W50S8S22B0001 0003 Amendment.pdf

PDF 445 KB Posted

Attached to
Construct Vehicle Service Rack Federal contract opportunity
Solicitation number
W50S8S22B0001
Issued by
Department of the Army National Guard

About this file

This document provides details for a federal contract opportunity to construct a vehicle service rack at the 180th Fighter Wing in Toledo, Ohio. The project includes building a 2,300 square foot double bay open floor plan facility to wash military vehicles and snow removal equipment. Modifications to existing utilities, pavements, and landscaping are also required. The contract duration is 270 calendar days from notice to proceed. The solicitation is set aside for total small businesses and will be awarded based on price to the responsible bidder offering the most advantageous proposal. Interested offerors must register in SAM and check the website periodically for amendments. The tentative dates for the pre-bid conference, bid opening and award are December 22nd, 2021, January 18th, 2022 and January 30th to February 28th, 2022 respectively. The estimated value is between $500,000 to $1,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Vehicle Service Rack, newest first.
File Type Posted
Refueler_Abstract of OffersR1 Signed.xlsx XLSX spreadsheet
W50S8S22B0001 0002 Amendment.pdf PDF
Vehicle Service Rack - Soils Report.pdf PDF
WD OH20210088 MOD 07 12-17-2021.pdf PDF
RFI_template.doc DOC document
W50S8S22B0001 A01 Final.pdf PDF
180th FW Base Map Partial sanitary layout.pdf PDF
Pre-Bid Site Visit Agenda Sign-In.pdf PDF
W50S8S22B0001 Final.pdf PDF
Drawings VSR B3.pdf PDF
Specifications VSR B-3 Combined.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is add the updated Wage Determination OH20220088 1-14-2022 and respond to Request for Information (RFI) #19 and 20. Bid date has not changed from Amendment 0002.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8S22B0001

X 9B. DATED (SEE ITEM 11)

14-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jan-2022

CODE

USPFO OH 180 MISSION SUPPORT CONTRACTING

2660 S EBER RD

SWANTON OH 43558-8752

W50S8S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8S22B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

RFI RESPONSES

The following have been added by full text:

RFI RESPONES

RFI

19 Question The drawings currently show rigid insulation over the wall girts (2’ OC) with a self-adhering air barrier applied over the foam. Liner panel then shown on the interior of the building. The suppliers we’ve been dealing with are having a difficult time finding an air barrier that can be applied direct to the foam. Is there a basis of design that the architect used for the spec that will work in this application? In the past we have used the Ultra Wall System from Dow / Dupont which certifies that once the joints between the rigid insulation have been sealed it will act as an air barrier and water resistive barrier – No additional air barrier required - but there doesn’t appear to be a direct application for this type of construction. See attached literature on the system.

The heated refueler building used insulated metal wall panels and thermal blocks in the roof to achieve the continuous insulation and may be an alternate to consider.

Response: Wall construction:

The wall panels will be a 3" thick insulated metal panel, 36" wide panel with a minimum R-value of 23. The profile will be equal or similar to the Metl-Span CF Light Mesa profile. Exterior face of the panel shall be 24 ga. and the interior face of the panel shall be 26 Ga. Exterior face of panel shall be embossed. Delete liner panels and paint all exposed steel.

Roof Construction:

ROOF SYSTEM PROFILE #1:

The installed roof system shall have a minimum R-value of 30.

Roof panels: 24 Gauge SSR standing seam roof system with a Kynar finish. Panels shall provide 24" wide net coverage having 3" high major ribs formed at the panel side laps. Side joints shall have a factory applied sealant and shall require mechanical field seaming of the side lap joint after the panel has been positioned on the roof. Special clips shall be used to attach the SSR roof panels to the supporting members and shall be designed to allow 2” of panel movement to compensate for thermal effects. Thermal blocks 1" thick shall be provided over the roof purlins.

A U.L. 90 roof uplift rating is provided.

Roof insulation: Provide 2 layers of fiberglass insulation one faced to serve as moisture/air barrier and one unfaced for a total minimum R-value of 30. Insulation system shall be equal or similar to Varco Pruden's Thermal Lift system.z Warranties are as noted in the specifications.

OR,

ROOF SYSTEM PROFILE #2:

Provide a 4” thick pre-insulated standing seam metal roof system with an R-value of 30. Seam is a minimum of 2” high. Exterior surface is 24 gauge galvanized coated steel with Kynar 500/Hylar5000 coatings. Interior surface is 26 gauge steel with Kynar finish. Provide concealed fastener system. Roofing system shall provide a U.L. 90 uplift rating. Delete liner panels and paint all exposed steel.

