This is a Questions and Answers (Q&A) document for federal solicitation W50S8C26QA017, titled "Intel Sound Masking," issued as RFI-00001 and providing responses to inquiries received as of 28 July 2026.

The document addresses four contractor inquiries regarding sound masking system installation requirements. Key technical specifications include: the space between the drop tile ceiling and hard deck ranges from 6 to 15 feet; speakers must be placed within drop tiles rather than in the plenum due to facility-specific requirements; and a standard 3-pronged electrical outlet will be provided at the requested controller location for power supply connection. The government clarified that no site visit or walk-through will be conducted, requiring contractors to rely on the provided basic layout diagram showing hallways and their dimensions for design and proposal purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W50S8C26QA017

Title: Intel Sound Masking

RFI-00001

Providing answers to RFIs received as of 28 July 2026.

1. How much space is there between the drop tile ceiling and the hard deck?

1a. It ranges from 6-15 ft.

2. If space permits, will you accept plenum speakers instead of placing a speaker into the drop tile?

2a. Due to the nature of the facility we will require placing the speakers in the drop tiles.

3. Will you supply a standard 3-pronged outlet at the requested location for the sound masking controller to plug in the power supply?

3a. Yes, there will be 3-pronged outlet at the requested location for the sound masking controller.

4. Can we schedule a site visit/ walk-through?

4a. No, we will not be conducting a site-visit

Basic layout of the area we want to install the sound masking system in. It includes all the hallways and their dimensions.

File details come from the government source that posted it. Updated .