Q and A 146 Breakroom Cleanout.pdf
PDF 127 KB Posted
- Attached to
- Breakroom Plumbing Repair Federal contract opportunity
- Solicitation number
- W50S8Q-21-B-0004
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Openign Sign in W50S8Q-21-B-0004.pdf | ||
| Abstract of Offers W50S8Q-21-B-0004.pdf | ||
| Pics 146 Breakroom.pptx | PPTX presentation | |
| As-Build 1 Squad Ops Plumbing Water.pdf | ||
| As-Build 2 Squad Ops plumbing sanitary.pdf | ||
| Sign-In Building 146 Breakroom Site Walk.pdf | ||
| As-Build 3 Squad Ops Power floor plan.pdf | ||
| RFI Format.doc | DOC document | |
| Amendment 02 W50S8Q-21-B-0004.pdf | ||
| Amendment 01 W50S8Q-21-B-0004.pdf | ||
| W50S8Q-21-B-0004 Drawing 1.pdf | ||
| W50S8Q-21-B-0004.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI ? # Question Answer
Under Section 6 of the Solicitation Document, it indicates that there are multiple attachments for this project. However, only one attachment (Drawing #1) is available on sam.gov. When will the other attachments be available?
Attachments 6.2 - 6.8 will be provided to the winning contractor, post award as all of these forms are for administrative purposes post award.
Please Confirm--Blue line on drawing shows area of new tile to be along the front of coolers, metal and wood cabinetry. Existing tile under coolers and cabinets are to remain thus coolers and metal cabinets are not to be removed and reinstalled.
Metal cabinet(s) and coolers will be removed by the government prior to NTP issuance, All VPI flooring willl need replaced (425SF) the blue line is a general area and not exact.
Please provide above / below grade plumbing as build drawings for reference to provide an accurate number for floor clean out installation Attachements include.
Please clarify that the new clean out is to be located in the middle of the floor instead of the wall inside the cabinet and that the cover if to be installed in the floor shall be a raised stainless cover plate instead of a cast iron body with nickel bronze clean out top to be set flush with floor. The stainless cover plate will protrude above finished floor line
SOW indicted the cleanout to be in the middle of the floor.
Clean out is to be flush with floor with no protrusion. Install cast iron body with nickle bronze clean out top.
Would it be possible to obtain photos of the area along with and dimensional drawing I can do a take-off for the flooring. Also, are there spec's for the type and size of cabinet that is to be replaced?
Pictures provided in PowerPoint. In section 3.3.7 of SOW floor dimensions are given. In section 3.3.5 of SOW, and 3.3.6 cabinetry type and amount is given. All VPI flooring willl need replaced.