Appendix A - Hangar 253 Building Plans.pdf

PDF 14 MB Posted

Attached to
Paint Booth
Solicitation number
W50S8A20Q0005
Issued by

About this file

This sources sought notice seeks capability statements from interested parties to provide a paint booth and installation services on-site at Pease Air National Guard Base. The New Hampshire Air National Guard requires a commercial off-the-shelf paint booth under CLIN 0001 and installation services under CLIN 0002. Respondents should provide pricing, lead time, product origin, details on fire suppression systems, confirmation of sufficient compressed air supply, and indicate if they are a prime contractor or subcontractor. The notice specifies information required in capability statements, including organization details, size standard, and NAICS codes. Based on responses, the requirement may be set aside for small businesses or procured through full and open competition with potential for multiple awards. Responses are due by email to the specified contracting officer and specialist by the stated deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

F

F

F F

FFF

F

F

F

F

FF

F

F

AE-201

AE-201

AE-202

AE-202

8' 9'

D'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2'

AE-301

193'-1"

NEW SINK

1 7

B

A

C

D

E

F

G

H

J

2 3 4 5 6

AE-302

31'-6" 31'-6" 31'-6" 31'-6" 31'-6" 31'-6"

HANGAR

COMPOSITE SHOP

AIRLOCK

PREP ROOM

SANDING (DIRTY)

CTK

STRUCTURAL OFFICE

AE-302

AE-301

PAINT MIXING

PAINT STOR

SE STORAGE

COMPRESSED AIR

143A B C

COMMUNICATIONS

MEN LOCKER DIRTY

MEN RESTROOM

DIRTY

MEN SHOWER DIRTY

JANITOR

WOMEN LOCKER

DIRTY

WOMEN SHOWER

DIRTY

WOMEN RESTROOM

DIRTY

WOMEN LOCKER

CLEAN

MEN LOCKER CLEAN

MEN RESTROOM

CLEAN

WOMEN RESTROOM

CLEAN

AE-104

AE-105

HEF ROOM

104A

103A 104 102

110112

AE-304

AE-304

AE-305

189'-0"

AE-306

AE-501

AE-102

13'4'

AE-501

OPP

KEYNOTES

1 KC-46 AIRCRAFT

2 KC-46 AIRCRAFT REQUIRED CLEARANCE

3 KC-135 AIRCRAFT

4 KC-135 AIRCRAFT REQUIRED CLEARANCE

5 REPLACE GYPSUM WALL BOARD INSIDE STAIR

TOWER AND EFFECTED AREA IN MECHANICAL

MEZZANINE.

6 EXISTING OVERHEAD DOOR TO REMAIN

7 16"X16" AIR HOSE ACCESS DOOR

8 TRENCH DRAIN, RE: PLUMBING

9 STEEL BOLLARDS RE: DETAIL 4/AE511.

PAINT YELLOW

AE-307

AE-303

AE-103

PLAN

NORTH

TRUE

NORTH

SCALE: 1/16" = 1'-0"

FLOOR PLAN

0' 4' 8' 16' 32'

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

AE-101

OVERALL FLOOR PLAN

09 APRIL 2015

G UECKER

B BRADDICK

R WENTE

Q REMY

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

1006210771C Rectangle

1006210771C Callout Room 129 Approximate Paint Booth Location

1006210771C Rectangle

1006210771C Rectangle

1006210771C Callout Main Electrical Room

1 2 3A B

1006210771C Rectangle

1006210771C Rectangle

1006210771C Callout Room 129 South Elevation

1006210771C Callout Room 129 East Elevation

1006210771C

10" Dia Exhaust Duct (Unused)

1-888-640-4297

FINISHED FLOOR

0'-0"

8'9' 7' 5'10'12'14'15' 3' 2'

AE-301

17 234562

AE-302

MEN LOCKER CLEAN

MEN RESTROOM

CLEAN

COMMUNICATIONS

102 104 104A

AE-304

AE-305

AE-306

EQUIPMENT PLATFORM

15'-4"

13'

1 2

9 9

SE STORAGE

EQUIPMENT PLATFORM

MECHANICAL

FINISHED FLOOR

0'-0"

D'E'F'G' C' B' A'

NEW HANGAR TAIL DOCKEXISTING HANGAR

2 3/4" / 1'-0"

1'- 2"

/ 1 '-0

BA C D E F G H J

AE-302

TOP OF MID. DOOR OPENING

60'-0"

AE-301

1/2" / 1'-0"

AE-304

EQUIPMENT PLATFORM

15'-4"

MULLION CLEAR HEIGHT

30'-0"

AE-307

AE-503

AE-503

AE-502

AE-503

AE-502

AE-504

0' 4' 8' 16' 32'

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by No. Date

SheetAS SHOWN

Stamp

AE-301

BUILDING SECTION

09 APRIL 2015

G UECKER

B BRADDICK

R WENTE

Q REMY

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/16" = 1'-0"

HANGAR SECTION

SCALE: 1/16" = 1'-0"

HANGAR SECTION

KEYNOTES

1 KC-46 AIRCRAFT

2 KC-46 AIRCRAFT REQUIRED CLEARANCE

3 DUCTWORK RE: MECHANICAL

4 INSULATION CORE WALL PANEL R-26 MINIMUM

5 EMERGENCY EYEWASH/SHOWER STATION

6 3 PANEL VERTICAL LIFT FABRIC DOOR

7 STEEL CROSS BRACING RE: STRUCTURE

8 LIGHTNING ROD RE: ELECTRICAL

9 SNOW/ICE GUARD RE: SPECS

10 INSULATED TRANSLUCENT SANDWICH PANEL

DAYLIGHTING SYSTEM RE: SPECS RE: AE-510

11 10" X 10" X 1/4" TUBE STEEL DOWNSPOUT PAINT

TO MATCH ADJACENT SURFACE

12 EQUIPMENT PLATFORM ACCESS LADDER

13 NOT USED

14 UPPER INSULATION CORE WALL PANEL FROM MRF.

COLORS TO MATCH SHERWIN WILLIAMS SW6115 -

TOTALLY TAN

15 PRE FINISHED METAL TRANSITION FLASHING TO

MATCH SHERWIN WILLIAMS SW6069 - JUTE BROWN

16 LOWER INSULATION CORE WALL PANEL FROM MRF.

COLORS TO MATCH SHERWIN WILLIAMS SW6096 -

JUTE BROWN

1006210771C Rectangle

1006210771C

Room 129 Building Section

Rectangle

1006210771C

Room 129

F

F

F

F F

FFF

F

F

F

F

FF

F

F

F

F

F

1006210771C Rectangle

1006210771C

8' 9'

D'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2'

1 7

B

A

C

D

E

F

G

H

J

2 3 4 5 6

13' 4'

ACCU-253-2

ACCU-253-1

UH-1

ERH-8

EF-19

HVU-1HVU-2

ERH-7

MAU-1

FCU-253-4

FCU-253-5

EF-23

FCU-253-2

ERH-5

CF-3

FCU-253-1

FH-1

FCU-253-3

B-3 B-2

B-1

EF-22

CF-5

HVU-4

HVU-3

DOAU-1

VFD-2 VFD-1

VFD-3

EF-24

EF-14

EF-11

EF-5

EF-20

ERH-3

ERH-4

ERH-2

ERH-1

EF-21

CF-4

ERH-6

CF-1 CF-2

RH-4

RH-3RH-2

RH-1

EF-15

EF-6

EF-7

EF-8

EF-10

EF-12

EF-13

EF-4

EF-2

EF-1

EF-16

CTK

FUEL

SYSTEMS

WASH

ROOM

HANGAR

COMPOSITE

SHOP

PREP

ROOM

SANDING

(DIRTY)

