Sheet1 Pre-Bid RFI Log for W50S8T-21-B-0003 21-2004 Sustain Roofs Basewide

Date:RFI No.RFP Reference (Sect/Para/Page)QUESTIONGOVERNMENT RESPONSE
3/29/211SOWAre the manufacturers listed in the spec, are the roofers required to be

certified in for that product?

- We are certified in a few, Berridge being one of the big ones, but not John Manville. Does this mean we would not qualify to bid on this project?

The manufacturers are listed in the table at the beginning of the SOW.

It is not a requirement from the gov't to be certified for every manufacturer, so long as the warranty will not be voided by performing the repairs, and the repairs are done in accordance with the specs and references in the SOW. This applies to most repairs in the SOW.

There are several repairs in the SOW that will require coordination with the warranty holder, and the warranty holder may require the company to be certified in certain manufacturer repairs. It shall be the responsibility of the general contractor to coordinate with the warranty holder, and secure the appropriate vendor to perform the repairs and/or modifications. The repairs this will possibly apply to include modifications or major repairs to the roof. Anything that would penetrate the roof could possibly void the warranty and will need to be coordinated with the warranty holder unless otherwise directed by the government.

Base Bid

- 1001 Rain Diverter install.

- 1007 railing installation -possibly if penetrations to roof are needed

- 1011 railiing installation- possibly if penetrations to roof are needed

- 1035 railiing installation- possibly if penetrations to roof are needed Option 1

- 1011 Roof anchors Option 2

- 1020 Roof panel replacement Option 4 -1052 Metal wall panel replacement Option 5 -1052 Roof ladder install- possibly if penetration to roof are needed

3/29/21 2 RFP Can we bid on certain buildings or is the bid price a lump sum for all work to be completed?

Bid is inclusive of all buildings as a single job for work to be completed.

4/14/213As-BuiltsAre structural as-built drawings available for Building 1052?Any/all as-built drawings can be provided by the Government. Drawings will be placed on a disc and can be received by the requester, in person, at the Engineering office, Civil Engineer Squadron, WRANGB.
4/20/214SOWB1052 CLIN 0006 is being removed due to a lack of infrastructure to support the installation of ladders.After looking into it a little farther, we fill like the scope of work and drawings do not provide enough detail and description for the contractors to be able to give us a good price for this work. CLIN 0006 therefore is being removed.