Atch 6 Solicitation Questions Answers.pdf

PDF 107 KB Posted

Attached to
Installation Notification and Warning System (INWS)
Solicitation number
W50S9524Q0002
Issued by

About this file

This document is a set of Questions and Answers related to Solicitation W50S9524Q0002 for an Installation Notification and Warning System (INWS) at McEntire JNGB in South Carolina.

The key details are:

  • The solicitation requires the design, installation, configuration, and integration of an INWS system in accordance with the attached Performance Work Statement.
  • Questions cover the locations of existing equipment, available drawings, as-built format requirements, ceiling types, buildings to be added or removed from the project, priority order for work on buildings, and PPS installation status.
  • A site visit is scheduled for April 16th and advance registration is required.
  • The agency issuing the solicitation is the Department of the Army National Guard.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers Solicitation W50S9524Q0002

Q1) What buildings have ISUs and / or speakers installed?

A1) Contractor must verify locations/placement of existing equipment.

Q2) Can the drawings for renovated buildings 310, 979, and 1040 be provided?

A2) Drawings for all buildings attached.

Q3) In what format should as-builts be submitted?

A3) As-builts must be submitted in .pdf or CAD format only

Q4) What types of ceilings are present in each space?

A4) See attached Ceiling Identification document. The key for the ceiling areas is as follows:

Blue = Open ceiling Yellow = Hard/Sheet Rock ceiling RED X = Remove from design Orange = Secure Area requiring stand alone zone.

Other notes have been entered showing areas requiring advance coordination.

Also refer to attached memo identifying explosive/hazardous areas.

Q5) What buildings will be added to or omitted from this project?

A5) We are removing buildings 958, 666, and 62 from this project. Add buildings 249 and 252.

Q6) N/A A6) As a reminder, there needs to be an outdoor speaker added to cover the SCANG side of the base (Southwest area).

Q7) Can you provide a priority list identifying the order in which buildings should be worked on?

A7) See Building Priority List below, ordered first priority to last priority.

BLDG NAME

1040 WPNS

1057 ECM

451 CLASS IX

453 L' COMPANY

CONGAREE ARMORY

ARNG HANGAR 456

CSMS

212 LRS

253 HANGAR

979 SFS

216 Avionics

AGE 1148

1046 FUEL BARN

251 ENGINE SHOP

1053 NDI

1157 POL

984 MDG

1071 CES

1080 GROUNDS MAINT

258 COMM

1163 EV

958 LGX

210 MOTOR POOL

157 BX

1060 HAZMAT

243 GYM

301 JFHQ

1070 COMMAND POST

260 ACA

200 FD Temp

310 MUNZ

249 OPS

259 FW HQ

Q8) Can you provide PPS installation status for each facility.

A8) See PPS installation status spreadsheet below.

BLDG NAME PPS

157 BX No

200 FD Temp Yes

210 MOTOR POOL Yes

212 LRS Yes

216 Avionics Yes

243 GYM Yes

249 OPS Yes

251 ENGINE SHOP Yes

253 HANGAR Yes

258 COMM Yes

259 FW HQ Yes

260 ACA Yes

301 JFHQ Yes

310 MUNZ Yes

451 CLASS IX

453 L' COMPANY

454 ARNG HANGAR

456 ARNG HANGAR

465 ARNG HANGAR

472 CSMS

473 CSMS

474 CSMS

475 CSMS

476 CSMS

958 LGX Yes

979 SFS No

984 MDG No

1040 WPNS No

1046 FUEL BARN Yes

1053 NDI Yes

1057 ECM Yes

1060 HAZMAT Yes

1070 COMMAND POST Yes

1071 CES Yes

1080 GROUNDS MAINT Yes

1147 AGE Yes

1148 AGE Yes

1149 AGE Yes

1157 POL Yes

1163 EV Yes

CONGAREE ARMORY

Q9) Is a man-lift available for use on this project?

A9) Contractor must provide all necessary equipment.