009). Question was raised at the pre bid meeting as to the requirement for contractor’s and subcontractor’s entire company to be vaccinated. Please confirm what protocols are currently required to work on base.
Response 0027: This clause has been removed from the solicitation. Current Base protocol requires unvaccinated individuals wear facemasks anytime they are within six feet of SDANG employees. All contractors must register to come on base and are required to fill out a Health Risk Assessment each day prior to coming on base.
Question 0028: On sheet C105, please provide demolition requirements to coordinate with utility work.
Response 0028: Response pending.
Question 0029: Drawing AS102 Note 5 and 6 indicate building 20 & 25 will be demolished by the U.S government, please confirm.
Response 0029: Response pending.
Question 0030: Specs indicate Geotechnical report is available by request, can the geotechnical report be made available for us to review?
Response 0030: See Response 0019.
Question 0031: Can you please confirm if this project is Tax Exempt?
Response 0031: See Response 0026.
Question 0032: Flooring - Can Information for product and manufacturer be made available for review?
Response 0032: Flooring products must comply with Division 09 of the Specifications. No product submittals will be accepted or reviewed prior to issue of the Contract.
Question 0033: Drawing A801 General Notes (B) Indicate Fire extinguishers will be furnished and installed by the U.S government, will that include the FE Cabinets?
Response 0033: Fire Extinguisher Cabinets are part of the Base Bid. See Specifications Section 10 4400.
Question 0034: Drawing A107 Note (13) indicated Bridge Crane location Area B for Option 2, Note 13 indicates 2 locations R- ES100 and R-AS100/EP104. Please clarify or confirm.
Response 0034: Note 13 shown in room AS-100 is a misprint; change to Note 12. Only one Bridge Crane is required as part of Option 2.
Question 0035: Sheet A103 shows a wall between room ES100 and TC102 but does not show a wall type. Please provide information on the wall type.
Response 0035: Response pending.
Question 0036: Sheet A601 shows the Glazed Aluminum Curtain Wall types. However, no other drawing indicates the location of these curtain wall types. Please provide a drawing showing the locations.
Response 0036: See Plan Sheets A201 & A202, Keynotes 16 & 17.
Question 0037: The security fence for the aircraft area is tied into the building to be removed. Removal of the buildings and parking areas where the fence is located will need to be done as one of the first items on the project. Will the security fence be moved away from the work zone before the project begins?
Response 0037: See Plan Sheet AS103, Keynote 13.
Question 0038: Will the ABIs 1-2-3 (options) be adds to the base bid or deducts?
Response 0038: All Options will be in addition to the Base Bid as they represent additional work.
Question 0039: To what extent do we demo the electrical for the two buildings that come down?
Response 0039: See Plan Sheet E101 for extents of removal.
Question 0040: Line Item 0004/Option 3: Provide existing building demolition; furnish and install a new parking lot on the east side of the building. Which building is to be demolished under this Option?
Response 0040: Line Item 0004, Option 3 changed with Amendment 0001. Existing building demolition was changed to Site demolition.
Question 0041: Are buildings 20 and 25 being demolished by the Government or contractor? Plans state Government.
Response 0041: Response pending.
Question 0042: In regards to handing in bids and attending the bid opening, what is the process?
Response 0042: You must register to attend the bid opening. Per Section 00100, para 5.1, “If you are planning on hand carrying bids or attending the bid opening, you must send an email at least seven days in advance of the IFB closing date to jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil. Instructions for obtaining entry to hand carry bids or attend the bid opening will be provided upon request. Late receipt of bids may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
Question 0043: I have a question about the steel rod x-bracing in front of the aluminum windows. Are these structural? Will they need to be in place prior to installing the windows? This could cause great difficulty in installing the windows since I cannot find an impacted rated framing system that is inside glazed.
Response 0043: The columns are structural and will be installed along with the steel. The x-bracing is decorative and can be installed after the curtain wall is in place.
Question 0044: This and the next five questions are in regards to flooring in drawings A702 and A703. What types of chemicals will be used in these areas?