SE

STORAGE

MEN

RESTROOM

CLEAN

WOMEN

RESTROOM

CLEAN

COMMUNICATIONS

COMPRESSED

AIR

CCU-253-2

CCU-253-3

FCU-253-6

ACCU-253-4 ACCU-253-3

HEF

105A

STORAGE

WARP

STORAGE

CORRIDOR

103B

WOMEN

LOCKER

108A

WOMEN

RESTROOM

VESTIBULE

LAUNDRY

109B

MEN

RESTROOM

MECHANICAL

MEN

LOCKER

CORRIDOR

FUELS

SUPERVISOR

104A

STORAGE

103A

HWP-5

HWP-4

HWP-6 HWP-7

CO

CO

CO

CO

CO

CO

CO

AC-2

CO CO

HR-3

HR-1 HR-2

HANGAR

SF-3

HVU-5

AC-1

EF-25

HWP-3 HWP-2

HWP-1

ET-1

DIZ-T-5'-7'

DIZ-T-8'-9'

DIZ-T-9'-10'

DIZ-T-11'-12'

EF-17

NO2

NO2

NO2

NO2

NO2

NO2

NO2

NO2

EF-18

ACCU-253-5

EXISTING

OVEN

HR-6 HR-7

HR-4HR-5 HR-9 HR-8

HR-10HR-11

EF-26

DESPATCH

OVEN

SF-4

ACCU-253-6

H-1

H-2

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

Au to ca d

Pr oj ec ts

\P ea se

AF

B H an ga rs \D ra w in gs

\A ut oC

AD

R ef er en ce

SZ

C

Q

-G -B

SA

R

C 1.

dw g gu ec ke r

AS SHOWN

Stamp

M-100

OVERALL MECHANICAL HVAC FLOOR PLAN

09 APRIL 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/16" = 1'-0"

OVERALL MECHANICAL HVAC FLOOR PLAN1

0' 4' 8' 16' 32'TRUE

NORTH

PLAN

NORTH

KEYED NOTES:

PROVIDE CARBON MONOXIDE DETECTORS SIMILAR TO "HONEYWELL E3POINT E3SB" SERIES WITH

E3SCO CO DETECTION CARTRIDGE. THE DETECTORS SHALL BE CAPABLE OF COMMUNICATING

WITH THE DDC BAS SYSTEM. DETECTOR SHALL BE PROVIDED WITH A HEAVY DUTY HINGED

ENCLOSURE AND SENSOR END OF LIFE INDICATION. THE CO DETECTOR SHALL HAVE A

MEASUREMENT RANGE OF 0-200 PPM. THE INITIAL SETTING SHALL BE 20 PPM. (ADJ.) MOUNT CO DETECTORS 5'-0" AFF. CO DETECTORS SHALL BE NO MORE THAN 80' STRAIGHT LINE DISTANCE

FROM EACH OTHER OR 40'-0" FROM THE TAIL OR NOSE ENDS OF THE HANGAR. ENTIRE

PERIMETER OF HANGAR SHALL BE COVERED. IF SENSORS DETECT CONCENTRATIONS

EXCEEDING 50 PPM (ADJ.) AN ALARM SHALL SOUND LOCALLY AND SHALL BE REPORTED

THROUGH THE FIRE ALARM CONTROL PANEL. TYPICAL.

PROVIDE NITROGEN DIOXIDE DETECTORS SIMILAR TO "HONEYWELL E3POINT E3SB" SERIES WITH

E3NO2 NO2 DETECTION CARTRIDGE. THE DETECTORS SHALL BE CAPABLE OF COMMUNICATING

WITH THE DDC BAS SYSTEM. DETECTOR SHALL BE PROVIDED WITH A HEAVY DUTY HINGED

ENCLOSURE AND SENSOR END OF LIFE INDICATION. THE NO2 DETECTOR SHALL HAVE A

MEASUREMENT RANGE OF 0-10 PPM. THE INITIAL SETTING SHALL BE 1 PPM. (ADJ.) MOUNT NO2 DETECTORS 5'-0" AFF. NO2 DETECTORS SHALL BE NO MORE THAN 80' STRAIGHT LINE DISTANCE

FROM EACH OTHER OR 40'-0" FROM THE TAIL OR NOSE ENDS OF THE HANGAR. ENTIRE

PERIMETER OF HANGAR SHALL BE COVERED. IF SENSORS DETECT CONCENTRATIONS

EXCEEDING 3 PPM (ADJ.) AN ALARM SHALL SOUND LOCALLY AND SHALL BE REPORTED THROUGH

THE FIRE ALARM CONTROL PANEL. TYPICAL.

LOCATE OUTSIDE AIR SENSOR FOR BMS SYSTEM IN PROTECTED LOCATION. PREFERRABLY IN

THE SHADE OF AN OVERHANG. ENSURE THAT SENSOR IS ACCESSIBLE FROM BELOW (BY LIFT OR

LADDER).

PROVIDE AN "EDWARDS SIGNALING" 95 SERIES (OR SIMILAR) ADAPTABEACON LIGHT DUTY

STROBE WITH 85 dB AUDIBLE/VISUAL SIGNAL ALARM TO BE ACTIVATED IF HANGAR DOORS ARE

OPEN FOR LONGER THAN 10 MINUTES AND HEATERS HAVE BEEN ACTIVATED DUE TO LOW

HANGAR TEMPERATURE. ALARM SHALL SOUND AND STROBE UNTIL HANGAR DOORS ARE

CLOSED. MOUNT IN A LOCATION VISIBLE FROM MOST LOCATIONS IN THE HANGAR AND 10 FEET

ABOVE THE FLOOR.

PROVIDE A LASER BREAK BEAM SENSOR THAT SHALL BE MOUNTED 40 FEET AFF (INTENT IS TO

DETECT THE TAIL OF THE PLANE BUT NO OTHER OBJECTS SUCH AS VECHILES). THE BREAK

BEAM SENSOR SHALL BE SUITABLE TO VIEW ACCURATELY ACROSS THE HANGAR AND SHALL

HAVE THE CAPABILITY OF PROVIDING A BINARY SIGNAL TO THE BMS SYSTEM. LOCATE BEAM

SENSOR SUCH THAT IT WILL NOT BE ACCIDENTLY TRIPPED BY OTHER HANGAR EQUIPMENT

SUCH AS FANS. PROVIDE THE COMPANION RECEIVER ON THE OPPOSITE SIDE OF THE HANGAR

AND ALIGN THE LASER SUCH THAT IT HITS THE RECEIVER TARGET.

UPON A SIGNAL FROM THE FIRE ALARM SYSTEM ALL MECHANICAL AIR MOVING SYSTEM SERVING

THE HANGAR SHALL SHUT DOWN, INCLUDING BUT NOT LIMITED TO CIRCULATION FANS,

RADIANT HEATERS, HEATING AND VENTILATION UNITS, AND MAINTENANCE FANS. TYPICAL.

