Replace Lift Station Bldg 16. Contractor Questions Version 2.pdf
PDF 320 KB Posted
- Attached to
- Replace Lift Station Bldg 16 Federal contract opportunity
- Solicitation number
- W50S8W23R0004
- Issued by
- Department of the Army National Guard
About this file
This document contains questions and answers regarding a federal contract opportunity to replace lift station building 16. The opportunity involves installing a new traffic-rated access hatch between 32-36 inches square or rectangular on an existing 48-inch diameter wet well. New rails, floats, cables, and hour meters for the pumps are required. Asphalt or concrete will replace demolished pavement depending on material availability. The solicitation number is W50S8W23R0004 from the Department of the Army National Guard to replace the lift station building. Bid bonds of 20% and payment performance bonds of 20% are required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Replace Lift Station Bldg 16. Contractor Questions.pdf | ||
| Original Pump Submittal.pdf | ||
| Attachment 3- EAL Form 12 Visitor Access.pdf | ||
| Attachment 1 - SOW - Replace Lift Station Bldg 16.pdf | ||
| W50S8W-23-R-0004 Repair Lift Station Bldg 16 Solicitation.pdf | ||
| Attachment 2 - Wage Determination 6 Jan 23.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Lift Station Bldg #16 Contractor Questions.
Questions: Black
Answers: Red
1. What size is required for the new lid and access hatch?
A square double door hinged access lid is the preferred option (See Figure one attached below). 36” X 48” access lid or similar size would be adequate since this will allow easy access to the lift pumps. The lid, however, would need to be traffic rated since it is being installed in a designated traffic area.
2. Will the lift station require new rails and if yes would they be galvanized or stainless-steel material?
New rails will be required, and we would recommend they be stainless steel to prevent corrosion.
3. Will the project require all new floats and cables to be installed?
All new floats and cables will need to be installed. Existing floats and cables are damaged and will need to be replaced.
4. Should the hour meters for both pumps be replaced in the control panel?
Since the pumps are being replaced new hour meters should be considered. Also, existing hour meters do not seem to be tabulating pump hours accurately so they will need to be replaced eventually.
5. Will there be a one-foot midsection above grade for access lid?
A raised midsection should not be installed since this is a designated traffic area and would also cause problems during snow removal. It would be preferred that the new reinforced lid be installed flush with existing pavement.
6. If there is a raised midsection above grade will bollards need to be installed?
Traffic rated access lid should be installed flush with existing pavement therefore not hindering the flow of traffic through the area. Since this is the case bollards will not be required.
7. Will demoed pavement areas be replaced with asphalt or concrete?
Due to the time of year the project will be taking place asphalt material may be difficult to obtain. If this is the case contractor will be permitted to use concrete to replace demoed pavement.
8. What percentage will be required for payment performance bonds?
20% of costs
9. What percentage will be required for bid bonds on the project?
20% of costs
Figure 1 Double Door Access Lid
10. Q&A #1 indicates a 36” x 48” access hatch. The existing wet well is only 48” diameter so installing a hatch that big would require a 60” or 72” diameter lid that would not fit tongue and groove into the existing wet well, nor have a watertight seal. A 36” x 36” access hatch is the biggest that would fit without having to modify the barrel section.
Answer: Given the diameter of the existing. barrel section, a 36” X 48” access hatch will not. fit without. modifications to the existing barrel section. We do not wish for modifications to be done on the existing barrel section, so we propose the following.
For this project we will require a square or rectangular traffic rated and hinged access hatch. A double door option is preferred. The access hatch should be at a minimum 32” X 32” with the maximum size being a 36” X 36” access hatch. Rectangular access hatch options that are within this size range are also acceptable. The largest access hatch size possible is preferred since easy access to the lift station pumps is required for future maintenance.