Response 0044: Standard industrial shop chemicals. Parts washing fluid, grease, battery maintenance shop, ect.
Question 0045: There are a number of exterior doors into these rooms. In the winter will these doors remain closed, is temp fluctuation an issue in any area?
Response 0045: These doors will have minimal traffic. The project was designed with South Dakota weather conditions in mind.
Question 0046: What type of vehicle traffic will happen in these areas, what type of wheels? (Forklifts, hand trucks, rubber vs metal wheels etc.)
Response 0046: Occasional forklift, some hand truck, mostly all rubber wheels.
Question 0047: What type of weight and how much weight will be hitting the floor at any time?
Response 0047: Other than a dropped occasional hand tool the floors should not have any impact areas.
Question 0048: What type of cleaning procedures are done in these rooms? (chemicals, machinery, power wash, temp of water)
Response 0048: Power washer/scrubber, sweeping & mopping. Water temp from the tap.
Question 0049: Any thoughts to wanting a solid color or more of a decorative system at this time?
Response 0049: No intention of varying from the Plans and Specifications.
Question 0050: On the fiber backbone per Sheet E113 Note E349 calls out Single-mode fiber, is the intention for the fiber to the workstations per the Voice and Data Legend to use Single-mode for that as well?
Response 0050: Multi mode 50 Micron to the desktop and cat 6 copper.
Question 0051: Is there a specific quantity of Equipment racks required for Comm. Rooms S105, S100 and A105 or just size accordingly?
Response 0051: Size equipment rack accordingly.
Question 0052: Sheet E112 Notes E341 and E342, how much LMR cable is needed to reach connections outside for radio tower?
Response 0052: Cable will stop at polyphaser and Government will extend to tower.
Question 0053: Sheet E100 Note E032, does this fiber need to be disconnected from somewhere and pulled back? Also is the intention for the contractor to do the terminations on these fibers? If so what type of fiber is it?
Response 0053: Fiber is in manhole/vault extend from her into the new building using SCAPC.
Question 0054: Sheet E101 Note E038, does this note coincide with Note E032 on Sheet E100 as far as installation of the Telecommunications cabling?
Response 0054: Response pending.
Question 0055: Specifications 271005, 2.03 / 2.04 is there a certain manufacturer that needs to be used for this project?
Response 0055: No specific manufacturer is specified. Products must meet the requirements of the Specifications.
Question 0056: In the PreBid Conference Slide Show, slide 32 under electrical it mentions New site fiber optic cable? Is there a new site fiber cable outside of the existing mentioned in questions 4. and 5?
Response 0056: New fiber was shown if the contractor didn’t want to use the existing fiber or if the fiber was not long enough to reach into the new communications closet.
Question 0057: Will the bid opening be conducted virtually for those that submit bid via email?
Response 0057: No. We will have a conference phone set up so that you can listen to the bid opening. You must register to attend the bid opening by sending your Name and phone number you will be calling from via email to jeremiah.minter@us.af.mil, eric.comes@us.af.mil AND monty.c.eisenbraun.mil@army.mil. The call-in number will be provided to you then. Only the phone number you register will be able to call in.
Question 0058: Panels EML2 and H1 do NOT have SPD’s listed on the panel schedules but it does show SPD’s on the One-Line.
Response 0058: Response pending.
Question 0059: Panel EPL1 is only a 150A Main Breaker panel but it has a 200/3 branch breaker feeding EP400.
Response 0059: Response pending.
Question 0060: Panel ESL1 is supposed to be fed from EPL1 but I do NOT see a 60A breaker to feed it nor does it have Feed Thru Lugs listed.
Response 0060: Response pending.
Question 0061: In Parts Wash Shop room PD103, there is a disconnect shown as 200A/3P D.S. but it is circuited to panel PDH1-1,3,5 which is only a 20/3 circuit.
Response 0061: Response pending.
GEOTEK ENGINEERING
& TESTING SERVICES, INC.