1006210771C Rectangle

1006210771C Callout Room 129

1006210771C

Despatch Oven will not be installed in Room 129

9'

D'

E'

F'

G'

C'

B'

A'

10' 12' 14' 15'

A

4 5 6

13'

"x

"x

"x

4950L-15

"x

12"x12"

12"x14"47 "x

36"x10"

36"x10"

FCU-253-4

FCU-253-5

FCU-253-2

VAV-1-2

VAV-1-3

VAV-1-4

B-3 B-2

B-1

HWP-3 HWP-2 HWP-1

M-301

20"x14"

20"x14"

16"ø16"ø

"ø

635SRC

18"x10"

635SRC

18"x10"

ERH-5

1500L-18

HVU-3

CF-3

12"x12" 10"x8"

12"x10"

12"x8"

"ø

AS-1

54"ø

48"x36"

345CDD 345CDD

M-401

CLEARANCES TYPICAL

M

M M

M A

T C

H

LI

N E

C O

N T

IN

U

E D

O N

S H

E E

T M

-1

MATCHLINE

CONTINUED ON

SHEET M-104

EQUIPMENT

PLATFORM

MECHANICAL

COMPOSITE

SHOP

PREP

ROOM

SANDING

DIRTY

M

VFD-1

VFD-2

VFD-3

ET-1

14"ø

14"ø

14"ø

14"ø

HVU-4

EF-22

CF-5

8"ø

635SRC

18"x10"

635SRC

18"x10"

M

EF-23

20"x20"

"x

20"x20"

MAU-1

"ø

6"ø

1318"x20"

"x

440CDE440CDE

6"ø

VAV-2-1

10"x8"

VAV-2-2

VAV-2-3

12"x12"

36"x34"

"x

"x

"x

"ø

12"x10"

12"x8"

6"ø

"ø

4"ø

12"x12" BELOW

"ø

"ø

"ø

"ø

8"ø

6"ø

5"ø

SSU-1

GFU-1

EF-19

M-402

M

20"x22"

54"x54"

20"x20"

22"x20"

22"ø

8"ø

8"ø

M-303

M-303

M M

M

SE

STORAGE

HVU-5

18"x18" 18"x18"

SF-3

BOB: 34' AFF

31' 2" AFF

18' 4" AFF

BOD: 25' - 3"

B O

D

BOD: 28' - 11"

BOD: 26' - 10"

BOD: 36' - 9"

BOD: 35' - 7"

BOD: 34' - 2"

BOD: 27' - 9"

BOD: 21' - 3"

BOD: 31' - 11"

BOB: 23' 9" AFF

IWH-1

3"ø

"ø

BOD: 23' - 6"

BOD: 21' - 10"

BOD: 25' - 9"BOD: 19' - 0"

ERH-8

18"x16"

"x

EF-25

BOD: 34' - 6"

BOD: 34' - 6"

8"ø 8"ø

DOAU-1

EF-26

16"x16" 400L-20

SF-4

400L-21

M

M

400SRC

RHC-2

10"ø

16"x16"

"x

500L-23

22"x14"

EF-18

7 7

M M

7 7

HR-10

HR-11

M M

HR-8

HR-9

12"ø

16"x16"

16"x16"

H-1

H-1

M

H-2

M

BOD: 20' - 5"

AC-4

AC-3

"ø

20"ø

20"ø H-2

27 36"x24" 36"x24"

8"ø

12"x12"

13853L-12A

13853L-12C

13853L-12B

12750L-14B

12750L-14A

TYP

8' MIN

TYP

3' MIN

690RGD

880RGD

48"ø

B O

D

BOD: 16' - 10"

16"ø

18"ø

50"ø

M-302

AC-2

"ø

10"ø

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ P e as e A

F B

H a ng ar s\ D ra w in gs

\A ut oC A

D R ef er en ce

S

Z C

Q

-G -B

S A

R C

1.

dw g g ue ck er

AS SHOWN

Stamp

M-101

MECHANICAL HVAC CONCRETE DECK PLAN

09 APRIL 2015

MJG

MEL/MJG

RAC

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/8" = 1'-0"

CONCRETE DECK LEVEL

0' 2' 4' 8' 16' 24'TRUE

NORTH

KEY PLAN

SCALE: N.T.S.KP

KEY NOTES:

MOTORIZED OPEN/CLOSE DAMPERS . DAMPERS CONNECTED TO OUTSIDE (INTAKE OR EXHAUST) SHALL BE LOW LEAKAGE CLASS 1A TYPE, PARALLEL BLADE. ACTUATOR SHALL BE CAPABLE OF CLOSING THE DAMPER IN 10 SECONDS OR LESS.

CONNECT TO BAS SYSTEM. TYPICAL.

EXISTING RADIANT HEATERS TO REMAIN.

DUCT STATIC PRESSURE SENSOR

RELOCATED EXISTING RH AND ASSOCIATED EXISTING GAS TRAIN ASSEMBLIES.

14" DIAMETER DUCT DOWN TO 26'-5" AFF. TURN TO THE HORIZONTAL AND CONNECT INTO COILED FLEXIBLE HOSE. BALANCE

FOR 1000 CFM.

PAINT BOOTH EXHAUST DUCT SHALL BE ROUTED THROUGH EXTERIOR WALL DIRECTLY TO THE OUTSIDE. PROVIDE A

STAINLESS STEEL BIRD SCREEN AT THE DISCHARGE.

HOSE REEL FOR FUEL CELL PURGE. SEE SCHEDULES AND DETAILS.

SUPPORT MECHANICAL EQUIPMENT FROM CMU WALL. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL WALL STIFFENING

DETAILS. REFER TO "EQUIPMENT CANTILEVERED SUPPORT" DETAIL.

OPEN ENDED DUCT (OED) WITH WIRE MESH SCREEN (WMS).

AIR INTAKE CONNECTION SHALL BE MADE AT THIS LOCATION FOR CUSTOMER PROVIDED PAINT BOOTH MAKE-UP AIR UNIT (TO

BE PROVIDED BY OTHERS AS PART OF PAINT BOOTH PROCUREMENT).

EXHAUST PLENUM SHALL BE A MINIMUM OF 2 FEET DEEP. THE PAINT MIXING FUME HOOD EXHAUST SHALL DISCHARGE INTO THE TOP SECTION OF THE PLENUM AND THE GENERAL SPACE EXHAUST SHALL DISCHARGE INTO THE BOTTOM OF THE PLENUM.

EXHAUST AIR CONNECTION SHALL BE MADE AT THIS LOCATION FOR CUSTOMER PROVIDED PAINT BOOTH EXHAUST FAN (TO BE

PROVIDED BY OTHERS AS PART OF PAINT BOOTH PROCUREMENT).

DUCT DOWN TO FIRST FLOOR ELEVATIONS. REFER TO M-102 AND/OR M-401 FOR CONTINUATION.

BOILER COMBUSTION INTAKE: INCREASE TO ONE DUCT SIZE GREATER THAN THE BOILER CONNECTION. SLOPE HORIZONTAL DUCT AT 1/4" PER FOOT DOWNWARDS TOWARDS THE EXTERIOR WALL. ONCE DUCT HAS PENETRATED EXTERIOR WALL TURN DOWN WITH A LONG RADIUS ELBOW AND PROVIDE A STAINLESS STEEL BIRD SCREEN. INTAKE SHALL BE NO LESS THAN 4'-0" BELOW AND NO LESS THAN 3'-0" HORIZONTALLY FROM ANY BOILER FLUE EXHAUST TERMINATIONS. TYPICAL 3 PLACES.

BOILER EXHAUST: INCREASE TO ONE DUCT SIZE GREATER THAN THE BOILER CONNECTION. DUCT SHALL BE CONSTRUCTED OF STAINLESS STEEL. PENETRATE WALL WITH AN APPROVED WALL THIMBLE WITH AN AIR GAP BETWEEN FLUE AND WALL MATERIALS. EXHAUST SHALL TERMINATE NO LESS THAN 12" FROM EXTERIOR WALL SURFACE. PROVIDE A STAINLESS STEEL BIRD SCREEN. EXHAUST SHALL BE NO LESS THAN 4'-0" ABOVE AND NO LESS THAN 3'-0" HORIZONTALLY FROM ANY BOILER

COMBUSTION INTAKES. TYPICAL 3 PLACES.

