RFI BID LOG_04-28-22.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Repair Building 165 Federal contract opportunity
Solicitation number
W50S8A22B5202
Issued by
Department of the Army New Hampshire Army National Guard

About this file

This document contains a request for information (RFI) log and related federal contract opportunity for repair work at Building 165. The RFI log includes questions submitted by contractors and responses from the agency related to specifications, drawings, and scope of work. The federal contract opportunity is for Solicitation Number W50S8A22B5202 to repair Building 165 for the Department of the Army New Hampshire Army National Guard. The opportunity was issued with specification plans, drawings, and site visit details. Key work includes repairs to plumbing, HVAC, electrical, and interiors, along with associated site work. The response date is not provided but pre-bid questions are included in the RFI log.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Building 165, newest first.
File Type Posted
Bid Opening Sign In Sheet.pdf PDF
Abstract.pdf PDF
Amendment 02.pdf PDF
B165 POL_Drawings Revised 04-21-22.pdf PDF
01 78 00b_Template for SMS BUILDER Inputs Worksheet.xlsx XLSX spreadsheet
Amendment 01.pdf PDF
RFI BID LOG_04-21-22.xlsx XLSX spreadsheet
Site Visit List.pdf PDF
Roof 10.jpg JPG image
Roof 1.jpg JPG image
Roof 8.jpg JPG image
Roof 7.jpg JPG image
Roof 9.jpg JPG image
Roof 2.jpg JPG image
Roof 4.jpg JPG image
Roof 3.jpg JPG image
Roof 6.jpg JPG image
Roof 5.jpg JPG image
Bid Opening Map.pdf PDF
BID SZCQ162095 Specification 12April21.pdf PDF
BID_SZCQ162095_Repair_B165_Drawings_B-3_12Apr21.pdf PDF
Site visit map_BLD 165.pdf PDF
SF1442.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI

RFI TRACKER - W50S8A-22-B-5202
SZCQ162092 REPAIR POL OPS, BLDG 165
RFI #TITLEDate ReceivedDate Sent to A/EDate PostedANSWERADDENDUM ISSUED/REQUIRED
1On the water line – it looks like owner proposing 8x8x6 tee (vs. live tap and valve)? Will we be allowed to turn off the water to that line to cut in the tee? It appears that there are 2 hydrants on the line, and that it continues beyond B165. Also do not see a lot GVs in line that would isolate the line. Please clarify.
7-Apr-228-Apr-2222-Apr-22Provide tap in accordance with specification section 33 11 00 - Water Utility Distribution Piping.
2• Excess soils disposal – Waste Management has balked at taking soils from the base (due to the PFAS issue, and that there is no established acceptable PFAS levels for landfill soils). We estimate that there will be between 50-75 Y of excess soils, accounting for the 16-18” of bedding on the pipes, and replacing the spec’d base and subbase materials under the asphalt patches. It’s not a lot, but we’ll need a plan to deal with it, which usually means that the ANG needs to lose it on base. Also – this assumes we can reuse existing soils above the pipe bedding, below the select base materials or loam. Please clarify.
7-Apr-228-Apr-2222-Apr-22Excess soil can be disposed of at the existing on-base pit. Existing soils can also be reused above the pipe bedding and below the sub-base material or topsoil if the soil meets the satisfactory material requirements defined in specification section 31 23 00.00 20 - Excavation and Fill, paragraph 2.1.1.
3It looks like there will be some ledge removal near TP-1. Is it ok that we can relax the depth or bedding requirements for that end of the gas line.
7-Apr-228-Apr-2222-Apr-22Natural gas line shall be installed with 36" minimum cover and 6" minimum bedding.
4Are you looking for a de-watering plan for excavating?
7-Apr-228-Apr-2222-Apr-22Provide dewatering work plan in accordance with specification section 31 23 00.00 20 - Excavation and Fill, paragraph 1.7.1.
5Can we use the spigot on the South Side of the building for irrigation?7-Apr-228-Apr-2222-Apr-22Spigot may be used during the landscape establishment period for turf irrigation only.
