RFI Responses 08.11.2023_W50S8P23B0003.pdf
PDF 154 KB Posted
- Attached to
- OH ANG Rickenbacker Outbound Gate Repair
- Solicitation number
- W50S8P-23-B-0003
- Issued by
-
Department of the Army National Guard
About this file
This document contains responses to a request for information regarding solicitation number W50S8P-23-B-0003 for repairs to the outbound gate at Rickenbacker Air National Guard Base. The contractor is responsible for providing and installing three and a half inch galvanized steel posts in two locations and installing a pull string for future wire installation. The base will provide and install warning signage and mount spike strips to a new concrete foundation to be constructed by the contractor. The information clarifies requirements for the solicitation and does not constitute a contract amendment. The contracting officer provided the responses on August 22, 2023, with all interested parties copied.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Interested Party Contractor
Date:
8/11/2023
To:
James Andrews
1. Solicitation/Contract Number:
W50S8P23B0003
2. Location of Project:
Rickenbacker ANGB
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
1. Are we to provide the 3.5” galvanized steel post for the lighted warning signs?
2. Are we to provide the warning signs?
3. Is the spike trap removable? Does it just set on top of the new concrete pavement or does it require embedment in the new concrete?
Attachments: Date Response Required:
By: Title:
Requestor's FAX Number: Requestor's Telephone Number:
4.
To: Date:
CE Responses –
1. See Drawing C-102, Note 1 – contractor to provide & install posts in two (2) Locations as shown and install pull string for wire install as a latter date.
2. Base to provide signage installed by the base.
3. Spike Strips will be mounted to new concrete foundation by Base. Contractor only responsible for new foundation.
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
CE Representative: Date:
Contracting Officer: Date:
Adam L. Winbrenner 8/22/2023
8/22/2023James R. Andrews
All Interested Parties 22-Aug-2023