CONTRACTOR SHALL CONNECT EXHAUST DUCTWORK AND TERMINATIONS TO NEW OVEN. PROVIDE NEW METAL-FAB IPIC-4 EXHAUST DUCT AND FITTINGS AS NECESSARY. INSTALL EXHAUST DUCT IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS. PROVIDE INSULATED WALL THIMBLE AND TERMINATE WITH STANDARD VENT CAP. MAINTAIN MIN 10'-0" ABOVE

GRADE. SEE DETAIL ON SHEET M-402.

DUCT DROP TO AVOID STRUCTURAL TRUSSES. CONTRACTOR SHALL COORDINATE ROUTING WITH EXISTING STRUCTURE AND

ALL TRADES. TYPICAL.

INTAKE PLENUM SHALL BE A MINIMUM OF 4' DEEP.

COMBINE 3" COMBUSTION AIR INTAKE AND 3" VENT INTO ONE PENETRATION THROUGH ROOF USING MANUFACTURER'S

PROVIDED CONCENTRIC ADAPTER.

EF-25 SHALL BE INTERLOCKED WITH HVU-5 AND SHALL OPERATE AT MINIMUM SPEED (450 CFM) WHENEVER HVU-5 OPERATES DURING OCCUPIED HOURS. IF TEMPERATURE IN SPACE EXCEEDS 85 DEGREES SF-3 SHALL ENERGIZE AND BLOW MORE VENTILATION/COOLING AIR INTO THE MECHANICAL ROOM AND THE EF-25 SHALL INCREASE SPEED TO MAXIMUM. SUPPLY AND EXHAUST FAN AND DAMPERS SHALL CLOSE ON A SIGNAL FROM THE EMERGENCY SHUTDOWN SWITCH.

HVU SHALL MAINTAIN A MINIMUM OF 60 DEGREES IN THE SPACE. DURING UNOCCUPIED HOURS THE OUTSIDE AIR DAMPER SHALL BE CLOSED AND THE RETURN AIR DAMPER SHALL BE OPEN. DURING OCCUPIED HOURS THE RETURN AIR DAMPER SHALL BE CLOSED AND THE OUTSIDE AIR DAMPER SHALL BE OPEN. DURING OCCUPIED HOURS THE HVU SHALL RUN CONTINUOUSLY AND THE HOT WATER VALVE SHALL MODULATE TO MAINTAIN TEMPERATURE AT SET POINT. HVU-5 SHALL DE-ENERGIZE AND ALL OUTSIDE AIR DAMPERS SHALL CLOSE ON A SIGNAL FROM THE EMERGENCY SHUTDOWN SWITCH.

TURN DOWN TIGHT TO WALL AND CONNECT INTO RESIN TABLE HOOD ON LEVEL BELOW. REFER TO M-102 FOR CONTINUATION.

TURN DUCT DOWN TO 12" BELOW THE FINISHED CEILING ELEVATION. CONNECT INTO A WALL MOUNTED SUPPLY REGISTER.

PROVIDE MOTORIZED DAMPERS THAT ARE CONNECTED TO EACH OF THE TWO HOSE REELS/BRANCH DUCT CONNECTIONS ASSOCIATED WITH THE FAN OR AC UNIT. THE MOTORIZED DAMPERS SHALL BE NORMALLY OPEN AND THE OPERATOR SELECTOR SWITCH SHALL CLOSE THE DAMPER OF THE HOSE REEL/BRANCH DUCT THAT THE OPERATOR DOES NOT WISH TO USE (OR BOTH CAN BE OPEN). THE MOTORIZED DAMPERS SHALL BE POWERED THROUGH THE EXHAUST FAN OR AC UNIT SWITCH SUCH THAT IF THE EXHAUST FAN IS TURNED OFF THE DAMPERS SHALL SPRING TO OPEN.

BOTTOM TAP HVU SUPPLY DUCTWORK AND ROUTE TO INLET OF AC-3 AND AC-4

PLACE AC-3 AND AC-4 ON 6" CONCRETE HOUSEKEEPING PAD ON MEZZANINE CONCRETE DECK.

MOUNT HUMIDIFIER STEAM GENERATOR/CONTROL PANEL SUCH THAT THE CENTER OF THE CONTROL PANEL IS 48" ABOVE THE FINISHED FLOOR. STEAM PIPING SHALL BE ROUTED UP TO STEAM DISPERSION ASSEMBLY LOCATED IN THE SUPPLY

DUCTWORK OF AC-3 OR AC-4. REFER TO PIPING PLANS FOR STEAM AND DRAIN PIPING.

PLAN

NORTH

1 RFI 90 - TRENCH EXHAUST 4/7/2016

2 SUBMITTAL 187 - LOUVER ADJUSTMENT 6/17/2016

3 RFI 203 - RETURN DIFFUSERS 5/8/2017

4 RFI 165 - ELECTRICAL HUMIDIFIERS 5/8/2017

5 REV FOR CCOR 253-032 11/20/2018

10" Ø OUTDOOR AIR DUCT SHALL BE CONNECTED TO LOUVER INTAKE PLENUM BOX.

10" Ø OUTDOOR AIR DUCT ROUTED DOWN TO SUCTION INTAKE ON BREATHING AIR COMPRESSOR AC-2. DUCT SHALL TRANSITION TO RECTANGULAR SIZE (10"X12") AT COMPRESSOR INTAKE AND SHALL BE SEALED AT CONNECTION. SEE SECTION ON SHEET M-302 FOR

DETAILS.

6 AIR COMPRESSOR REVISION 5/3/2019

1006210771C Rectangle

1006210771C

1006210771C Callout Despatch Oven will not be installed at Room 129

1006210771C

10" Diameter exhaust duct is INSTALLED at north wall (unused)

1006210771C

1006210771C

Rejected

1006210771C Callout Despatch Oven will not be installed in Room 129

1006210771C

10" Dia Exhaust Duct Installed (unused)

8' 9'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2' 13' 4'

P-402

WASH

ROOM

COMPOSITE

SHOP

PREP

ROOM

COMPRESSED

AIR

AIRLOCK

SANDING

(DIRTY)

