Pre-Bid RFI Responses.pdf

PDF 385 KB Posted

Attached to
137th SOW - COMM ROOM HVAC OBASE Federal contract opportunity
Solicitation number
W50S8T24B0001
Issued by
Department of the Army National Guard

About this file

This document contains pre-bid responses to a Request for Information (RFI) for a federal contract opportunity. The contract opportunity is a solicitation (W50S8T24B0001) for a renovation project to install or upgrade mini-split cooling systems in communication rooms at various buildings on a military base. The key details are:

The project requires 120/208V electrical service and provides guidance on condensate line routing and the order of unit installation, with priority on building 1047. The government allows the contractor to de-energize electrical panels as needed to perform the work. The contract is a 100% small business set-aside with a NAICS code of 236220 and a magnitude between $25,000 and $100,000. Any questions should be directed to the specified government points of contact.

View the file

Other files for this federal contract opportunity

Other files attached to 137th SOW - COMM ROOM HVAC OBASE, newest first.
File Type Posted
W50S8T24B0001 - Solicitation.pdf PDF
Comm HVAC Site Visit Slides 17 April 2024.pptx PPTX presentation
W50S8T24B0001 - Solicitation.pdf PDF
YZEU232002 Comm Room AC Obase Drawings.pdf PDF
232002 Comm Room AC OBASE SOW.pdf PDF
WD OK20240049 Building.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid RFI Responses

1. Voltage of the split units- the SOW calls out the panel and breakers that the power is to be pulled from. All the panels that are to be pulled from are 120/208v.

2. In 1047 there is a mop sink in the room next to the electric/com room. Can we run the condensate line to the mop instead? Gov response- yes this is acceptable.

3. Is there an order in which to install the split units in the buildings? Gov response- the Com unit on base would like 1047 to be the first priority then a er that it is up to the contractor.

4. Our policy is to not work any electrical equipment “hot” and to de-energize a panel when we have to put a new breaker in. Will you allow the panels to be turned off and if so, what is the meframe or me of day that they would want this to happen? Gov response- Yes we will allow this and coordina on will be done closer to when that work happens.

File details come from the government source that posted it. Updated .