6Should Category 6 cabling be distributed from Utility Room 11 or is there another room to act as the IT room?11-Apr-2211-Apr-2222-Apr-22Distribute Cat6 cabling to new data cabinet located in Admin 02. See keynotes 10 and 11 on sheet EP101
7What is required for termination of proposed Category 6 cabling? Rack
mounted or wall mounted Category 6 patch panels?11-Apr-2211-Apr-2222-Apr-22Provide 7' data cabinet in admin 02. See Sheet EP101 keynotes 10 and 11.
8Is there a room layout available for the proposed IT room?11-Apr-2211-Apr-2222-Apr-22Provide 7' data cabinet in admin 02. See Sheet EP101 keynotes 10 and 11.
9Should a rack be provided? If so is there any cable management required or a preferred manufacturer and part number?11-Apr-2211-Apr-2222-Apr-22Provide 7' data cabinet in admin 02. See Sheet EP101 keynotes 10 and 11. Provide cable management, there is no preferred part #
10Any cable tray?11-Apr-2211-Apr-2222-Apr-22No
11Spec says to provide patch cords what quantities and lengths
are required. Any patching labor required?11-Apr-2211-Apr-2222-Apr-22Provide patch cord between each jack and desktop. Cord shall be long enough for use at sit/stand desk. Per Sheet E001 detail 1.
12Should we plan to install customer provided AP’s?11-Apr-2211-Apr-2222-Apr-22No, provide ceiling mounted jack.
13It is assumed cables will be distributed on J hooks, is this correct?11-Apr-2211-Apr-2222-Apr-22Correct.
14How does the proposed 6" Water Line tie into the building? Is there an existing nipple or what is protruding from the building to make this connection?13-Apr-2215-Apr-2222-Apr-22A new 6" water line is being provided as part of this project. Refer to CS101. Coordinate with site contractor.
15Please advise how to make the connection of the proposed 6" Water Line to the Main Line? Tee connection with Mega Lug? Please confirm.13-Apr-2215-Apr-2222-Apr-22Provide tap in accordance with specification section 33 11 00 - Water Utility Distribution Piping.
16What is the depth of the gas trenching excavation?13-Apr-2215-Apr-2222-Apr-22Provide minimum cover per detail 2/C-502.
17Please provide the specifications and information for the W1 water heater.13-Apr-2215-Apr-2222-Apr-22Refer to 22 00 00.2.10 of the specifications
18Please provide the specifications and information for the RP-E1 recirculation pump.13-Apr-2215-Apr-2222-Apr-22Refer to 22 00 00.2.7 of the specifications. Pumps must be Bronze or Stainless Steel and comply with no lead requirements.
19Please provide information regarding the PTAC Controls. Is it just the PTAC control or does it go to a building energy management system?13-Apr-2215-Apr-2222-Apr-22PTAC controls are indicated in specification section 23 81 00.00 20. The PTAC controls are stand-alone and not connected to the DDC system.
20Keynote 12 on drawing EP101 tells us to install a meter. Can more information be provided such as a spec on the meter, what switchboard or panel is it metering, is there a spare breaker to connect it to, and what is entailed in connecting it to NIPRNET?13-Apr-2215-Apr-2222-Apr-22Refer to Sheet E001. Meter is ACCUVM II R + AXM-WEB2 + AXM-I01-1
21It appeared from the walk through that the new fire alarm system isn’t completely finished. Are we going to be able to do the small amount of fire alarm work or is that going to need to be completed by NEI as not to void the warranty?13-Apr-2215-Apr-2222-Apr-22Installation of new fire alarm will be completed prior to beginning B165 renovation. All additional work must be performed in a way that the warranty is not voided.
22What is the expected construction start date?14-Apr-2215-Apr-2222-Apr-22Construction start is anticipated on or before July 15.
23Can the site superintendent be the SSHO? Or must the Site Superintendent and SSHO be two separate individuals? Must the SSHO be present everyday on site, or does the site super qualify as an Assistant SSHO on the days SSHO is not present?14-Apr-2215-Apr-2222-Apr-22The site superintendent can also be the SSHO. The SSHO (or site supervisor if it is the same individual) must be present at all times.
