Questions for Roof Repairs

1. Do the drawings show the respective roof areas with square footage?

ANSWER: Additional drawings will be attached to show SF. However, contractor must verify SF prior to construction.

2. What do you mean by “repair?”

ANSWER: Any portion of the roof that does not meet current EPDM standards for new construction shall be removed and replaced or repaired to new (EPDM) installation specifications. Once repaired or replaced to new construction standards install spray foam roof.

The contractor should plan for repairing at least 10% of the roof surfaces.

3. What’s the insulation value?

ANSWER: The minimum R value is R-38

4. What is the thickness of the existing system and its insulation?

ANSWER: Cross sections and roof plans are part of the solicitation. The minimum insulation value is R-38.

5. Is the Air Guard going to all spray foam roofs on their buildings?

ANSWER: Not necessarily. The Army guard has had good success with SPF roofs. We are noticing EPDM has issues that require constant maintenance and repair. We are looking to see how well SPF will work for our facilities.

6. What are the specs for the project?

ANSWER: The specs have been added to the solicitation on beta.sam.gov

7. Is this a Spray Polyurethane specification only or can EPDM or another roof product be utilized?

ANSWER: This is a Spray Polyurethane roof specified project, see project specs as part of the solicitation.

8. Will the Pre Bid attendance roster be posted?

ANSWER: Yes

9. There are drawings on the solicitation. Is there any other documentation providing the scope?

ANSWER: The Performance Work Statement is on Page 66 of Solicitation W50S8W-20-R-0010 and it provides the scope of work for this project. The specifications have now been uploaded to the solicitation.

10. What is the method of submittal? Can we hand deliver the bid?

ANSWER: Electronic submittal is preferred to desiree.santos.2@us.af.mil . Hand delivered can be arranged.

11. What is the method of selection? Is it low bid?

ANSWER: Method of selection will be Lowest Price Technically Acceptable