Attachment 4 - Material Submittals WAAR232013.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Repair BLDG 107 Heaters Federal contract opportunity
- Solicitation number
- W50S8Q-24-Q-0009
- Issued by
- Department of the Army National Guard
About this file
This document is an Attachment 4 - Material Submittals for the federal contract opportunity to Install Gas Fired Bay Heaters in Building 107. The contract solicitation number is W50S8Q-24-Q-0009.
The key details are:
- This is a firm fixed-price contract for services to repair the gas-fired heaters and add additional units in the end bays of Building 107 at the Springfield Air National Guard Base.
- The project consists of providing all labor, materials, and equipment necessary for the construction work, with a contract duration of 270 calendar days after notice to proceed.
- The contract is set aside 100% for Small Businesses under NAICS code 236220, with a magnitude of construction between $100,000 and $250,000.
- The required material submittals include progress schedule, safety plan, product data, shop drawings, samples, and other documentation. Submittal due dates and approval/disapproval process are specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Award RFIs Combined.pdf | ||
| W50S8Q24Q0009-0001 Bldg 107 Heaters.pdf | ||
| W50S8Q24Q0009 conformed copy Bldg 107 Heaters.pdf | ||
| W50S8Q24Q0009.pdf | ||
| Attachment 2 - Drawing 1 WAAR232013.pdf | ||
| Attachment 5 - RFI Template.docx | DOCX document | |
| Attachment 6 - Base Entry Request.pdf | ||
| Attachment 3 - Springfield Base Facility Standards - FINAL - Jul 2021.pdf | ||
| Attachment 1 - SOW WAAR232013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3000
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| ( Form 66 Modified) | SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| WAAR232013 | Install Gas Fired Bay Heaters Bldg 107 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | MSD SHEET | OPERATING INSTRUCTIONS | Other |
SUBMITTAL
REQUIRED DATES DUE
BY__10__
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||||
| APPROVAL | REMARKS | |||||||||
| APPROVED | DISAPPROVED | |||||||||
| 1 | Progress Schedule | |||||||||
| (AF Form 3064) | 1 | |||||||||
| 2 | Progress Reports | |||||||||
| (OANG Form 3065) | 1 | |||||||||
| 3 | Existing Condition Photos | |||||||||
| (Prior to Beginning Work) | 1 | |||||||||
| 5 | Site Safety Plan | 1 | ||||||||
| 6 | Gas Fired Heaters | 1 | 1 | |||||||
| 7 | Piping | 1 | ||||||||
| 9 | Fittings and adheasives | 1 | ||||||||
| 11 | Electrical Materials | 1 | ||||||||
| 12 | Ducting | 1 | ||||||||
| 13 | Allthread/Strut Channel | 1 | ||||||||
| 14 | Pipe Hangers | 1 | ||||||||
| 15 | Piping/Exhaust plan | 1 | ||||||||
| 16 | Red Line/Shop Drawings of Finished Utilities (including gas line and exhaust ducting) | 1 | ||||||||
| 17 | ||||||||||
| 18 |