This document is a Request for Information (RFI) Questions & Answers clarification for Solicitation Number W50S8S26QA013 concerning the B118 Fire Panel project. The RFI addresses contractor responsibilities and scope clarifications for a fire alarm system replacement project.
Key clarifications include: ceiling tile maintenance is required for integrity, but drywall touchup and painting are excluded from contractor scope; contractors must install impairment/out-of-service signs and tags per UFC3-601-02 standards rather than provide continuous fire watch; the new system must be a voice system with capability to communicate to base D21 central station per UFC 4-021-01; monitoring modules for sprinkler system supervision are included in scope, specifically tamper switches, flow switches, and Pressure Independent Valves (PIVs), with potential conductor replacement for PIVs; and all waste disposal, including packaging and approximately 150 fire alarm devices plus the existing FA panel, communicator, and booster panel, must be disposed of off-site by the contractor rather than using facility dumpsters. This RFI serves to clarify ambiguities in the Performance Work Statement (PWS) regarding contractor responsibilities during system demolition and installation phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: W50S8S26QA013
Project: B118 Fire Panel
Document: Request for Information (RFI) Questions & Answers
Q1: The footprint of some existing fire alarm devices may be larger than the new devices, This could lead to a situation requiring the replacement of ceiling tiles, drywall touchup and painting. What are the contractor's responsibilities in this scenario?
A1: Contractor is only required to make sure all ceiling tiles are maintained for integrity. No drywall or paint is required.
Q2: Please confirm whether the contractor is responsible for providing fire watch after the existing system is demolished, but before the new system is completely installed.
A2: Contractor shall install signs/tags per the following: UFC3-601-02 1-13 / 1-12 “System impairment or out of service tagging and warning.”
Q3: Please confirm whether the existing system is a voice system and whether the new system is required to be a voice system.
A3: UFC 4-021-01 9 April 2008 Change 1, January 2010 / Contractor shall import a new system to communicate to base D21 central station also.
Q4: The FA devices listed in the PWS did not include monitor modules for supervising the sprinkler system. There is at least 1 tamper, 1 flow switch and a PIV. The sprinkler system is supervised by the FA system. Please confirm this shall be included in the contractor's scope.
A4: Yes, Tamper / Flow switch and PIV shall require monitoring. PIV may need conductor replaced.
Q5: This project will create minimal waste, which includes Packaging, 1 FA panel, 1 FA communicator, 1
Booster Panl, & approximately 150 FA devices. Shall the contractor include a dumpster for disposal of this equipment or will they be permitted to use the facilities’ dumpster?
A5: Contractor dispose off site.