CTK

STRUCTURAL

OFFICE

142PAINT

MIXING

PAINT

STOR

COMMUNICATIONS

SE

STORAGE

P-401

P7

FPH

FPH

FPH

CA CA

CA

CA

W

CA

CA

W

W W

P10

P11

/4 "ø

C A

/4 "ø

C A

1 1/4"ø CA 1 1/4"ø CA

/2 "ø

C A

/2 "ø

C A

2 1/2"ø CA2 1/2"ø CA2 1/2"ø CA

IWH-2

IWH-1

IWH-3

CA

BA

BA

BA

BA

BA

BA

1"ø CA BA

2"ø CA BA

2 1/2"ø CA

2" ø

C A

B A

1" ø

C A

B A

1" ø

C A

B A

2"ø CA BA2"ø CA BA

1"ø CA BA

2" ø

C A

B A

2"ø CA BA

2"ø CA BA

2"ø CA BA

CA

BA CA

CABA

CABA

CA

P10

IWH-3

W

1 1/2"ø CW @ 100 PSI

/4 "ø

C W

3"ø CW

/2 "ø

C W

2 1/2"ø CW

1"ø CA BA

1 1/4"ø CA

2 1/2"ø CW

/2 "ø

C W

3/4"ø CW

/2 "ø

C W

2 1/2"ø CW 2 1/2"ø CW

2"ø CA BA

2" ø

C A

B A

/2 "ø

C A

2"ø CA 2"ø CA BA 2"ø CA

2"ø CA BA 1 1/2"ø CA

1 1/2"ø CA BA 2 1/2"ø CA

1 1/4"ø CA 1"ø CA 1"ø CA BA

2 1/2"ø CA

2 1/2"ø CA

WD

WD

2 1/2"ø CW

4"ø G 5 PSI

4"ø G 5 PSI

4" ø

G

6"ø G

6"ø G6"ø G6"ø G6"ø G 6"ø G 2 PSI

ERH-8

ERH-7

ERH-6

2 1/2"ø G 1 1/4"ø G 1"ø G1 1/4"ø G

/2 "ø

G

/2

"ø G

1" ø

G

1"ø G

1" ø

G 1" ø G

1" ø

G

IWH-1 IWH-1

IWH-1

GRIEVE

OVEN

5 PSI TO 2 PSI REGULATOR

P-502

P-502

P-502

P-502

P-502

P-502

P-502

P-502

P-502

P-502

P-502 1

P-502

P-502

P-502

P-502

P-502

P-502

P-502

1-1/2" G UP (REFER TO P-403/

ENLARGED MEZZANINE

PLAN FOR CONTINUATION)

1-1/4" UP

4" G @ 5 PSI UP TIGHT

TO STRUCTURE

IWH- 1 TO BE MOUNTED

TO STRUCTURE ABOVE.

(TYPICAL OF 3)

2 1/2"ø CA

REFER TO P-403/

ENLARGED MEZZANINE

PLAN FOR CONTINUATION

1"ø CW @ 100 PSI 1 1/4"ø CW @ 100 PSI

1 1/4"ø CW @ 100 PSI

1"ø CW @ 100 PSI

1" ø

C W

P

S I

1"ø CW @ 100 PSI

2" CW UP TO PWP-1, 2" CW @ 100

PSI DOWN AND 1-1/4" CA (REFER

TO P-403/ ENLARGED MEZZANINE

PLAN FOR CONTINUATION)

P-404

CABA

CABA

1" ø

C A

B A

1" ø

C

ACA 3

P-502

CA

P-502

P-502

W

1-1/2" CW, HW, AND 3/4"

RECIRC. TO MECHANICAL

MEZZANINE

1 1/2"ø HW 3/4"ø HWR

3/

"ø H

W R

/2 "ø

H W

1 1/2"ø HW 3/4"ø HWR 3/4"ø HWR

1 1/2"ø HW

3/

"ø H

W

1" @ 2 PSI TO GWH-1

(REFER TO P-404/ ENLARGED

EXISTING PLUMBING MEZZANINE

PLAN FOR CONTINUATION)

CTK

FUELS

SUPERVISOR

104A

STORAGE

103A

FUEL

SYSTEMS

P-503

HEF

105A

STORAGE

CORRIDOR

MEN

LOCKER

MECHANICAL

112 MEN

RESTROOM

LAUNDRY

109B

VESTIBULE

JANITOR

109A

WOMEN

RESTROOM

WOMEN

LOCKER

108A

CORRIDOR

103B

CORRIDOR

WARP

STORAGE

MECHANICAL

INVERTER

STORAGE

P-503

P-503

P-503 1

P-503

P-503

2 1/2"ø CA

1" CA UP (REFER TO

P-403/ ENLARGED

MEZZANINE PLAN

FOR CONTINUATION)

1" CA UP (REFER TO P-403/

ENLARGED MEZZANINE

PLAN FOR CONTINUATION)

1/2" IWH-1 CONDENSATE ROUTED TO

MEZZENINE FLOOR DRAIN(REFER TO

P-403/ ENLARGED MEZZANINE PLAN

FOR CONTINUATION)

1/2"ø CONDENSATE 1/2"ø CONDENSATE 1/2"ø CONDENSATE

P-503

P-503

P-503

P-503

P-503

P-504

1" UP

P-504

1/2" CA DOWN TO

PNEUMATIC FLOW

CONTROL MANIFOLD

2-1/2" GAS TO

PAINT BOOTH

MAKE-UP AIR

UNIT

EXISTING EMERGENCY SHOWER

/EYEWASH AND ASSOCIATED

PIPING TO BE REMOVED.

CONTRACTOR TO PATCH AND

SEAL WALLS TO MATCH.

HANGAR

EXISTING

GRIEVE

OVEN

1"ø G 5 PSI

MEZZANINE

P-403 MEZZANINE

EXISTING BREATHING AIR

COMPRESSOR, AIR PURIFIER,

AND ACCESSORIES SHALL

REMOVED BY GOVERNMENT.

CONTRACTOR TO PATCH AND

SEAL WALLS TO MATCH.

3/4" DOWN WITH RPBP TO

HUMIDIFIER

3/4"ø CW

3/4" WITH RPBP TO

HUMIDIFIER

2 1/2"ø CA

CA & CWPIPING TO

MECHANICAL

MEZZANINE REFER

TO P-403 FOR

CONTINUATION

/2 "ø

C A

/2 "ø

C A

3/4"ø CW6" ø

G 6" ø G

2-1/2" CA DROP TO 4'-0" AFF

WITH DIRT LEG AND

HORIZONTAL VALVE AND

CAP FOR CONNECTION TO

JACKING MANIFOLD

(MANIFOLD BY OTHERS)

1-1/4" G

TO MAU-1

SYMBOL LEGEND

SYMBOL ABRV. DESCRIPTION

WATER DROP

COMPRESSED AIR DROP

W

CA

BREATHING AIR DROPBA

1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN

WASH OUT

WD

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ P e as e A

F B

H a ng ar s\ D ra w in gs

\A ut oC A

D R ef er en ce

S

Z C

Q

-G -B

S A

R C

1.

dw g g ue ck er

AS SHOWN

Stamp

P-101

PLUMBING PRESSURE PIPING NORTH FLOOR

PLAN

09 APRIL 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 3/32" = 1'-0"

PLUMBING PRESSURE PIPING NORTH FLOOR PLAN

0' 2' 4' 8' 16' 24'

KEY PLAN

SCALE: N.T.S.KP

TRUE

NORTH

PLAN

NORTH

1 AIR COMPRESSOR REVISION

3 REVISION 9/18/2018

4 REV FOR CCOR 253-032 11/20/2018

5/3/2019

5 B253 RFI 345 - IWH-1 & 3 4/2/2019

1006210771C Rectangle

1006210771C Callout Room 129

1006210771C

Grieve/Despacth Oven will not be installed in Room 129. All associated gas and air piping shown is INSTALLED.

8' 9'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2' 13' 4'

P-402

CORRIDOR

COMMUNICATIONS

WASH

ROOM

COMPOSITE

SHOP

COMPRESSED

AIR

PREP

ROOM

SANDING

(DIRTY)

PAINT

MIXING

PAINT

STOR

CTK

STRUCTURAL

OFFICE

SE

STORAGE

P10

P11

P7

TD2

SLOPED

WITH FLOOR

4"ø SS 6"ø SS

JACKING POINT

JACKING POINT

YCO

P-401

TD2

TD2TD2

TOP OF GRATE ELEVATION ~95.51'

INVERT AT BOTTOM OF TRENCH

~94.67'

TOP OF GRATE ELEVATION ~94.93'

INVERT AT BOTTOM OF TRENCH

~94.09''

TOP OF GRATE ELEVATION ~94.93

INVERT AT BOTTOM OF TRENCH

~94.09''

TRANSITION TO 6" PRIOR

TO EXITING FACILITY

SLOPED

WITH FLOOR

P10

FD2

FD2WCO

FCO

3"ø SS

3" ø

SS

3" ø

SS

2"ø

SS

3" VTR

CTK

FUELS

SUPERVISOR

104A

STORAGE

103A

FUEL

SYSTEMS

CONTRACTOR TO RECONNECT TO EXISTING

SANITARY SEWER SERVICE.

