2nd Round of Questions and Answers.pdf

PDF 63 KB Posted

Attached to
179th OWS Cleaning and Maintenance Services
Solicitation number
W50S8R-23-R-0004
Issued by

View the file

Other files

File Type Posted
Sign In Sheet.pdf PDF
Questions and Answers.docx DOCX document
OHIO EPA Storm Water Permit Parameters.pdf PDF
Attachment 2 - PWS OWS Rev 1.pdf PDF
Questions and Answers.pdf PDF
Attachment 3 - Richland County WD 15-4735.txt TXT text file
Attachment 1 - Provisions and Clauses.pdf PDF
Attachment 2 -- PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W50S8R-23-R-0004 – 2nd Site Visit Questions and Answers

Question 1. Can equipment be left on base.

Answer 1. Equipment can be left on base after it has passed the initial inspection performed by the main gate. Equipment must be staged out of the way to prevent flow of traffic, does not impede wing or airport operations, etc.

Question 2. How can we access the site daily?

Answer 2. After personnel are cleared by the main gate, they can traverse the Cairns road gate provided the contractors are aware of the following:

- Any new equipment brought to the installation must be inspected by the Main Gate before bringing it through Cairns Rd Gate.

- They are not permitted to bring any new members on the installation that had not been previously vetted and credentialed

- At no time are they permitted to utilize the access road to access the main base

- Their vehicle and equipment are still subject to search when entering Cairns Rd Gate and random credential checks will be conducted by our patrols