W50S9523B00020001 Amendment.pdf
PDF 260 KB Posted
- Attached to
- Hot Cargo Pad Federal contract opportunity
- Solicitation number
- W50S9523B0002
- Issued by
- Department of the Army National Guard
About this file
This document is an amendment to a federal solicitation for additional work at a National Guard facility. The solicitation is being amended by the W7NZ USPFO Activity South Carolina Air National Guard to remove references to brick masonry from all contract line item descriptions and incorporate answers to questions from a pre-bid conference. The additional work involves furnishing equipment, labor, materials, tools, and transportation to complete work in accordance with attached drawings and specifications for contract line item numbers 0002 through 0005. The solicitation number is W50S9523B0002 for a hot cargo pad project through the Department of the Army National Guard.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSTE 159098
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document referenced in Item 9A or 10A, as heretofore changed, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate answ ers to questions submitted after the pre-bid conference/site visit and provide a copy of the pre-bid conf erence sign in roster . Additionally references to brick masonary are being removed f rom all option CLIN descriptions.
Please note, mailing address is 9 National Guard Road, as compared to bid opening/hand delivered repository w hich is 1 National Guard Road (See Section 00100, paragraph 5). All other terms and conditions of this solicitation remain the same. POC: Lt Badri Paul E. Francis badri.francis.1@us.af.mil / 803-647-8542
1. CONTRACT ID CODE P AGE OF P AGES
J 1 3
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY 12-Aug-2023
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer)(Signature of person author ized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W50S9523B0002
X 9B. DAT ED (SEE IT EM 11)
18-Jul-2023
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s amendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE P LACE DESIGNATED FOR THE RECEIPT OF OFFERS P RIOR TO THE HOUR AND DATE SP ECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of thi s amendment you desire t o change an offer already submit ted, s uch change may be made by t elegram or let ter, provided each t elegram or l ett er makes re ference to the sol ici tat ion and this amendment , and is received prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO.(If appli cable )
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2023
CODE
W7NZ USPFO ACTIVITY SCANG 169
1325 SOUTH CAROLINA RD
EASTOVER SC 29044- 5000
W50S95 7. ADMINISTERED BY (If other t han item 6)
4. REQUISITION/P URCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
x 1
803-647-8542 badri.francis.1@us.af.mil
W50S9523B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
USPFO SC 169 MISSION SUPPORT CONTRACTING
1325 SOUTH CAROLINA ROAD
EASTOVER SC 29044-5000
to
W7NZ USPFO ACTIVITY SCANG 169
1325 SOUTH CAROLINA RD
EASTOVER SC 29044-5000
CLIN 0002
The CLIN extended description has changed from:
Contractor shall furnish all necessary equipment, labor, materials, tools, andtransportation needed to accomplish additional brick masonry IAW attachedDrawings and Specifications
To:
Contractor shall furnish all necessary equipment, labor, materials, tools, andtransportation needed to accomplish additional work IAW attachedDrawings and Specifications
CLIN 0003
Contractor shall furnish all necessary equipment, labor, materials, tools, andtransportation needed to accomplish
Contractor shall furnish all necessary equipment, labor, materials, tools, and transportation needed to accomplish
CLIN 0004
Contractor shall furnish all necessary equipment, labor, materials, tools, andtransportation needed to accomplish
W50S9523B0002
Contractor shall furnish all necessary equipment, labor, materials, tools, and transportation needed to accomplish
CLIN 0005
Contractor shall furnish all necessary equipment, labor, materials, tools, andtransportation needed to accomplish
Contractor shall furnish all necessary equipment, labor, materials, tools, and transportation needed to accomplish additional work IAW attachedDrawings and Specifications
(End of Summary of Changes)
| 2023-08-12T09:53:19-0400 | |
| FRANCIS.BADRI.PAUL ELIAS.1269354352 |
File details come from the government source that posted it. Updated .