Questions for Roof Repairs (002).pdf

PDF 71 KB Posted

Attached to
Roof Repairs Federal contract opportunity
Solicitation number
W50S8W20R0010
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Roof Repairs, newest first.
File Type Posted
Sign In Site Visit Roof Repairs.pdf PDF
DPEZ 202105 Spray Foam Roof Specification.doc DOC document
total SF bldg 30 33.pdf PDF
Combined Bldg 30 Drawings.pdf PDF
153aw Form 10 EAL- Roof Repair Site Visit.pdf PDF
Combined Bldg 33 Drawings.pdf PDF
B.08 Solicitation 20R0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Roof Repairs

1. Do the drawings show the respective roof areas with square footage?

ANSWER: Additional drawings will be attached to show SF. However, contractor must verify SF prior to construction.

2. What do you mean by “repair?”

ANSWER: Any portion of the roof that does not meet current EPDM standards for new construction shall be removed and replaced or repaired to new (EPDM) installation specifications. Once repaired or replaced to new construction standards install spray foam roof.

The contractor should plan for repairing at least 10% of the roof surfaces.

3. What’s the insulation value?

ANSWER: The minimum R value is R-38

4. What is the thickness of the existing system and its insulation?

ANSWER: Cross sections and roof plans are part of the solicitation. The minimum insulation value is R-38.

5. Is the Air Guard going to all spray foam roofs on their buildings?

ANSWER: Not necessarily. The Army guard has had good success with SPF roofs. We are noticing EPDM has issues that require constant maintenance and repair. We are looking to see how well SPF will work for our facilities.

6. What are the specs for the project?

ANSWER: The specs have been added to the solicitation on beta.sam.gov

7. Is this a Spray Polyurethane specification only or can EPDM or another roof product be utilized?

ANSWER: This is a Spray Polyurethane roof specified project, see project specs as part of the solicitation.

8. Will the Pre Bid attendance roster be posted?

ANSWER: Yes

9. There are drawings on the solicitation. Is there any other documentation providing the scope?

ANSWER: The Performance Work Statement is on Page 66 of Solicitation W50S8W-20-R-0010 and it provides the scope of work for this project. The specifications have now been uploaded to the solicitation.

10. What is the method of submittal? Can we hand deliver the bid?

ANSWER: Electronic submittal is preferred to desiree.santos.2@us.af.mil . Hand delivered can be arranged.

11. What is the method of selection? Is it low bid?

ANSWER: Method of selection will be Lowest Price Technically Acceptable

File details come from the government source that posted it. Updated .