STORAGE

INVERTER

MECHANICAL

HEF

105A

STORAGE

WARP

STORAGE

MEN

RESTROOM

MEN

LOCKER

VESTIBULE

WOMEN

RESTROOM

LAUNDRY

109B

MECHANICAL

CORRIDOR

103BWOMEN

LOCKER

108A

FD-2

3" ø

SS

HANGAR

INVERT @ 87.5' REFER TO

CIVIL DRAWINGS FOR

CONTINUATION

PROVIDE MINIMUM OF 3'-0"

CLEARANCE FROM

EXISTING FOOTER

P-403 MEZZANINE

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

Au to ca d

Pr oj ec ts

\P ea se

AF

B H an ga rs \D ra w in gs

\A ut oC

AD

R ef er en ce

SZ

C

Q

-G -B

SA

R

C 1.

dw g gu ec ke r

AS SHOWN

Stamp

P-103

PLUMBING SANITARY SEWER NORTH FLOOR

PLAN

09 APRIL 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 3/32" = 1'-0"

SANITARY SEWER NORTH FLOOR PLAN1

0' 2' 4' 8' 16' 24'

KEY PLAN

SCALE: N.T.S.KP

TRUE

NORTH

PLAN

NORTH

1006210771C Rectangle

1006210771C

C'

B'

A'

10' 12' 14' 15'13'

B-3 B-2 B-1

ERH-5

/2 "ø

C A

4" ø

G

2" ø

C A

B A

4"ø G 3 1/2"ø G 3"ø G

2 1/2"ø CA

2"ø CA BA

2" ø

C A

B A

/2 "ø

C A

2 1/2"ø CA

1 1/4"ø CA

1"ø CA BA

1 1/2"ø CW @ 100 PSI

2"ø CA BA

/2 "ø

C A

1 1/4"ø CA

MECHANICAL

EQUIPMENT

PLATFORM

1" CA DOWN TO SE

STORAGE 129

1-1/2" G DOWN TO

GRIEVE IN

SE STORAGE 129

(OPEN TO BELOW)

SE STORAGE 129

2-1/2" G @ 2 PSI

DOWN TO BOILER

(TYPICAL OF 3)

1-1/4" CA BA DOWN (REFER TO

P-101 FOR CONTINUATION)

1-1/4" CA DOWN (REFER TO

P-101 FOR CONTINUATION)

2" CW UP & 2" CW @ 100 PSI

DOWN (REFER TO P-101 FOR

CONTINUATION)

2 1/2"ø CA

6"ø G

3" SS DOWN TO

BELOW 1ST

FLOOR SLAB

3"ø SS

3"ø SS3"ø SS

FD2 FD2

3" VTR

ALL SS PIPING ROUTED BELOW

CONCRETE FLOOR ABOVE 1ST

FLOOR CEILING.

PWP-1

2"ø CW @ 100 PSI

2"ø CW @ 100 PSI

2"ø CW

1" ø

C W

P

S I

1"ø CW @ 100 PSI

1" ø

C W

P

S I

1 1/4"ø CW @ 100 PSI

1" CA DOWN TO SE

STORAGE 129

1 1/2"ø G

1"ø CA

1" ø

C A

1/2"ø CONDENSATE

1/2" CONDENSATE FROM IWH-1

ROUTED DOWN WALL OVER TO

FD-2.

1/2"ø CONDENSATE

1/ 2" ø C

O N

D E

N S

A T

E

HANGAR

AC-2

500 GALLON

RECEIVER TANK

FOR AC-1

AIR

DRYER

FOR

AC-1

240 GALLON

RECEIVER TANK

FOR AC-2

FILTER

2-1/2" CA TO CA MAIN IN

COMPOSITE SHOP REFER TO

P-101 FOR CONTINUATION

2"ø CA BA 1 1/4"ø CA BA

ROUTE 1/2" CONDENSATE ALONG

FLOOR FROM AC-2 AND AIR DRYER

DOWN TO HUB DRAIN WITH AIR GAP

FITTING IN PAINT MIXING 124 BELOW

3/4" CW TO BOILER

MAKE0UP WATER REFER TO

P-101 FOR CONTINUATION

3/4" MAKE-UP

WATER TO BOILERSCLEARANCE INDICATED

BY HATCHED LINES

1/

"ø

1/2"ø

3/4"ø CW

3/

"ø C

W

/2 "ø

C A

4"ø G

AC-1

2"ø CA

2" ø

C A

PROVIDE 94"X60"

CONCRETE PAD FOR AC-1.

CONTRACTOR TO VERIFY

DIMENSIONS.

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ P e as e A

F B

H a ng ar s\ D ra w in gs

\A ut oC A

D R ef er en ce

S

Z C

Q

-G -B

S A

R C

1.

dw g g ue ck er

AS SHOWN

Stamp

P-403

PLUMBING ENLARGED PLANS

09 APRIL 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 1/4" = 1'-0"

ENLARGED EAST PLUMBING MEZZANINE PLAN

0' 1' 2' 4' 8'TRUE

NORTH

PLAN

NORTH

1 AIR COMPRESSOR REVISION

2 RFI 89 - RESTROOM SANITARY UPDATES 5/8/2017

3 REV FOR CCOR 253-032 11/20/2018

5/3/2019

1006210771C Rectangle

1006210771C

MARK DESCRIPTION

MANUFACTURER

OR APPROVED EQUAL MODEL

CONNECTIONS

NOTES

CW HW WASTE VENT

P1

WATER CLOSET, WALL MOUNTED H.C. (1.28 GPF)

WITH WATER POWERED FLUSH VALVE KOHLER K-4325 1" - 4" 2"

TOTO FLUSH VALVE: TET1N32#CP,

KOHLER SEAT: K-4731-SC

P2

WATER CLOSET, WALL MOUNTED, (1.28 GPF) WITH

WATER POWERED FLUSH VALVE KOHLER K-4325 1" - 4" 2"

TOTO FLUSH VALVE: TET1N32#CP,

KOHLER SEAT: K-4731-SC

P3

URINAL (0.125 GPF) WITH WATER POWERED FLUSH

VALVE KOHLER K-4904-ET 3/4" - 1-1/2" 1-1/2" TOTO FLUSH VALVE: TEU1UN12#CP

P4

COUNTER TOP LAVATORY, H.C. (0.12 GPC WITH 12

SECOND DURATION/ 0.6 GPM) WITH WATER

POWERED METERING FAUCET

KOHLER K-2196-1 1/2" 1/2" 1-1/2" 1-1/2" TOTO FAUCET: TEL5LI15#CP

P5

WALL MOUNTED LAVATORY, H.C. (0.12 GPC WITH 12

SECOND DURATION/ 0.6 GPM) WITH WATER

POWERED METERING FAUCET

KOHLER K-2007 1/2" 1/2" 1-1/2" 1-1/2" TOTO FAUCET: TEL5LI15#CP

P6 SHOWER, H.C. (1.5 GPM) - - 3/4" 3/4" 1-1/2" 1-1/2" DELTA FAUCET: T13220-H2O

P7 2 COMPARTMENT SINK ADVANCE TABCO 94-42-48-24RL 3/4" 3/4" 1-1/2" 1-1/2" ADVANCE TABCO FAUCET: K-11

P8 ELECTRIC WATER COOLER ELKAY EZS4 1/2" - 1-1/2" 1-1/2" -

P9 SERVICE SINK KOHLER K-6710 3/4" 3/4" 3" 1-1/2"