Warranties are as noted in the specifications.

20 Question Can you please provide an asphalt typical section for the project which provides the contractor both thicknesses and type of asphalt to be used.

I would guess something like a 4” 301 Asphalt Base topped with 2” of #448 Type 1 Surface with PG 64-22 liquid.

Response: The typical asphalt pavement repair shall be"

1. Compacted subgrade.

2. 8" of ODOT #304s compacted to 98% maximum density.

3. 2" of Type 448 intermediate course

4. 2" of Type 448 surface course.

Proposed binder is acceptable.

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

WDOL

"General Decision Number: OH20220088 01/14/2022

Superseded General Decision Number: OH20210088

State: Ohio

Construction Type: Building

County: Lucas County in Ohio.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/07/2022 1 01/14/2022

ASBE0045-004 07/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 33.34 16.82

BROH0003-006 07/01/2021

Rates Fringes

BRICKLAYER.......................$ 32.00 18.04

TERRAZZO WORKER/SETTER...........$ 31.17 16.00

TILE FINISHER....................$ 26.80 10.38

TILE SETTER......................$ 31.17 16.00

CARP0248-010 05/01/2014

Rates Fringes

CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 28.22 17.77

CARP0351-002 05/01/2016

Rates Fringes

CARPENTER (Excluding Drywall Hanging and Metal Stud Installation)....................$ 28.63 19.51

ELEC0008-015 05/24/2021

Rates Fringes

ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 43.33 26.61

ELEC0008-016 08/23/2021

Rates Fringes

ELECTRICIAN: CABLE PULLER

(Voice/Data/Video)...............$ 11.67 4.5%

ELEC0008-017 08/23/2021

Rates Fringes

ELECTRICIAN (Low Voltage Wiring Only).....................$ 27.81 4.5%+16.23

ENGI0018-048 05/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR

Backhoe/Excavator/Trackhoe;

Crane.......................$ 36.64 15.09

ENGI0066-045 06/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

Forklift....................$ 28.87 19.66 Grader/Blade................$ 32.42 19.66 Mechanic....................$ 32.92 19.66

IRON0044-020 06/01/2021

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 31.32 21.00

IRON0055-012 07/01/2021

Rates Fringes

IRONWORKER, STRUCTURAL

(Including Metal Building Structural Frame Installation)...$ 31.25 26.90

LABO0500-005 07/14/2021

Rates Fringes

LABORER

Common or General; Mason Tender - Cement/Concrete....$ 28.98 14.65

* PAIN0007-004 07/01/2021

PAINTER

Brush and Roller............$ 27.74 18.77 Fireproofer.................$ 28.99 18.77 Spray.......................$ 28.99 18.77

PAIN0948-002 09/01/2020

Rates Fringes

GLAZIER..........................$ 28.40 17.54

PLAS0526-017 06/01/2018

Rates Fringes

PLASTERER........................$ 27.45 15.56

PLAS0886-002 07/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.08 20.95

PLAS0886-008 07/01/2018

Rates Fringes

PAINTER: Drywall Finishing/Taping Only............$ 29.08 20.95

PLUM0050-013 10/04/2021

Rates Fringes

PIPEFITTER (Includes HVAC Pipe Installation)...............$ 44.04 27.72 PLUMBER (Excludes HVAC Pipe Installation)....................$ 44.04 27.72

ROOF0134-006 07/01/2019

Rates Fringes

ROOFER...........................$ 28.02 20.04

SFOH0669-009 04/01/2021

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 39.25 25.81

SHEE0033-048 07/01/2019

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 33.82 30.19

* UAVG-OH-0021 01/01/2019

Rates Fringes

OPERATOR: Oiler.................$ 27.56 16.37

SUOH2012-090 08/29/2014

Rates Fringes

IRONWORKER, REINFORCING..........$ 28.11 17.83

LABORER: Mason Tender - Brick...$ 18.39 11.04

LABORER: Pipelayer..............$ 23.98 8.58

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 30.26 12.58

OPERATOR: Bulldozer.............$ 28.07 11.15

OPERATOR: Loader................$ 29.66 12.61

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.28 13.29

OPERATOR: Roller................$ 28.83 12.72

TRUCK DRIVER: Dump (All Types)...$ 24.32 11.73

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)