24Please confirm the delegated design requirements for this project. The specifications only list delegated design in 23 00 00 for ATFP bracing, but no details on what is required to be delegated design.14-Apr-2215-Apr-2222-Apr-22Delegated design is not required for ATFP bracing. A delegated design is required for the sprinkler system
25What are the security clearance requirements to access the jobsite location? Will a Real ID be required for background checks for base access?14-Apr-2215-Apr-2222-Apr-22Specification Section 01 14 00 provides information regarding security requirements.
26Please confirm COVID protocols and/or vaccination requirements for the project14-Apr-2215-Apr-2222-Apr-22DD Form 3150 is required.
27Please clarify requirements for 3rd Party Independent Inspections. Will you please provide a list or table of required 3rd party independent inspections? Specs call for GC to furnish 3rd Party Inspections for any inspections called for the building official to conduct in the ICC. Please confirm if GC is responsible for engaging 3rd Party Inspections, the type and quantity of each for Concrete Slab & Under Floor, Above Ceiling, Rough In, Framing, GWB screw, Plumbing Rough, Plumbing Final, Electrical Rough, Electrical Final, Energy Efficiency for Fenestration U Value, Roofing, Sprinkler, Fire Alarm, Fire Door, Structural Steel, Seismic Resistance, Masonry Infill, Soil, Asphalt14-Apr-2215-Apr-2222-Apr-22Required inspections are described in the specifications.
28Sustainability reporting - is this required as outlined in spec section 01 33 29?14-Apr-2215-Apr-2222-Apr-22Sustainability reporting is not required.
29New resilient base is called out for wall in rooms with new epoxy floor. Please confirm you don't want epoxy cove base integrated with the floors in these areas.14-Apr-2215-Apr-2222-Apr-22Confirmed - intent is to use resilient base
30Please clarify locations on AD101 for keynote #8 noting removal of resilient base.14-Apr-2215-Apr-2222-Apr-22Design intent is to remove resilient vinyl wall base at partitions indicated to be removed and for OLI 2 remove vinyl base at rooms 02 and 06
31Is there any Interior Signage required under this contract? If so, please clarify Interior signage quantities and locations.14-Apr-2215-Apr-2222-Apr-22Yes - provide room identification signage (room name, removable inserts for office, and HC bathroom signage). Refer to details.Updated AE740
32Toilet partitions - are these existing salvaged to be reinstalled or new furnished by GC?14-Apr-2215-Apr-2222-Apr-22Design intent is for new toilet partitions furnished by GC
33Manufacture red metal casework is listed in the spec book but not found on drawings? Please confirm if there is any metal casework for the GC to furnish and/or install.14-Apr-2215-Apr-2222-Apr-22Metal casework is to be used at LAB 01 (refer to details on AE540)
34Is shoring required for any of the CMU wall removals?14-Apr-2215-Apr-2222-Apr-22

No - interior partitions are not load bearing.

35Utility - who pays for utility company (Until) work?14-Apr-2215-Apr-2222-Apr-22Contractor must pay for utility work. Refer to note 8 an drawing C-001.
36Are there Geotech, Soils and Hazmat reports? Is there any known asbestos, lead paint, PCBs or other hazardous materials on site marked for disturbance or removal in addition to the fuel oil tank?14-Apr-2215-Apr-2222-Apr-22There are no hazmat reports, there are no know asbestos, lead paint, PCB's or other hazardous materials on site.
37Do any of the items marked for demolition and removal classify as Universal Hazardous Waste that may require remediation (such as fluorescent lamps and associated ballasts, mercury containing t-stats, exit signs, emergency light batteries etc.)14-Apr-2215-Apr-2222-Apr-22Fluorescent lamps and associated ballasts, exit signs and emergency light batteries are included in the project.
38Evidence of leaking windows were observed at the site walk. Shall we carry an allowance to repair wall openings beyond the scope called out in the drawings to replace the windows?14-Apr-2215-Apr-2222-Apr-22Recommend carrying allowance (~$200/window)
39Please confirm that on AE101 there are (4) locations tagged as keynote "3" that should be tagged as keynote "4" at penetrations.14-Apr-2215-Apr-2222-Apr-22Keynote "3" indicated in rooms 09 and 11 should be keynote "4"Updated AE101
40Please clarify the scope of OLI-4 as detailed on M-401. The part plans are titled as OLI-4, but only some of the keynotes are labeled as OLI-4. Is the entire scope shown on the plans to be included in OLI-4, or only the specific items tagged with keynotes that mention OLI-4?14-Apr-2215-Apr-2222-Apr-22Items not tagged as OLI-4 should be considered part of the base bid. For example the provision of the water meter.
