Pre-Award RFIs Combined.pdf
PDF 141 KB Posted
- Attached to
- Repair BLDG 107 Heaters Federal contract opportunity
- Solicitation number
- W50S8Q-24-Q-0009
- Issued by
- Department of the Army National Guard
About this file
This document is a pre-award Request for Information (RFI) related to a federal contract opportunity to repair the heaters in Building 107 at the Springfield Air National Guard Base in Ohio.
The key details are:
- The existing gas delivery and building pressure information, including the meter and regulator specifications.
- The phasing plan to keep at least one vehicle lift open during the project.
- The existing oil burner will remain in place.
- There is no current warranty on the existing roof.
- The combustion air intake hoods can be left on the exterior walls.
- The contractor and government will identify any equipment that needs to be salvaged prior to demolition.
- The dimensions of the various rooms in the building are provided. The federal contract opportunity is for a firm-fixed price contract to provide services to repair the gas-fired heaters and add additional units in the end bays of Building 107. The project is set aside for small businesses, with a NAICS code of 236220 and an estimated contract value between $100,000 and $250,000. The contract duration is 270 calendar days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S8Q24Q0009-0001 Bldg 107 Heaters.pdf | ||
| W50S8Q24Q0009 conformed copy Bldg 107 Heaters.pdf | ||
| W50S8Q24Q0009.pdf | ||
| Attachment 2 - Drawing 1 WAAR232013.pdf | ||
| Attachment 5 - RFI Template.docx | DOCX document | |
| Attachment 6 - Base Entry Request.pdf | ||
| Attachment 3 - Springfield Base Facility Standards - FINAL - Jul 2021.pdf | ||
| Attachment 4 - Material Submittals WAAR232013.xlsx | XLSX spreadsheet | |
| Attachment 1 - SOW WAAR232013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. What is the existing natural gas delivery and working building pressure at the main entering the building?
a. Coming into the regulator/meter is 2” iron pipe.
b. Meter Specs:
i. Manufacturer: Roots Meter
ii. Model #: 15C175
iii. CFH Max: 1500
iv. m3/h Max: 42.5
v. PSIG: 175
vi. kPa: 1200
c. Regulator Specs:
i. Manufacturer: Lancaster
ii. Model: 61
iii. 3/16 OR
iv. 2-60 PSIG
v. 7”WC Outlet
2. What is the Phasing plan of this project?
a. Attempt to keep one vehicle lift open at all times, but can be flexible with all spaces for short durations (1-2 days) if necessary.
3. Does the existing Oil burner in the bay at heater 3 location get demolished?
a. No, the existing oil burner remains in place.
4. It is assumed there is a warranty remaining on the existing roof. What is the preferred roofing contractor for the base and / that carry the warranties for this roof?
a. There is no current warranty on existing roof.
5. The combustion air intakes for existing radiant tube heater penetrate the side walls, is it acceptable to leave the intake hood on the exterior of the wall and patch the holes from inside to not leave a poor looking exterior patched area?
a. Yes, this is an acceptable method and preferred by base engineering.
6. Does CE maintenance shop want to salvage any existing parts from the items to be demolished?
a. Contractor and COR/Base Engineering will conduct a walk through prior to demolition start to identify any salvage items to remain with CE.
7. Can you provide the model number of the current heaters? As we did not have a means to get access up to them at site visit?
a. CoRayVac, Model: CRV6-6
8. Do you have dimensions of the rooms?
a. Please see attached room dimensions below:
i. Room 112: 13’-2” x 34’
ii. Rooms 113, 114, 115, 116: 14’ x 34’
iii. Room 117: 15’ x 34’
iv. Room 118: 18’ x 34’
v. Room 120: 19’-9” x 47’-7”
vi. Refueler Bay: 18’ x 47’-7”
File details come from the government source that posted it. Updated .