109AW - B2A Ductwork Shop Drawings.pdf
PDF 1 MB Posted
- Attached to
- 109AW - Repair Hot Water Pipe Bldg. 2A
- Solicitation number
- W50S8J-24-Q-0002
About this file
This document package includes ductwork shop drawings and a related federal contract opportunity solicitation. The shop drawings depict the duct layout and components for renovations to Operations Building 2A at Stratton Air National Guard Base. They include duct sizes, locations, and specifications for various air handling units and terminal boxes throughout different areas of the building.
The solicitation seeks firms to provide all labor, equipment, and supervision to repair hot water pipes in Building 2A, as outlined in the attached statement of work. A firm-fixed price contract will be awarded subject to the Davis Bacon Act. The submission requirements and evaluation criteria are contained in Sections L and M of the solicitation. A mandatory site visit will be held on March 13, 2024 at 9:30 AM EST. The solicitation is issued by the Department of the Army New York Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Attendance Sheet.pdf | ||
| Solicitation - W50S8J-24-Q-0002.pdf | ||
| 109 AW - SOW Repair Hot Water Pipe B2A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: 101418 Stratton ANGB | Renovate Operations Building 2A Date:
Contract No.:
From: To:
109th Airlift Wing Civil Engineering
10 North Park Avenue, Suite 330 Schenectady County Airport
1 National Guard Road, Building 25
Scotia, NY 12302 Phone: 518-344-2480 shawn.rulison@us.af.mil
Submission Number: Specification Section: Description:
A - SUBMITTAL ACCEPTED E - PRELIMINARY SUBMITTAL
B - SUBMITTAL ACCEPTABLE AS NOTED F - FOR REFERENCE, NO ACCEPTANCE REQUIRED
C - SUBMITTAL RETURNED FOR REVISION G - DISTRIBUTION COPY (PREVIOUSLY ACCEPTED)
D - SUBMITTAL NOT ACCEPTABLE
Spec. No.:
Date Received:
A D Sign & Date Designated Action Sign & Date Designated Action
B E Sign & Date Designated Action Sign & Date Designated Action
C F Sign & Date Designated Action Sign & Date Designated Action
G Sign & Date Designated Action
Submittal Cover Sheet
Submittal Action Stamp:
BMcD Engineering Project #101418
Project No./Name:
La Rhetta Bradley Shawn Rulison, BCE
101418
Stratton ANGB | Renovate
Operations Building 2A
For Approver's Use Only
Submittal Description:
Burns and McDonnell
Morristown, NJ 07960
17-Dec-21
W50S8J21F0015
Approval Action
230000
Ductwork Shop Drawing230000-005
Contractor's Approval: Submission of this document shall represent Contractors's approval as specified in the Contract
Documents. Contractor remains liable for accuracy of Submittals as provided in the Contract Documents.
junguyen Typewritten Text J. Nguyen 01/07/2022