41The drawings call for GC to provide temp power, water, heat and cooling to Rms 01, 07 and 09 for government access and use throughout construction. The specifications call for temp water and power to be metered and charged to the GC. Please confirm if GC is responsible for temp power and water costs for Rms 01, 07, 09. If so, please confirm how we should estimate/price the quantity of demand for electricity and water to those rooms, or if an allowance should be carried for these temporary utilities.14-Apr-2215-Apr-2222-Apr-22NHANG will not charge Contractor for electrical power. Water should be metered at the hydrant and paid for by the Contractor.
42Sheet CS101 shows a dashed bubble around Bldg 165 implying there is an enlarged plan. Please confirm if there is an enlarged plan showing invert to water line tie in.14-Apr-2215-Apr-2222-Apr-22The dashed bubble around the building is illustrative for anti-terrorism requirements. No enlarged plan is available.
43How does the proposed 6" Water Line tie into the building? Is there an existing nipple or what is protruding from the building to make this connection?14-Apr-2215-Apr-2222-Apr-22Please refer to RFI #14.
44Please confirm depth of connection to existing natural gas line.14-Apr-2215-Apr-2222-Apr-22The natural gas line has not yet been constructed. The natural gas line will be installed by others under separate contract with 36-inch cover.
45Will there need to be a new gas meter at Bldg 165?14-Apr-2215-Apr-2222-Apr-22Yes.
46Will the water main be shut down for the water service tie in, or should we plan for a wet tap?14-Apr-2215-Apr-2222-Apr-22Provide tap in accordance with specification section 33 11 00 - Water Utility Distribution Piping.
47Are any new relays (lighting, door locks, music, security etc.) required to be installed to the Fire Alarm system?14-Apr-2215-Apr-2222-Apr-22Sprinkler connection.
48Are there any required contractors or vendors for Fire Protection or Fire Alarm work?14-Apr-2215-Apr-2222-Apr-22There are no required contractors, but you must match existing Monaco equipment.
49Light switch outside Closet 02A has a subscript "P" which is not defined on E-001. Please clarify.14-Apr-2215-Apr-2222-Apr-22Provide switch with pilot light.
50Lighting control diagram refers to Open Office Area 601 which is not labeled on the plan. Please clarify which rooms diagram 2/EL101 applies to.14-Apr-2215-Apr-2222-Apr-22Open office area 601 should read Admin 02, acct fcc 07/07a, classroom 04. Rooms with low voltage switches shown.
51Note 2/EP120 refers to 3rd party testing required for new Munitions Inspection and Assembly Facility. Please clarify if that refers to Bldg 165, or if it refers to another building, please provide location of the other building and extent of testing required there.14-Apr-2215-Apr-2222-Apr-22This refers Building 165.
52E-001 shows wireless access points provided by NHANG. Will NHANG install WAPs as well? Or is GC responsible for install?14-Apr-2215-Apr-2222-Apr-22NHANG is responsible for the installation of WAP's, contractor is responsible to install the infrastructure.
53Is there a required vendor from whom to source the new meter per keynote 12/EP101?14-Apr-2215-Apr-2222-Apr-22Refer to Drawing E001. Meter is ACCUVM II R + AXM-WEB2 + AXM-I01-1
54If OLI 6 is not awarded, should GC still proceed with related removals per ED101?14-Apr-2215-Apr-2222-Apr-22No, don't remove lights if not otherwise required for room renovations if OLI 6 not done.
55Are we required to carry fees for 3rd party fire watch while Fire Alarm system is under modification?14-Apr-2215-Apr-2222-Apr-22No.
56Will the gov't provide storage space for salvaged items, or should GC furnish storage containers?14-Apr-2215-Apr-2222-Apr-22Contractor shall securely store all salvaged items indicated for reuse on the project.
