Amendment 01 - Questions and Answers.pdf
PDF 104 KB Posted
- Attached to
- Fiber Optic Cable Installation
- Solicitation number
- W50S9520Q0026
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 03 - Drawing (Sep 2019).pdf | ||
| Attachment 01 - Performance Work Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 01 ‐ Questions and Answers: Solicitation W50S95‐20‐Q‐0026, Fiber Optic Cable Installation
Q: Can the government provide drawings, maps, and/or lengths for the 36 strand single mode fiber to be installed?
A: Drawing attached. Bldg. 259 is located where Bldg. 252 is shown. There is a hand hole located between MH1A and Bldg. 259.
Q: What is the length of the fiber to be installed?
A: Approximate lengths not including service loops: Bldg. 258 to MH1 15’, MH1 to MH1A 260’, MH1A to HH259
65’, HH259 to Bldg. 259 55’. All measurements are estimates only. The responsibility to verify measurements will be at the risk to the contractor. A site visit is scheduled at 0900 Hrs on September 08, 2020 in order to allow all interested parties with the opportunity to take measurements. Please provide a name, driver’s license number and state of issue for each person wishing to attend the site visit to jonathan.bailey.10@us.af.mil no later than close of business on Friday September 4, 2020.
Q: Can the government provide the total number of manholes and hand holes between buildings?
A: 2 Man holes and 1 Hand hole.
Q: Is inner duct required or is there existing inner duct?
A: Inner duct is required.
Q: How far does the fiber route into buildings 258 and 259?
A: All measurements are estimates only. The responsibility to verify measurements will be at the risk to the contractor. A site visit is scheduled at 0900 Hrs on September 08, 2020 in order to allow all interested parties with the opportunity to take measurements. Please provide a name, driver’s license number and state of issue for each person wishing to attend the site visit to jonathan.bailey.10@us.af.mil no later than close of business on Friday
September 4, 2020.
Q: Are the fiber connectors LC, ST or SC type?
A: SC
Q: Is there a wage determination (SCA/DBA)?
A: The SCA wage determination for Richland County SC in effect on the contract award date will be incorporated with all labor rates anticipated to fall within Occupational Code 23000 ‐ Maintenance and Repair Occupations.
Q: Is a site visit being considered and/or planned?
A:
Q: Will the cabling footage needed be provided?
A: All measurements are estimates only. The responsibility to verify measurements will be at the risk to the contractor. A site visit is scheduled at 0900 Hrs on September 08, 2020 in order to allow all interested parties with the opportunity to take measurements. Please provide a name, driver’s license number and state of issue for each person wishing to attend the site visit to jonathan.bailey.10@us.af.mil no later than close of business on Friday
September 4, 2020.