ED.1
A
B
C
D
EX2
EXCEXDEXEEXF
V A
V
V A
V
V A
V
V A
V
VAV-210
VAV-215
16"ø SA x x
S
A
12"x10" SA
16"x12"
20"x14"
20"x14"
10"ø SA ø
S x x
8"x8"
34"x14" x
S
A
12"x12" TA x
S
A
30"x12"
TA
x
16"x14" TA
(E)-12"x6" x
E
A x
E
A x x
S
A
16"ø SA
(E)-12"x6"
(E)-12"x6"
(E)-12"x6"
(E)-12"x6"
(E)-12"x6"
(E)-12"x6"
(E)-12"x6"
RG-B
A-10"Ø
A-6"Ø
RG-B
A-6"Ø
A-6"Ø
C-8"X6"
C-8"X6"
D-12"X12"
D-12"X12"
D-30"X12"
C-6"X6"
C-6"X6"
C-6"X6"
C-10"X6"
C-10"X6"
C-10"X6"
C-10"X6"
C-10"X6"
C-10"X6"
D-12"X12"
D-12"X12"
C-8"X6"
A-6"Ø
A-6"Ø
RG-B
8"X8"
A-6"Ø
47"
34"x14"
TOD 13'-1"
BOD 11'-11"
D-36"X12"
D-36"X12"
TOD 14'-10"
BOD 13'-8"
20"x14"20"x14"20"x14"20"x14"20"x14"
47"47"47"47"47"47"
20"x14"
47"
20"x14"
47"
20"x14"
47"
20"x14"
47"
20"x14"
47"
DN
47"
18"
47"
16"x12"
47"
16"x12"
47"
16"x12"
47"24"
TOD 13'-0"
BOD 12'-0"
TOD 13'-0"
BOD 12'-0"
10"Ø
(L1)
10"Ø
6"Ø
8"Ø
8"x8" 8"x8" 8"x8" 47"47"47"47" x
26" x x
47"
12"x10" SA
47"
12"x10" SA
47"
47"
47"
32" x
S
A x
S
A x
S
A x
S
A
TOD 13'-0"
BOD 12'-2"
x
E
A
TOD 12'-11"
BOD 12'-3"
T O
D
B O
D
T O
D
B O
D
Ø
Ø
10"x8"10"x8"
47"
24"
TOD 10'-10"
BOD 10'-2"
Ø
TOD 14'-9"
BOD 13'-9"
47"
16"x14" TA
(L1)
Ø
TOD 12'-10"
BOD 12'-2 "
47"
47" x
Ø
Ø
47" x
47" x
S
A x
S
A x
S
A x
S
A x
S
A
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
Ø
Ø
47"
47" x
47"
47" x
S
A
47" x
S
A
47" x
S
A
47"
24"
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D x
47"
47"
AutoCAD SHX Text Drawn by: TEP
AutoCAD SHX Text Rev #
AutoCAD SHX Text Date
AutoCAD SHX Text Discription
AutoCAD SHX Text
109TH AIRLIFT WING
AutoCAD SHX Text M-101
AutoCAD SHX Text Scale: 1/4" = 1'-0"
AutoCAD SHX Text Date: 11-20-21
AutoCAD SHX Text Project #:21018
AutoCAD SHX Text
APPOLO
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
DUCTWORK SHOP DRAWINGS
AutoCAD SHX Text
NEW YORK AIR NATIONAL GUARD
AutoCAD SHX Text
STRATTON AIR NATION GUARD BASE
VAV-208
V A
V
VAV-207
VAV-205
VAV-204
V A
V
VAV-203
VAV-202
54"x18" RA
24"x16" SA
10"x6"
A-10"Ø
FD-1(R)
FD-3(R)
FD-4(R)
12"x8"
12"x12" 36"
12"x8"
36"x14"
H C
12"x8"
24"x16" x
48"x22"
12"x8" x
S D
M
A-6"Ø
A-8"Ø
RG-B
RG-B
RG-B
RG-B
A-10"Ø
RG-B
FD-2(R)
C-18X10"
A-10"Ø
A-6"Ø
A-6"Ø
A-6"Ø
6"Ø
Ø
Ø x
27"
47"47"
10"x6"
47"
10"x6"
47"
10"x6"
47"
47" 47"
48"x22"
47"
48"x22"
TOD 9'-3"
BOD 7'-3"
TOD 9'-3"
BOD 7'-3"
48"x22"
47"
47" x
47"
24"x16"
47"
24"x16"
FM
TOD 9'-0"
BOD 7'-6"
RG-B
x
(L1)
36"x22"
47"
FT
36"x14"
36"x14"
28"
TOD 9'-3"
BOD 7'-3"
TOD 9'-3"
BOD 7'-11"
TOD 14'-10"
BOD 13'-8"
47"47"
34"x14"
Ø
Ø
Ø
36"x14" 47"
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
16"x14" TA
(L1)
47"
TOD 10'-10"
BOD 10'-2"
Ø
Ø
8"Ø 62"
A
B
EX2
V A
V
V A
V
V A
V
V A
V
VAV-403
V A
V
24"x12"
32"x12"
VAV-216
10"x10"
24"x16" SA
RG-B
x
32"x18" RA
32"x18" RA DN
WITH W.M.S.