57Do any salvaged items require temperature and/or climate controlled storage?14-Apr-2215-Apr-2222-Apr-22No.
58Will the government be furnishing any material deliveries to the project site for installation by GC or others? If finishing deliveries to site, should GC carry an allowance for storage facilities to house Government supplied items, or will Government retain its own storage for Government furnished items?14-Apr-2215-Apr-2222-Apr-22No materials will be furnished by the Government.
59Please confirm all utility cutovers are to be performed after normal working hours (7am-430pm Mon-Fri), on weekends or holidays14-Apr-2215-Apr-2222-Apr-22Per specification 01 14 00, make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays.
60Is there a current NPDES or EPA Individual, General, or Remediation General Permit in place that covers the project site? If so, will you please provide the permit number(s)?14-Apr-2215-Apr-2222-Apr-22No there are no current NPDES or EPA individual, general or remediation general permits in place that cover the project site.
61Please specify where the project site's storm water drainage leads to (i.e.. Retention pond, municipal sewer system, public water way etc.)14-Apr-2215-Apr-2222-Apr-22The storm water from the site is collected by a drainage system which discharges to a municipal drainage system off NHANG property.
62Door 01B at room Lab 01 requires a 1-HR fire rating per the Door Schedule. Please confirm none of the partitions at room Lab 01 require fire rating.14-Apr-2215-Apr-2222-Apr-22New Lab walls will need to be rated. Refer to revised drawings.Revised AE001, AE101, AE401
63Please confirm the existing ceiling type in closets 02A, 03A, 04A. Are these rooms to receive new ceilings?14-Apr-2215-Apr-2222-Apr-2202A is ACT and should be replaced/patched at wall relocation
03A is gypsum board to remain and be repaired as required at sprinkler work 04A is ACT to remain.Updated AE701
64Can you please provide an SMS Builder Workbook template?14-Apr-2215-Apr-2222-Apr-22Yes, the SMS Builder Workbook is attached.
651/AD201 shows an existing louver for dryer vent. Dryer vent is marked for removal. Please clarify if louver should remain, or be removed. If removed, please specify wall patch detail.14-Apr-2215-Apr-2222-Apr-22At removed louvers keynotes 6 and 7 should be tagged and infilled according to detail 4/AE501.Updated AD201/AE201
66Please confirm detail referenced in keynote 2/AE101 should be 2/FX501 instead of 1/FX00114-Apr-2215-Apr-2222-Apr-22Keynote 2 on AE101 should reference detail 1/FX501Updated AE101
67Please confirm partition type for furring wall infill at women's locker room east and north walls. Should we carry an allowance to repair existing drywall following demolition of closet and removal of hvac units, privacy partitions, etc.?14-Apr-2215-Apr-2222-Apr-22Infill at exterior walls (keynote 3) references detail 4/AE501, wall type ND is behind lavatories with the addition of rigid insulation against exterior wall per detail 1/AE501.
68Please confirm the sink shown in LAB 01 on AE401 is to be reinstalled from salvage.14-Apr-2215-Apr-2222-Apr-22Confirmed - intent is to salvage and reuse the sink in LAB.
69Please specify the quantity and locations for Mop and Broom Holder, Soap Dispensers and Trash Receptacles14-Apr-2215-Apr-2222-Apr-22(1) mop holder in 03A, (5) soap dispensers as indicated on plans, NHANG to confirm provision of trash receptacles.
70Please confirm the detail at bottom of sheet AE501 is 7/AE50114-Apr-2215-Apr-2222-Apr-22Confirmed - detail at bottom of sheet AE501 is 7/AE501.
71Please confirm impact resistant, laminated glass and wet glazing requirements on this project. If UFC-4-010-01 must be met, please provide a list of manufacturers who can adhere to these standards. Are these standards applicable to aluminum windows, new entry doors and sidelites? Please also confirm if engineered stamped shop drawings are required for aluminum window, entry doors and sidelites?.14-Apr-2215-Apr-2222-Apr-22The Laminated Glazing requirements outlined in specification section 08 81 00 paragraphs 2.1.1 and 3.2.1 reflect requirements of Section 3-11.1 of UFC 4-010-01 and is required for glazing for exterior building elements (doors, storefronts, windows, sidelites). There are no ATFP specific calculations required. Refer to individual specification sections for required shop drawings/calculations (shop drawings for doors and sidelites/shop drawings, structural deflection calculations, and airblast test results for windows).
