Pre-Quote RFI B408 Conditioned Space 23MAR2023.pdf
PDF 84 KB Posted
- Attached to
- 138 FW Building 408 Conditioned Space Federal contract opportunity
- Solicitation number
- W50S8U-23-Q-0003
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Quote RFI B408 Conditioned Space 11APR2023.pdf | ||
| Site Visit Slides B408 Conditioned Space.pptx | PPTX presentation | |
| Site Visit Attendace Sheet_Redacted.pdf | ||
| B408 Conditioned Space SOW V2.pdf | ||
| 23-Q-0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: RFI No. RFI QUESTION GOVERNMENT RESPONSE
3/16/2023 1 Does section 1.3.1.1 (unescorted access) apply to all subcontract employees for the project?
Yes
3/16/2023 2 Will a site superintendent with a DBIDS badge (1.3.2) be able to escort all subcontract employees in lieu of all subs receiving a Triple I?
One person with a DBIDS badge is allowed to escort 5 people and up to 2 vehicles.
3/16/2023 3 If awarded contract, how will our subs and us receive the AT Level 1 training? Will it be an online course, or will the base provide a day of training for us?
They can go to the following website:
https://jko.jten.mil/courses/AT-level1/launch.html
3/21/2023 4 What is the footage for the conduit and cable run to the transformer that is not placed yet?
Use 30ft for bidding purposes
3/21/2023 5 Are we to reuse the existing exhaust fan after removal? Yes
3/21/2023 6 What is the desired location for the new Unit(s) The east side of the building is where we would like them placed.
3/21/2023 7 will sheetrock stop at flange of structural steel or continue to the outside skin of the building sheetrock will continue to the insulation/outside skin. Metal studs must be anchored to the steel to support the sheetrock.
3/21/2023 8 Are we to tie into the existing sidewalk? Yes, use doweling instructions similar to tying into the building.
3/21/2023 9 How are we to terminate the downspouts on the south side of the building?
install Flumes with grates in the sidewalk. See Sidewalk Flume details.
3/21/2023 10 Will there need to be duct detectors on the HVAC unit(s)? Yes, the unit(s) shall have duct detectors on them.
3/21/2023 11 Do you want a parts and labor warranty for the package unit(s).
Yes, provide a 5 year parts and labor warranty from the date of shipment.
3/21/2023 12 Do you want to unsulate the underside of the new ridge cap?
Yes
Pre-Quote RFI Log for B408 Conditioned Space
Sheet1