Q and A 146 Breakroom Cleanout.pdf

PDF 127 KB Posted

Attached to
Breakroom Plumbing Repair Federal contract opportunity
Solicitation number
W50S8Q-21-B-0004
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Breakroom Plumbing Repair, newest first.
File Type Posted
Bid Openign Sign in W50S8Q-21-B-0004.pdf PDF
Abstract of Offers W50S8Q-21-B-0004.pdf PDF
Pics 146 Breakroom.pptx PPTX presentation
As-Build 1 Squad Ops Plumbing Water.pdf PDF
As-Build 2 Squad Ops plumbing sanitary.pdf PDF
Sign-In Building 146 Breakroom Site Walk.pdf PDF
As-Build 3 Squad Ops Power floor plan.pdf PDF
RFI Format.doc DOC document
Amendment 02 W50S8Q-21-B-0004.pdf PDF
Amendment 01 W50S8Q-21-B-0004.pdf PDF
W50S8Q-21-B-0004 Drawing 1.pdf PDF
W50S8Q-21-B-0004.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI ? # Question Answer

Under Section 6 of the Solicitation Document, it indicates that there are multiple attachments for this project. However, only one attachment (Drawing #1) is available on sam.gov. When will the other attachments be available?

Attachments 6.2 - 6.8 will be provided to the winning contractor, post award as all of these forms are for administrative purposes post award.

Please Confirm--Blue line on drawing shows area of new tile to be along the front of coolers, metal and wood cabinetry. Existing tile under coolers and cabinets are to remain thus coolers and metal cabinets are not to be removed and reinstalled.

Metal cabinet(s) and coolers will be removed by the government prior to NTP issuance, All VPI flooring willl need replaced (425SF) the blue line is a general area and not exact.

Please provide above / below grade plumbing as build drawings for reference to provide an accurate number for floor clean out installation Attachements include.

Please clarify that the new clean out is to be located in the middle of the floor instead of the wall inside the cabinet and that the cover if to be installed in the floor shall be a raised stainless cover plate instead of a cast iron body with nickel bronze clean out top to be set flush with floor. The stainless cover plate will protrude above finished floor line

SOW indicted the cleanout to be in the middle of the floor.

Clean out is to be flush with floor with no protrusion. Install cast iron body with nickle bronze clean out top.

Would it be possible to obtain photos of the area along with and dimensional drawing I can do a take-off for the flooring. Also, are there spec's for the type and size of cabinet that is to be replaced?

Pictures provided in PowerPoint. In section 3.3.7 of SOW floor dimensions are given. In section 3.3.5 of SOW, and 3.3.6 cabinetry type and amount is given. All VPI flooring willl need replaced.