72Please confirm we need to furnish and install an access panel in the ceiling in women's locker room for the dryer vent. Not shown on AE70114-Apr-2215-Apr-2222-Apr-22Confirmed - provide access panels indicated on mechanical drawings
73Does structure above Control Rm 09 and Utility Room 11 get painted? If so, does mechanical equipment, pipes, ducts etc. also get painted?14-Apr-2215-Apr-2222-Apr-22Ceiling structure in rooms 09 and 11 do not require painting
74Please clarify tile details for wall base (cove?), corners (butt or bullnose?) and top of tile (bullnose or metal trim).14-Apr-2215-Apr-2222-Apr-22Cove base, bullnose corners, and bullnose top
75Please clarify where CWT-1 and CWT-2 apply in finish schedule14-Apr-2215-Apr-2222-Apr-22CWT-1 at Men's Locker 03 and CWT-2 at Women's Locker 10Updated AE740
76Keynote #2 seems to be misplaced in on elev 1, 7 and 8 on AE741, please clarify if this should be a different note or disregarded14-Apr-2215-Apr-2222-Apr-22Keynote"2" indicated on details 1, 4, 7, and 8 on AE741 should be keynote "5" (Locker Plinth)Updated AE741
77Please clarify extent of electrical and tel/comm scope at new workstations. Is GC responsible for devices, cabling, terminations and labeling?14-Apr-2215-Apr-2222-Apr-22Refer to sheet E001, detail 1 for faceplate that includes termination information for the jacks. EP101 indicates quantity and locations.
78Please clarify spec and location of recirculation pump on M-401 (Keynote 10)14-Apr-2215-Apr-2222-Apr-22Refer to 22 00 00.2.7 of the specifications. Pumps must be Bronze or Stainless Steel and comply with no lead requirements. Also refer to the Pump Schedule on P-601. The location of pump is approximately as shown on M-401
79Please confirm is HC-1 and HC-2 on the Mechanical Plan refer to DC-1 and DC-1 on the Mechanical Schedule14-Apr-2215-Apr-2222-Apr-22These are the same coils. The coils are mislabeled on P-601. The coils should be labeled HC-1 and HC-2
80P-102 does not show a floor drain in Women's Locker room, but the riser diagram shows it. Please confirm there should be a new floor drain installed here.14-Apr-2215-Apr-2222-Apr-22Provide floor drains in the men's locker, women's locker, and lab. Locations as indicated on the underslab sanitary piping part plan P-102, Detail 2
81Please confirm if and where floor cleanouts are required in Men's and Women's Locker Rooms14-Apr-2215-Apr-2222-Apr-22A floor cleanout is required in the men's room near WC-1 as indicated on P-102, Detail 2
82Please confirm if the FD shown on 1/P-102 is existing to remain.14-Apr-2215-Apr-2222-Apr-22Provide floor drains in the men's locker, women's locker, and lab. Locations as indicated on the underslab sanitary piping part plan P-102, Detail 2
83Please provide spec for water hammer arrestor14-Apr-2215-Apr-2222-Apr-22Refer to specification sections 22 00 00.2.1.4.a and 22 00 00.3.1.1.8
84Please provide spec for wall clean outs14-Apr-2215-Apr-2222-Apr-22Refer to specification sections 22 00 00.2.1.4.c and 22 00 00.3.1.6
85What are the particular curb and shower pan details required at shower enclosures?14-Apr-2215-Apr-2222-Apr-22Shower pans come with enclosures and should be installed per manufacturers instructions to provide proper egress
86Please clarify quantity and locations for TMV-1 and TMV-214-Apr-2215-Apr-2222-Apr-22TMV-1 will be provided the water heater replacement as part of OLI-4 and will be located in the utility room.
