Questions and Answers DPEZ212204 Basewide Heat Detectors

1. All existing fire alarm panels are Monaco M-2 Conventional panels with the exception of Buildings 31 and 36 which are Monaco addressable MAAP+ panels.

Is that correct?

A: Yes, this information is accurate.

2. Are there any explosion proof heat detectors required in building 14? And if so how many?

A: Yes. All heat detectors in building 14 must be explosion proof.

3. Are any of the 139 heat detectors reporting to a releasing panel? And if so what buildings?

A: No. None of the heat detectors report to a releasing panel.

4. Is replacement of any damaged ceiling tiles a requirement? And if so is the government providing those?

A: Replacement of damaged ceiling tiles is a requirement under the SOW – Project Design – Structural – Item 2