W50S8S22B0001 A01 Final.pdf
PDF 393 KB Posted
- Attached to
- Construct Vehicle Service Rack Federal contract opportunity
- Solicitation number
- W50S8S22B0001
- Issued by
- Department of the Army National Guard
About this file
This document contains an amendment to a solicitation and related federal contract opportunity notice. The amendment decreases the offer acceptance period from 120 to 60 days and increases the contractor period of performance end date from 270 to 365 days. The notice seeks bids to construct a 2,300 square foot vehicle service rack at the 180th FW Contracting Office at Toledo Air National Guard Base in Ohio. Interested small businesses are encouraged to respond. The total contract value is estimated between $500,000 to $1,000,000, and the North American Industry Classification code is 236220 with a size standard of $39.5 million average annual revenue. The pre-bid conference is scheduled for December 22, 2021 and bids are due January 18, 2022. Funds are anticipated to become available by January 30, 2022. The award will be fixed-price and made to the responsible bidder offering the lowest price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Refueler_Abstract of OffersR1 Signed.xlsx | XLSX spreadsheet | |
| W50S8S22B0001 0003 Amendment.pdf | ||
| Vehicle Service Rack - Soils Report.pdf | ||
| W50S8S22B0001 0002 Amendment.pdf | ||
| 180th FW Base Map Partial sanitary layout.pdf | ||
| Pre-Bid Site Visit Agenda Sign-In.pdf | ||
| WD OH20210088 MOD 07 12-17-2021.pdf | ||
| RFI_template.doc | DOC document | |
| W50S8S22B0001 Final.pdf | ||
| Drawings VSR B3.pdf | ||
| Specifications VSR B-3 Combined.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to attach Pre-Bid Site Visit Agenda, RFI Form, and sketch added to identifying sanitary layout for this project.
Changes to the Period of Performance after issuance of NTP is from 270 to 365 calendar days, and bids are valid from 120 to 60 calendar days. Current Wage Determinations is added to amendment.
A second site visit is scheduled January 4, 2022 at 1:00 PM local time. The location is the same as pervious Toledo ANG base, Bldg. 150, classroom, 2660 South Eber Rd., Sw anton OH 43558. Please register for this second site visit at email 180.FW.Constracting@us.af.mil .
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8S22B0001
X 9B. DATED (SEE ITEM 11)
14-Dec-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Dec-2021
CODE
USPFO OH 180 MISSION SUPPORT CONTRACTING
2660 S EBER RD
SWANTON OH 43558-8752
W50S8S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8S22B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The offeror acceptance period has decreased by 60 from 120 to 60.
The contractor period of performance end date has increased by 95 days from 270 days to 365 days.
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
WDOL
"General Decision Number: OH20210088 12/17/2021
Superseded General Decision Number: OH20200088
State: Ohio
Construction Type: Building
County: Lucas County in Ohio.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/15/2021 2 02/26/2021 3 05/21/2021 4 09/24/2021 5 10/29/2021 6 12/03/2021 7 12/17/2021
ASBE0045-004 07/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 33.34 16.82
BROH0003-006 07/01/2021
Rates Fringes
BRICKLAYER.......................$ 32.00 18.04
TERRAZZO WORKER/SETTER...........$ 31.17 16.00
TILE FINISHER....................$ 26.80 10.38
TILE SETTER......................$ 31.17 16.00
CARP0248-010 05/01/2014
Rates Fringes
CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 28.22 17.77
CARP0351-002 05/01/2016
Rates Fringes
CARPENTER (Excluding Drywall Hanging and Metal Stud Installation)....................$ 28.63 19.51
ELEC0008-015 05/24/2021
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 43.33 26.61
ELEC0008-016 08/23/2021
Rates Fringes
ELECTRICIAN: CABLE PULLER
(Voice/Data/Video)...............$ 11.67 4.5%
ELEC0008-017 08/23/2021
Rates Fringes
ELECTRICIAN (Low Voltage Wiring Only).....................$ 27.81 4.5%+16.23
ENGI0018-048 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
Backhoe/Excavator/Trackhoe;
Crane.......................$ 36.64 15.09
ENGI0066-045 06/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
Forklift....................$ 28.87 19.66 Grader/Blade................$ 32.42 19.66 Mechanic....................$ 32.92 19.66
IRON0044-020 06/01/2021
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 31.32 21.00
IRON0055-012 07/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL
(Including Metal Building Structural Frame Installation)...$ 31.25 26.90
* LABO0500-005 07/14/2021
Rates Fringes
LABORER
Common or General; Mason Tender - Cement/Concrete....$ 28.98 14.65
PAIN0007-004 07/01/2019
Rates Fringes
PAINTER
Brush and Roller............$ 26.39 17.79 Fireproofer.................$ 27.39 17.79 Spray.......................$ 27.39 17.79
PAIN0948-002 09/01/2020
Rates Fringes
GLAZIER..........................$ 28.40 17.54
PLAS0526-017 06/01/2018
Rates Fringes
PLASTERER........................$ 27.45 15.56
PLAS0886-002 07/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.08 20.95
PLAS0886-008 07/01/2018
Rates Fringes
PAINTER: Drywall Finishing/Taping Only............$ 29.08 20.95
* PLUM0050-013 10/04/2021
Rates Fringes
PIPEFITTER (Includes HVAC Pipe Installation)...............$ 44.04 27.72 PLUMBER (Excludes HVAC Pipe Installation)....................$ 44.04 27.72
ROOF0134-006 07/01/2019
Rates Fringes
ROOFER...........................$ 28.02 20.04
SFOH0669-009 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 39.25 25.81
SHEE0033-048 07/01/2019
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 33.82 30.19
* UAVG-OH-0021 01/01/2019
Rates Fringes
OPERATOR: Oiler.................$ 27.56 16.37
SUOH2012-090 08/29/2014
Rates Fringes
IRONWORKER, REINFORCING..........$ 28.11 17.83
LABORER: Mason Tender - Brick...$ 18.39 11.04
LABORER: Pipelayer..............$ 23.98 8.58
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 30.26 12.58
OPERATOR: Bulldozer.............$ 28.07 11.15
OPERATOR: Loader................$ 29.66 12.61
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.28 13.29
OPERATOR: Roller................$ 28.83 12.72
TRUCK DRIVER: Dump (All Types)...$ 24.32 11.73
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
File details come from the government source that posted it. Updated .