87Please clarify location of existing dishwasher to be removed and salvaged.14-Apr-2215-Apr-2222-Apr-22The dishwasher is in the lab. Refer to Keynote 9 on PD101 and Keynote 4 on P-101
88Please confirm circuit L2A-9 and 66 on EL101 are typos and should be LPA-9 and 6614-Apr-2215-Apr-2222-Apr-22Correct circuits are LPA-9 and LPA-66
89Should floors be sloped to floor drains? If so, please provide detail.14-Apr-2215-Apr-2222-Apr-22Floors are not required to be sloped to drains.
90Please clarify wall and ceiling finishes above shower enclosures.14-Apr-2215-Apr-2222-Apr-22Showers will have painted gypsum board (metal framed) ceiling/soffit above the shower units/enclosures.
91SH-1 model is discontinued, please provide alternate spec14-Apr-2215-Apr-2222-Apr-22Provide Oasis SH-3636 series or equivalent
92Are the specifications available for the light fixtures?14-Apr-2215-Apr-2222-Apr-22Fixtures are to meet specifications on lighting fixtures schedule on sheet EL101 and specification section 26 51 00.
93Please confirm if air barrier or air leakage testing is required14-Apr-2215-Apr-2222-Apr-22There is no overall air barrier testing. Refer to specifications for window and door weather-stripping air infiltration/leakage requirements.
94Please confirm if taxes should be carried in proposals?26-Apr-2226-Apr-2228-Apr-22Unclear what the question is asking. For the IFB, the contractors will provided FFP for each CLIN. New Hampshire is a Tax free state. For payrolls the contractor is responsible for the full burdened Wage Rate. (NHANG response)
95Please confirm if any state, local, and/or Federal permits will be required on this project?26-Apr-2226-Apr-2228-Apr-22No there are no current NPDES or EPA individual, general or remediation general permits in place that cover the project site. Any local building trade permits required must be secured by the Contractor.
96Please confirm if there are any known hazardous materials?26-Apr-2226-Apr-2228-Apr-22There are no hazmat reports, there are no know asbestos, lead paint, PCB's or other hazardous materials on site. Fluorescent lamps and associated ballasts, exit signs and emergency light batteries are included in the project.
97Please confirm the requirement for water the seeded areas?26-Apr-2226-Apr-2228-Apr-22Spigot on the south side of the building may be used during the landscape establishment period for turf irrigation only. Provide turf watering in accordance with specification section 32 05 33 - Landscape Establishment.
98Drawing CS-101 keynote 9 refers to detail 5 on drawing C-502 which shows a tee being installed verses a live tap and valve. It appears that there are 2 hydrants on the line, and then it continues beyond B165. Also, it appeared there weren't to many gate valves in line that would isolate the line. Will contractors be allowed to turn off the water for some length of time to cut in the tee or will a live tap and valve be excepted?26-Apr-2226-Apr-2228-Apr-22Provide live tap in accordance with specification section 33 11 00 - Water Utility Distribution Piping.
99There will be some excess soils to be removed and disposed. Due to the PFAS issue, and that there is no established acceptable PFAS levels for landfill soils, in the past the NHANG has allowed for any of the contaminated materials to be left on site. Please confirm if the excess materials can be left on site or if it needs to be hauled off?26-Apr-2226-Apr-2228-Apr-22Excess soil can be disposed of at the existing on-base pit. Existing soils can also be reused above the pipe bedding and below the sub-base material or topsoil if the soil meets the satisfactory material requirements defined in specification section 31 23 00.00 20 - Excavation and Fill, paragraph 2.1.1.
100It appears that there will be some ledge removal near TP-1. Can the depth be relaxed or bedding requirements for that end of the gas line?26-Apr-2226-Apr-2228-Apr-22Natural gas line shall be installed with 36" minimum cover and 6" minimum bedding.
101Spec section 01 50 00 / Para 3.2.a states water and electricity will be able to be used for a monthly prorated cost. Please confirm what the cost is for the water?26-Apr-2226-Apr-2228-Apr-22Water should be metered at the hydrant and paid for by the Contractor per local utility rates.
