Pre-Quote RFI B408 Conditioned Space 23MAR2023.pdf

PDF 84 KB Posted

Attached to
138 FW Building 408 Conditioned Space Federal contract opportunity
Solicitation number
W50S8U-23-Q-0003
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to 138 FW Building 408 Conditioned Space, newest first.
File Type Posted
Pre-Quote RFI B408 Conditioned Space 11APR2023.pdf PDF
Site Visit Slides B408 Conditioned Space.pptx PPTX presentation
Site Visit Attendace Sheet_Redacted.pdf PDF
B408 Conditioned Space SOW V2.pdf PDF
23-Q-0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: RFI No. RFI QUESTION GOVERNMENT RESPONSE

3/16/2023 1 Does section 1.3.1.1 (unescorted access) apply to all subcontract employees for the project?

Yes

3/16/2023 2 Will a site superintendent with a DBIDS badge (1.3.2) be able to escort all subcontract employees in lieu of all subs receiving a Triple I?

One person with a DBIDS badge is allowed to escort 5 people and up to 2 vehicles.

3/16/2023 3 If awarded contract, how will our subs and us receive the AT Level 1 training? Will it be an online course, or will the base provide a day of training for us?

They can go to the following website:

https://jko.jten.mil/courses/AT-level1/launch.html

3/21/2023 4 What is the footage for the conduit and cable run to the transformer that is not placed yet?

Use 30ft for bidding purposes

3/21/2023 5 Are we to reuse the existing exhaust fan after removal? Yes

3/21/2023 6 What is the desired location for the new Unit(s) The east side of the building is where we would like them placed.

3/21/2023 7 will sheetrock stop at flange of structural steel or continue to the outside skin of the building sheetrock will continue to the insulation/outside skin. Metal studs must be anchored to the steel to support the sheetrock.

3/21/2023 8 Are we to tie into the existing sidewalk? Yes, use doweling instructions similar to tying into the building.

3/21/2023 9 How are we to terminate the downspouts on the south side of the building?

install Flumes with grates in the sidewalk. See Sidewalk Flume details.

3/21/2023 10 Will there need to be duct detectors on the HVAC unit(s)? Yes, the unit(s) shall have duct detectors on them.

3/21/2023 11 Do you want a parts and labor warranty for the package unit(s).

Yes, provide a 5 year parts and labor warranty from the date of shipment.

3/21/2023 12 Do you want to unsulate the underside of the new ridge cap?

Yes

Pre-Quote RFI Log for B408 Conditioned Space

Sheet1