909 East 50th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773
October 20, 2015
MSH Architects 625 S. Minnesota Avenue, Suite 204 Sioux Falls, South Dakota 57104
Attn: Dave Sellers
Subj: Geotechnical Exploration Aircraft Maintenance Shop – Phase 1 South Dakota Air National Guard Sioux Falls, South Dakota
GeoTek #15-C14
This correspondence presents our written report of the geotechnical exploration program for the referenced project. Our work was performed in accordance with your authorization. We are transmitting an electronic copy of our report for your use.
We thank you for the opportunity of providing our services on this project and look forward to continued participation during the design and construction phases. If you have any questions regarding this report, please contact our office at (605) 335-5512.
Respectfully Submitted, GeoTek Engineering & Testing Services, Inc.
Brennen Ahlers
Brennen Ahlers, PE Project Manager
Amendment 0001 - Attachment 2
Aircraft Maintenance Shop – Phase 1 Page 2 of 14 Sioux Falls, South Dakota GeoTek #15-C14
GeoTek Engineering and Testing Services, Inc.
TABLE OF CONTENTS
INTRODUCTION
PROJECT INFORMATION
SCOPE OF SERVICES
FIELD DATA
SITE LOCATION & DESCRIPTION
GROUND SURFACE ELEVATIONS & TEST BORING LOCATIONS
SUBSURFACE CONDITIONS
WATER LEVELS
ENGINEERING REVIEW & RECOMMENDATIONS
PROJECT DESIGN DATA
DISCUSSION
SITE PREPARATION
FOUNDATION LOADS & SETTLEMENT
FLOOR SLAB
FROST PROTECTION
EXCAVATION
MATERIAL TYPES & COMPACTION LEVELS
DRAINAGE
CONSTRUCTION CONSIDERATIONS
GROUNDWATER & SURFACE WATER
DISTURBANCE OF SOILS
COLD WEATHER PRECAUTIONS
EXCAVATION SIDESLOPES
OBSERVATIONS & TESTING
EXCAVATION
TESTING
SUBSURFACE EXPLORATION PROCEDURES
TEST BORINGS
SOIL CLASSIFICATION
WATER LEVEL MEASUREMENTS
LABORATORY TESTS
LIMITATIONS
STANDARD OF CARE
APPENDIX A FIGURE 1 – SITE MAP
BORING LOGS
SOILS CLASSIFICATION
SYMBOLS & DESCRIPTIVE TERMINOLOGY
Aircraft Maintenance Shop – Phase 1 Page 3 of 14
GEOTECHNICAL EXPLORATION
AIRCRAFT MAINTENANCE SHOP – PHASE 1
SOUTH DAKOTA AIR NATIONAL GUARD
SIOUX FALLS, SOUTH DAKOTA
GEOTEK #15-C14
INTRODUCTION
Project Information
This report presents the results of the recent geotechnical exploration program for the proposed aircraft maintenance shop for the South Dakota Air National Guard in Sioux Falls, South Dakota.
Scope of Services
Our work was performed in accordance with the authorization of Dave Sellers with MSH
Architects. The scope of work as presented in this report is limited to the following:
1. To perform six (6) standard penetration test (SPT) borings to gather data on the subsurface conditions at the project site.
2. To perform laboratory tests that include moisture content and dry density.
3. To prepare an engineering report that includes the results of the field and laboratory tests as well as our earthwork and foundation recommendations for design and construction.
The scope of our work was intended for geotechnical purposes only. This scope of work did not include determining the presence or extent of environmental contamination at the site or to characterize the site relative to wetlands status.
FIELD DATA
Site Location & Description
The proposed aircraft maintenance shop will be constructed within the limits of the base of the
South Dakota Air National Guard in Sioux Falls, South Dakota. The address of the base is 1201
W. Algonquin Street. The area located for the designated shop is located north of Building 20.
The current site features include the following: Building 24, Building 26, sidewalks, pavement
Aircraft Maintenance Shop – Phase 1 Page 4 of 14 areas (asphalt and concrete) and grass covered areas. Building 24, Building 26, the sidewalks and portions of the pavement areas will be demolished in preparation for the new shop.
Ground Surface Elevations & Test Boring…