102How does the proposed 6" Water Line tie into the building? Is there an existing nipple or what is protruding from the building to make this connection?26-Apr-2226-Apr-2228-Apr-22A new 6" water line is being provided as part of this project. Refer to drawings CS101 and FX501. Coordinate with site contractor.
103How are they planning on making the connection of the proposed 6" Water Line to the Main Line? Tee connection with Mega Lug? Please confirm.26-Apr-2226-Apr-2228-Apr-22Provide live tap in accordance with specification section 33 11 00 - Water Utility Distribution Piping.
104What is the depth of the gas trenching excavation?26-Apr-2226-Apr-2228-Apr-22Natural gas line shall be installed with 36" minimum cover and 6" minimum bedding.
105Please confirm if the Superintendent can be all three hats (super, QC, & SSHO) or if there needs to be a separate person for each position?26-Apr-2226-Apr-2228-Apr-22The site superintendent can also be the SSHO. The SSHO (or site supervisor if it is the same individual) must be present at all times.
106Part 2 Products 2.3.2 Source Limitations Given Monaco’s existing supply chain issues will it be acceptable to procure material from other vendors?26-Apr-2226-Apr-2228-Apr-22Products must be Monaco or interoperable with Monaco. Monaco has a GSA Catalog for a majority of their products. Monaco will determine if parts are interoperable and not the Government.
107Outside B165 is there any requirements to update any software or hardware for the existing Monaco Mass Notification System. Please specify?26-Apr-2226-Apr-2228-Apr-22Nothing outside B165.
108Will any work be required outside of five feet beyond B165 building footprint?26-Apr-2226-Apr-2228-Apr-22Yes, the required site and utility work is indicate on the Civil drawings.
109Will the D21 Monaco system need to be modified with hardware or software to meet any requirements of this project?26-Apr-2226-Apr-2228-Apr-22No.
110Please identify if there are any explosion proof electrical requirements for this project?26-Apr-2226-Apr-2228-Apr-22Refer to Keynote 8 on EP101 and EL101
111Drawing EL101 dated 02-12-2021 depicts horn strobes. Is it the intent of the design for these devices to be horn strobes or speaker strobes?26-Apr-2226-Apr-2228-Apr-22Speaker strobes to match existing newly installed system.
112Drawing EL101 dated 02-12-2021 only indicates horn strobes for notification devices. Will other Mass Notification devices be required for this project?26-Apr-2226-Apr-2228-Apr-22No.
113Will NICET certified technicians be required on-site during the demolition of the fire alarm system devices?26-Apr-2226-Apr-2228-Apr-22Yes, refer to Specification 28 31 76, paragraph 1.6.1.1. A

NICET Level 4 Fire Alarm Technician shall supervise the modifications to the existing fire alarm system/mass notification system.

114Are there any requirements for PE Stamped drawings for fire alarm and mass notification submittals?26-Apr-2226-Apr-2228-Apr-22No.
115Are there any third-party commissioning requirements for the modification of the fire alarm and mass notification system?26-Apr-2226-Apr-2228-Apr-22No, refer to Specification 28 31 76 paragraph 1.6.1.4 for testing personnel requirements.
116We were unable to get on the roof of the building. Can the Government provide pictures of the entire roof?26-Apr-2226-Apr-2224-Mar-22pictures posted with site visit information in "Update 1, 24MAR22"
117Commissioning is mentioned in several locations throughout the project

specs referring to Commissioning section 01 91 00.15, but section 01 91

00.15 was not included in the specification manual. Is Commissioning

required for this project?26-Apr-2226-Apr-2228-Apr-22Commissioning is not required for this project. Please disregard references to commissioning in the specification.
118Should we provide pricing to inspect existing mechanical equipment marked to remain for benchmarking performance, and install clean filters at beginning and end of construction? If so, how should we format pricing given the multiple scenarios that may develop pending the acceptance of the OLIs?26-Apr-2226-Apr-2228-Apr-22No need to inspect and benchmark, but the contractor will be responsible for protecting existing surfaces and equipment during construction and their activities should not lead to excess loading of the filters.
119Should we carry costs for floor prep for the shower enclosures?26-Apr-2226-Apr-2228-Apr-22Provide floor preparations for shower enclosures per the manufacturers’ written installation requirements.