13"x12" 10"x12" x
S
A
12"x12" x x
A-6"Ø
A-10"Ø x
RG-B
A-6"Ø x
A-8"Ø
A-6"Ø
RG-B
A-6"Ø
A-6"Ø
RG-B
RG-B
RG-B
RG-B
RG-B
A-6"Ø
A-6"Ø
A-6"Ø
A-8"Ø
32"x12" 32"x12"
A-6"Ø
6"Ø
6"Ø 8"Ø
Ø
Ø
4"Ø x
10"x10" 10"x10" 10"x10"
24"x12"24"x12"
47"47"47"24"
47"47"47"
47"
47" 47" 47" 47"
48"
Ø
Ø
24"
Ø
Ø
Ø
Ø
6"Ø6"Ø
8"Ø
47"
8"Ø8"Ø
Ø
Ø
Ø
8"Ø
47" x
S
A
47" x
S
A
47" x
S
A
47"
8"Ø
47"
12"x12"
47"
120"120"
TOD 10'-10"
BOD 9'-10"
10"x12"13"x12" 13"x12" 13"x12"
47" 47" 47" 47"
47"
47"
T O
D
B O
D
6"Ø
8"Ø
12"x8"12"x8"
12"x12"
47"
12"x12"
47"
12"x12"
47"
12"x12"
47"
12"x12"
47"
12"x12"
47"
12"x12"
30"
18"x10"
TOD 10'-10"
BOD 9'-10"
TOD 10'-10"
BOD 9'-10"
TOD 10'-10"
BOD 9'-10"
TOD 10'-8"
BOD 10'-0"
TOD 14'-10"
BOD 14'-0"
TOD 10'-10"
BOD 9'-10"
TOD 10'-8"
BOD 10'-0"
TOD 10'-8"
BOD 10'-0"
TOD 10'-8"
BOD 10'-0"
TOD 10'-8"
BOD 10'-0"
TOD 10'-8"
BOD 10'-0"
TOD 10'-8"
BOD 10'-0"
TOD 10'-8"
BOD 10'-0"
TOD 10'-9"
BOD 9'-11"
x
AutoCAD SHX Text Drawn by: TEP
AutoCAD SHX Text Rev #
AutoCAD SHX Text Date
AutoCAD SHX Text Discription
AutoCAD SHX Text
109TH AIRLIFT WING
AutoCAD SHX Text M-102
AutoCAD SHX Text Scale: 1/4" = 1'-0"
AutoCAD SHX Text Date: 11-20-21
AutoCAD SHX Text Project #:21018
AutoCAD SHX Text
APPOLO
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
DUCTWORK SHOP DRAWINGS
AutoCAD SHX Text
NEW YORK AIR NATIONAL GUARD
15 12131415
E
F
G
H
VAV-106
VAV-107
VAV-110
VAV-109
VAV-111
VAV-108
LOCKERWOMAN'S LOCKER
ROOM
WOMAN'S TOILET
COMM
123A
18"x14" 14"x12" x
48"x20"
HC-1
x
12"x8" x x
12"x8" 10"x8"
12"x8" x x ø x
12"x8"
20"x12"
A-6"Ø
A-6"Ø
A-6"Ø
Ø
Ø
Ø
6"Ø
A-6"Ø
RG-B
RG-B
RG-B
RG-B
RG-B
RG-B
RG-B
A-6"Ø
A-8"Ø
A-6"Ø
A-8"Ø
A-8"Ø
A-8"Ø
T O
D
B O
D
A-6"Ø
A-6"Ø
A-6"Ø
A-6"Ø
B-6"X6"
B-6"X6"
A-6"Ø
A-6"Ø
A-8"Ø
A-6"Ø
RG-B
A-8"Ø x x
6"Ø
6"Ø
8"Ø10"Ø8"Ø
12"x10"
12"x8" 10"x8"10"x8"
47"
47"
47"
47"47"
20"
47"
47"
47"
10"Ø8"Ø 10"Ø x x
47"
47"
47"
31"
T O
D
B O
D
12"Ø
TOD 11'-7"
BOD 10'-5"
TOD 11'-6"
BOD 10'-6"
8"Ø
TOD 10'-8"
BOD 9'-0"
x
36"
47" 19"
47"
T O
D
F
V
B O
D
F
V x
6"Ø
47"
47"47"29"
14"x12"14"x12"
Ø
Ø
Ø
Ø
6"Ø6"Ø
47"47"
12"x8"
Ø
47" x
47" x
47" x
47" x
47" x
47" x
47"
Ø
47" x
47" x
47" x
47" x
47"
19"
TOD 11'-3"
BOD 10'-9"
TOD 11'-4"
BOD 10'-8"
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
TOD 11'-4"
BOD 10'-8"
TOD 11'-4"
BOD 10'-8"
TOD 11'-4"
BOD 10'-8"
TOD 11'-5"
BOD 10'-7"
Ø
T O
D
B O
D
T O
D
B O
D
TOD 11'-3"
BOD 10'-9"
TOD 11'-4"
BOD 10'-8"
A-8"Ø
8"Ø
Ø
Ø
47"
36"
12"x8"
TOD 11'-4"
BOD 10'-8"
6"Ø
TOD 11'-4"
BOD 10'-8"
6"Ø x
47"
47"
47" x
47"
T O
D
B O
D
AutoCAD SHX Text Drawn by: TEP
AutoCAD SHX Text Rev #
AutoCAD SHX Text Date
AutoCAD SHX Text Discription
AutoCAD SHX Text
109TH AIRLIFT WING
AutoCAD SHX Text M-103
AutoCAD SHX Text Scale: 1/4" = 1'-0"
AutoCAD SHX Text Date: 11-20-21
AutoCAD SHX Text Project #:21018
AutoCAD SHX Text
APPOLO
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
DUCTWORK SHOP DRAWINGS
AutoCAD SHX Text
NEW YORK AIR NATIONAL GUARD
AutoCAD SHX Text
STRATTON AIR NATION GUARD BASE
junguyen Callout FD not required junguyen Callout FD not required junguyen Callout FD not required. Provide transfer opening above ceiling in lieu of FD.