KOHLER FAUCET: K-8907, INCLUDE MOP

BRACKET AND HOSE

P10 EMERGENCY EYE/FACE WASH HAWS 7261-7271 - 1/2" 1-1/2" -

PROVIDE 1/2" TEPID WATER FROM MIXING

VALVE, NOTE 3

P11 EMERGENCY EYE/FACE WASH AND SHOWER COMBO HAWS 8330-8309 - 1-1/4' 1-1/2" -

PROVIDE 1-1/4" TEPID WATER FROM

MIXING VALVE, NOTE 3

FD1 FLOOR DRAIN ZURN ZN415B - - 3" 1-1/2" WITH TRAP GUARD

FD2 FLOOR DRAIN ZURN ZN550 - - 3" 1-1/2" WITH TRAP GUARD

TD1 4" SHOWER TRENCH DRAIN ZURN ZS880 - - 2" 1-1/2" WITH TRAP GUARD

TD2 MAIN HANGAR TRENCH DRAIN ZURN Z784 - - 8" - -

HB HOSE BIBB WILKINS 195-BFP-8 3/4" - - - WITH INTEGRAL VACUUM BREAKER

FPH FREEZE PROOF HYDRANT ZURN Z1300 3/4" - - - WITH INTEGRAL VACUUM BREAKER

WCO WALL CLEANOUT ZURN Z1441 - - - - -

FCO FLOOR CLEANOUT ZURN Z1400 - - - - -

YCO YARD CLEANOUT ZURN Z1400 - - - - -

HR-1 100' HOSE REEL, SPRING DRIVEN COXREEL EZ-SH4100 - - - - -

HR-2 100' BREATHING AIR HOSE REEL, SPRING DRIVEN COXREEL EZ-T-BLL-3100 - - - - -

RPBP REDUCED PRESSURE BACKFLOW PREVENTER ZURN MODEL 375 3" - - - -

HUB

DRAIN HUB DRAIN ZURN Z-211 2" - - - DEEP SEAL TRAP WITH AIR GAP FITTING

NOTES:

1. H.C. DENOTES HANDICAPPED, INSTALL PER ADA REQUIREMENTS.

2. PRODUCT BRANDS SHOWN ON DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY AND SHALL NOT BE CONSTRUED AS THE ONLY PRODUCT AVAILABLE. OTHER BRAND SELECTED SHALL

MEET THE PERFORMANCE AND MATERIAL SPECIFICATIONS OF PRODUCTS LISTED.

3. PROVIDE AUDIBLE AND VISUAL EMERGENCY ALARM SYSTEM HAWS MODEL 9001EXP CONNECTED TO FIRE ALARM SYSTEM.

MARK

AREA SERVED AND

APPROXIMATE LOCATION

MINIMUM

STORAGE

CAPACITY

(GAL.)

MINIMUM

RECOVERY

(GPH)

DISCHARGE

TEMP. °F

TEMP.

RISE °F

ELECTRICAL NATURAL GAS

MANUFACTURER/MODEL

TOTAL KW

VOLTS/

PHASE

NUMBER

OF

ELEMENTS

CFH PRESSURE FLUE SIZE

IWH-1

TEMPERED WASH

WATER N/A N/A 100° 35° N/A 120/1 N/A 250 11" W.C. 3" HUBBEL: GX250

IWH-2

EMERGENCY

EYE/FACE WASH AND

SHOWER

N/A N/A 100° 35° N/A 120/1 N/A 250 11" W.C. 3" HUBBEL: GX250

IWH-3

EMERGENCY

EYE/FACE WASH N/A N/A 85° 30° 16 277/1 N/A N/A N/A N/A EEMAX: EX160T2EE

GWH-1 FACILITIES 60 99 140° 55° N/A 120/1 N/A 120 14" WC 3" - 4" A.O. SMITH: BTH-120(A)

REMARKS:

1. INCLUDE MODBUS INTERFACE MODULE.

2. CONTRACTOR TO PROVIDE REGULATOR AT EACH GAS FIRED EQUIPMENT. REGULATOR TO SHALL BE SET AT 2 PSI TO

MANUFACTURED RECOMMENDED PRESSURE SETTING. PLEASE REFER TO DETAIL 4 ON P502 FOR INSTALLATION.

MARK MANUFACTURER / MODEL SERVICE TYPE GPM

HEAD

(FT.) PSI

NP SH

REQ'D

(FT.)

RPM

EFF.

ELECTRICAL

REMARKS

HP VOLTS HZ.

PWP-1

BELL & GOSSETT /

V2VDC6G50B1CK

POTABLE WATER TO

WASH SYSTEM

VARIABLE SPEED

PUMP PACKAGE 90 219.5 141 5.6 3500 71.4 10 460 3 60 -

MARK MANUFACTURER / MODEL GPM

TD

HEAD

IN FT.

ELECTRICAL

SERVING LOCATION REMARKS

HP V HZ

CP-1

GRUNDFOS /

UP-15-18SU 2 5 1/25 115 1 60 110° F RETURN MECH. RM -

MARK TYPE

MINIMUM

FREE AIR

DELIVERY

(CFM)

PRESSURE

(PSI)

ELECTRICAL TANK SIZE REFRIGERATED AIR DRYER

SERVES REMARKS

HP RPM VOLTS PHASE GAL LENGTH WIDTH HEIGHT TYPE KW CONDENSER

VOLT/

PHASE

AC-1

OIL FREE

ROTARY SCREW 186 125 50

TO

3,400 460 3 500 89" 54" 76"

AIR

COOLED 5.0 - 460/3

TOOL AIR

SYSTEM 1, 2, 4, 5, 6

AC-2

BREATHING AIR

COMPRESSOR 112 100 25 3791 460 3 240 95" 36" 76.5"

AIR

COOLED 2.1 - 460/3

BREATHING

AIR SYSTEM 2, 3, 4, 5, 6

REMARKS:

1. INGERSOLL RAND: H50A; WITH VARIABLE SPEED DRIVE, REFRIGERATED AIR DRYER: NVC200.

2. AIR COMPRESSOR SHALL HAVE A MINIMUM OF 3% IMPEDANCE SERIES REACTOR, PROVIDED BY AIR COMPRESSOR MANUFACTURER.

3. INGERSOLL RAND: UP6-25; 20 PSI DELIVERY AT BREATHING AIR DROPS; COMPRESSOR SHALL HAVE INTEGRAL AIR DRYER AND CO DETECTOR. AIR COMPRESSOR SHALL HAVE 4 STAGE FILTRATION SYSTEM FOR

BREATHING AIR BY MARTECH SERVICES MODEL:150-E SERIES. UPON ACTIVATION OF CO DETECTOR MNS SHALL RECEIVE MESSAGE TO DISCONTINUE USE OF SYSTEM AND SEND SIGNAL TO CENTRAL STATION.

