167th AW Base-wide Fire Protection Question and Answers.pdf

PDF 3 MB Posted

Attached to
Inspection of Fire Protection Systems Federal contract opportunity
Solicitation number
W50S8V-24-Q-A010
Issued by
Department of the Army National Guard

About this file

This document includes questions and answers related to a federal contract solicitation for Inspection of Fire Protection Systems at a military base. The key details are:

The solicitation is for a contract to provide inspection, testing, and maintenance (ITM) services for the fire protection systems across the 167th Airlift Wing base in Martinsburg, West Virginia. The contract will include annual inspections, with options for 2-year and 5-year ITM. The services will be performed by qualified technicians and engineers, and must comply with UFC 3-600-01 and UFC 3-301-02 requirements. The contract does not include painting of fire hydrants or inspection/testing of any deactivated high-expansion foam systems. Bidders are provided a base hydrant map, but the full list of buildings/systems requiring inspection is not included. The solicitation is set aside for small businesses under NAICS code 541990, with a $19.5M size standard.

View the file

Other files for this federal contract opportunity

Other files attached to Inspection of Fire Protection Systems, newest first.
File Type Posted
Hydrant map-Jun 2018.pdf PDF
NEW VISTOR AND CONTRACTOR BACKGROUND FORM APRIL 2023 - Copy.docx DOCX document
PWS - Inspect Fire Protection Basewide.pdf PDF
Solicitation - W50S8V24QA010.pdf PDF
SCA 2015-4297.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base-Wide Fire Protec�on Systems Inspec�ons Ques�on and

Answers

Atachments:

• Ques�ons and Answers

• Base Hydrant Map

POC: SMSgt. Christopher Broschart, 304-616-5231, christopher.broschart@us.af.mil mailto:christopher.broschart@us.af.mil

Questions & Answers for Project No:

PJVY 240536

Inspect Fire Protection Systems Base Wide 19 April 2024

Questions:

1. Section 1.2 of the SOW requires the inspection of Egress Marking Systems and Fire and Smoke Barrier Opening Protection. Please confirm that these inspections will be the responsibility of the Qualified Fire Protection Engineer (QFPE) as defined by UFC 3-600-01.

a. Yes, it is the Contractors responsibility to inspect and test Egress Marking Systems and Fire/Smoke Barrier Opening Protection devices IAW UFC.

2. Please confirm that there are no dry-chemical or clean-agent fire suppression systems on the base.

a. There are no dry chemical or clean agent suppressions systems on the installation.

3. Please confirm that these inspections are required to be performed by Qualified Personnel as defined by UFC 3-301-02 section 1-10.2 and will include NICET certified technicians, technicians endorsed by equipment manufacturers, and professional fire protection engineers holding a license from any state.

a. Per UFC 3-301-02 section 1-10.2.3.1 contractors must have one qualified technician who possesses the qualifications listed in section 1-10-2.1 to include “Technicians holding a valid, current qualification or license from any state(or local jurisdiction if delegated authority by the state). Local jurisdictions and other organizations may require varying levels of continuing education to maintain recognized journeyman or technician-level qualifications.”

4. Please confirm that the services of professional cost estimators will not be required for the estimation of needed repairs or modifications.

a. Professional cost estimator is not required, technician is qualified to perform cost estimating for the government.

5. Please confirm that as-built drawings of the fire detection, alarm, and suppression systems will be made available to the contract awardee.

a. Yes. All requests for As-Builts should be made to the 167th Cartographer, Mr. Troy Lozinksi via email at Troy.Lozinski@us.af.mil

6. Please confirm that the bid should not include testing of the High Expansion Foam systems, and their associated detection and releasing systems, in Buildings 305, 306, and 308 as these systems have been taken out of service.

a. Correct. Quotes should NOT include pricing for Inspection, Testing, or Maintenance of the High Expansion Foam in Bldg 305, 306, 308.

7. Please confirm that the services under this contract should include recommendations on the replacement of systems that are no longer supported by their manufacturers.

a. Correct, Contractor is to provide recommendations in the final inspection report to the Government if the current devices installed are no longer supported by the manufacturer.

8. Please confirm that the services under this contract should include reporting on building code and life safety compliance where it is noticed incidental to the inspections and testing.

a. Correct, the inspection report should include any building code deficiencies that are non-compliant with UFC or NFPA regulations.

9. Is a copy of the previous 2023 ITM report available for review to confirm the magnitude of the testing requirements? If so, will a PDF be made available for review?

a. There was no ITM contract in place for FY23 – The base bid for this contract will include inspection year 1 ITM IAW the UFC.

10. Section 2.1.4 of the SOW states that Base Bid includes the Annual Inspection and 1 year ITM, Option 1 is the Annual Inspection and 2 year ITM in the second year, and so forth. Please confirm that the 5-year ITM, including sensitivity testing of all smoke detectors and internal inspection of backflow preventers and alarm valves, was performed in 2023 so that this schedule remains appropriate.

a. This Contract will start with ITM year one inspections IAW UFC.

11. Please confirm that radiant energy-sensing detectors (IRRR detectors) associated with the out-of-service foam systems do not need to be tested as they should be removed in accordance with UFC 3-601-02 Section 2-1.2.

a. Although the HEF systems have been deactivated IAW with DOD policy, the IRRR detectors are still a means of fire detection and should be tested to ensure proper alignment for coverage, operation, and notification of bldg fire system.

12. Please confirm that painting of hydrants is not included in this scope of work.

a. This contract only includes performing flow tests and minor maintenance, i.e. seal replacements. No painting of fire hydrants is required.

13. Please confirm that there are no clean agent or dry chemical fire suppression systems on the base.

a. There are no dry chemical or clean agent systems on the installation.

14. Please confirm that there are no smoke control systems on the base.

a. There are no smoke control systems on base.

15. Regarding the attachment "PWS - Inspect Fire Protection Basewide," section 2.1.5.1 specifies that pricing should include inspection and testing for 20% of low- and high-pressure fire hydrants per option year, referencing an attached Hydrant Map. However, we couldn't find any details about the map in the solicitation or other attachments.

a. See attached.

16. Furthermore, section 2.1.6 states that ITM services shall be conducted in accordance with Attached Appendix A, but we couldn't locate Appendix A in the solicitation or on the SAM.gov listing. Additionally, it would be helpful if the government could provide more details on the specific units requiring this inspection.

a. Appendix A is actually Attachment A beginning on page 8 of the PWS.

04 06

E3

400' 600'

TAXIWAY ALPHA

1/

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

1161977680N Highlight

Base-wide fire inspections cover page.pdf