I
J
K
L
101112131415
VAV-104
V
A V
VAV-102
V A
V
VAV-105
x
S
A
10"x8"
8"x6"
14"x14" 12"x14"
18"x14"
COMM
123A
JC
MEN'S TOILET
NIC
8"x6" x
16"x10" x
18"x14"
8"x8"
18"x14"
14"x10"
I
J
K
L
A-6"Ø
RG-B
A-8"Ø
A-8"Ø
A-8"Ø
A-8"Ø
A-8"Ø
RG-B
A-8"Ø
A-8"Ø
A-8"Ø
A-8"Ø
A-8"Ø
RG-B
A-6"Ø
A-6"Ø
RG-B
A-8"Ø
RG-B RG-B
A-6"Ø
A-6"Ø
A-8"Ø
A-10"Ø
350 A-6"Ø
A-8"Ø
RG-B
A-8"Ø
A-6"Ø
RG-B
T O
D
B O
D
12"Ø
Ø
18"x14"18"x14"
16"x10"
12"Ø
8"Ø
Ø
Ø
Ø
Ø
Ø
Ø
6"Ø
12"Ø
47"17"
Ø
Ø
Ø
Ø
Ø
TOD 11'-7"
BOD 10'-5"
47"
14"x10"
47"
14"x10"
47"
TOD 11'-5"
BOD 10'-7"
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
Ø
47"47"47" 47"30"
T O
D
B O
D
Ø
Ø
Ø
Ø
Ø
Ø
TOD 11'-7"
BOD 10'-5"
TOD 11'-5"
BOD 10'-7"
T O
D
B O
D
T O
D
B O
D
12"x14" 18"x14"
12"x14"
47" 47"
47"
47" 47" 47"
47"
TOD 11'-7"
BOD 10'-5"
TOD 11'-7"
BOD 10'-5"
TOD 11'-4"
BOD 10'-8"
T O
D
B O
D
T O
D
B O
D
T O
D
B O
D
38"
12"x10"
47"
10"x8" 8"x6"
30"
47"
47"
47" x
8"x6"
47"
8"x6"
47"
8"x6"
47"
Ø
T O
D
B O
D
TOD 11'-4"
BOD 10'-8"
TOD 11'-3"
BOD 10'-9"
Ø
Ø
8"x6"8"x6"8"x6"6"Ø
Ø x x x
12"x8"
47"
47"47"47"
47"
47"
47"
47"
T O
D
B O
D
TOD 11'-3"
BOD 10'-9"
T O
D
B O
D
T O
D
B O
D
6"Ø
TOD 11'-3"
BOD 10'-9"
AutoCAD SHX Text Drawn by: TEP
AutoCAD SHX Text Rev #
AutoCAD SHX Text Date
AutoCAD SHX Text Discription
AutoCAD SHX Text
109TH AIRLIFT WING
AutoCAD SHX Text M-104
AutoCAD SHX Text Scale: 1/4" = 1'-0"
AutoCAD SHX Text Date: 11-20-21
AutoCAD SHX Text Project #:21018
AutoCAD SHX Text
APPOLO
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
DUCTWORK SHOP DRAWINGS
AutoCAD SHX Text
NEW YORK AIR NATIONAL GUARD
AutoCAD SHX Text
STRATTON AIR NATION GUARD BASE
junguyen Callout FD not required junguyen Callout FD not required junguyen Callout FD not required. Provide transfer opening above ceiling in lieu of FD.
UP
456789
NIC
CRU-1
x
14"x16"
Ø
20"x12" x x
20"x12"
A-14"Ø
B-18"X18"
47"
26"
47"
47"
20"
47"
47"
T O
D
B O
D
AutoCAD SHX Text Drawn by: TEP
AutoCAD SHX Text Rev #
AutoCAD SHX Text Date
AutoCAD SHX Text Discription
AutoCAD SHX Text
109TH AIRLIFT WING
AutoCAD SHX Text M-105
AutoCAD SHX Text Scale: 1/4" = 1'-0"
AutoCAD SHX Text Date: 11-20-21
AutoCAD SHX Text Project #:21018
AutoCAD SHX Text
APPOLO
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
DUCTWORK SHOP DRAWINGS
AutoCAD SHX Text
NEW YORK AIR NATIONAL GUARD