4. AIR COMPRESSOR SHALL MEET UNITIL REBATE CRITERIA.

5. UNITS SHALL BE PACKAGE UNITS WITH ALL ACCESSORIES TO BE INSTALLED.

6. CONTRACTOR SHALL COMPLY WITH ALL MANUFACTURER'S INSTALLATION REQUIREMENTS.

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

A ut oc ad

P ro je ct s\ P e as e A

F B

H a ng ar s\ D ra w in gs

\A ut oC A

D R ef er en ce

S

Z C

Q

-G -B

S A

R C

1.

dw g g ue ck er

AS SHOWN

Stamp

P-601

PLUMBING SCHEDULES

09 APRIL 2015

JWM

JWM

DSB

DSB

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

2 BOTH RFI 15 - AIR REEL REVISION

5/8/2017

3 RFI 58 - INSTANT WATER HEATERS

5/8/2017

1 AIR COMPRESSOR REVISION 5/3/2019

M

M M

M

M

MM

M

M

M

M

M

D D

Z3 Z3

Z3

D

M

M

M

M

M M

M

M M

M M

M M

M M

M M

M

M

M

M

LV2

O S

O S

O S

Z33

LV

LV

LV

LV

LV

LV

M

M

OS OS

LV

8' 9'

D'

E'

F'

G'

C'

B'

A'

7'5' 10' 12' 14' 15'3'2'

1 7

A

2 3 4 5 6

13' 4'

REEXEX EXEXRE

EX

RE

REEX

RERE

RERE

D

DE

DE

DE

DE

DE

DE

B1

B1

B1E

D

DE

DDE

C1C1

C1 C1

D

DE

DE D D

B1E

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1E

B1

B1

B1E

B1 B1E

B1

B1

B1E

B1

B1E

B1

B1

B1

B1

B1

B1

B1

B1

CE

C

C

CE

C

C

EXEXEXEXEX

EXEXEX

EXEXEX

EXEXEX

EX

EX

EXEX

EX EX

EX EX

EX

EX

EX

EXEX

EX EX

DD

EX

EX

J J

X

X

X

X

X

X

X

X

SE

STORAGE

CORRIDOR

MEN

RESTROOM

CLEAN

MEN

LOCKER

CLEAN

WOMEN

RESTROOM

CLEAN

WOMEN

LOCKER

CLEAN

COMMUNICATIONS

CORRIDOR

PAINT

STOR

PAINT

MIXING

COMPOSITE

SHOP

PREP

ROOM

SANDING

(DIRTY)

CTK

STRUCTURAL

OFFICE

MEN

SHOWER

DIRTY

WOMEN

SHOWER

DIRTY

JANITOR

MEN

LOCKER

DIRTY

MEN

RESTROOM

DIRTY

WOMEN

RESTROOM

DIRTY

WOMEN

LOCKER

DIRTY

ALCOVE

134A

ALCOVE

135A

EX

EX

EX

EX

EX

EX

EX

EX

EX

16' A.F.F.(TYPICAL FOR RM 120)

17' A.F.F.(TYPICAL FOR RM 119,121,122)

AIRLOCK

12' A.F.F.

H G GH

D D D D

DDD

D D D

D

DD

D D D D

DDDD

DE

DE

DE

DE

HP-3:38 2#12,#12,3/4"C

HP-3:40

2#12,#12,3/4"C

HP:3:42

2#12,#12,3/4"C

J1

J1 J1

J1

J1

J1

J1

J1

J1

J1

X

HP-3

RELOCATED

HANGAR LIGHTING

CONTROL DEVICES

J1

J1

J1

2#12,#12,3/4"C

ECU LP-3 LP-4

J

J

J

LP-2:52

2#12,#12,3/4"C

HP-3:48

JJJ

OS

OS

7 7

26' A.F.F.(TYPICAL OF RM 129)

WALL MOUNT 10' A.F.F.

(TYPICAL OF 3)

RECEPTACLE

CONTACTOR

PANEL

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

Au to ca d

Pr oj ec ts

\P ea se

AF

B H an ga rs \D ra w in gs

\A ut oC

AD

R ef er en ce

SZ

C

Q

-G -B

SA

R

C 1.

dw g gu ec ke r

AS SHOWN

Stamp

E-102

PARTIAL LIGHTING FLOOR PLAN BASE BID

09 APRIL 2015

MGD

CMD

WAP

LDC

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

TRUE

NORTH

KEY PLAN

SCALE: N.T.S.KP

0' 2' 4' 8' 16' 24'SCALE: 3/32" = 1'-0"

NORTH HANGAR AND SUPPORT AREA LIGHTING PLAN BASE BID1

GENERAL NOTES:

A. PROVIDE 2 #12, #12 (GND), 3/4" CONDUIT AS

NECESSARY FOR RELOCATED LIGHT

FIXTURES.

B. SEE DETAILS ON SHEET E-501 FOR CABLING

AND CONDUIT REQUIREMENTS RELATED TO

FIXTURE CONTROLS. CONTRACTOR

RESPONSIBLE FOR PROVIDING CABLE AND

CONDUIT INDICATED ON DETAILS NOT

SPECIFICALLY SHOWN ON THIS DRAWING.

C. COORDINATE LOCATION OF ELECTRICAL

EQUIPMENT WITH MECHANICAL AND

PLUMBING CONTRACTOR. RELOCATE EQUIPMENT

UP TO FIVE FEET AS NEEDED TO MAINTAIN

CLEARANCES PER NEC.

KEYNOTES:

CIRCUIT NEW FIXTURES TO EXISTING LIGHTING CIRCUIT SERVING THE

ROOM. EXTEND 2#12,#12 (GND), 3/4" CONDUIT AS NECESSARY. THERE

SHALL BE A NET DECREASE IN ROOM LIGHTING LOAD DUE TO THE ENERGY

EFFICIENCY OF THE NEW FIXTURES. REMOVE LINE FOR EXISTING SWITCHING.

CONNECT TO CIRCUIT SERVING NOSE DOCK LIGHTS. EXTEND 2#12, #12 (GND),

3/4" CONDUIT AS NECESSARY.

PROVIDE SEAL OFFS ON CONDUITS AS REQUIRED.

ENCELIUM ENERGY CONTROL UNIT. CATALOG #ECU-100, SEE DETAIL 1, SHEET

E-501 FOR TAIL DOCK EXTENSION LIGHTING CONTROL. WALL MOUNT 45" A.F.F.

CIRCUIT TO PANEL LP-3:17 VIA 2 #12,1 #12(GND), 3/4"C.

PROVIDE CONNECTION TO LIGHTS ASSOCIATED WITH GOVERNMENT FURNISHED

EQUIPMENT.

LIGHTING RELAY PANEL FOR EXTERIOR LIGHTING CIRCUITS, SEE DETAIL 3/E-501.

PROVIDE OCCUPANCY SENSORS TO CONTROL NEW LIGHTS IN ROOM. PROVIDE

2#12,#12(GND),3/4" CONDUIT AS NECESSARY.

PLAN

NORTH

1006210771C Rectangle

1006210771C

Room 129 Lighting Plan

TV

J

J

J

C'

B'

A'

10' 12' 14' 15'

A

13'

48"/GFI

48"/GFI

48"/GFI

48"/GFI

48"/GFI

"/G

FI

E

HP-2

LP-2

LP-2A

60"

60"

CH/GFI

C H

/G

FI

"/G

FI

C H

/G

FI

C H

/G

FI

G

FI

"/G

FI

GFI

G

FI

2 2

SE

STORAGE

CORRIDOR

MEN

LOCKER

DIRTY

MEN

RESTROOM

DIRTY

MEN

SHOWER

DIRTY

WOMEN

SHOWER

DIRTY

WOMEN

LOCKER

DIRTY

WOMEN

RESTROOM

DIRTY

JANITOR

MEN

LOCKER

CLEAN

WOMEN

LOCKER

CLEAN

WOMEN

RESTROOM

CLEAN

ALCOVE

134A

CORRIDOR

ALCOVE

135A

MEN

RESTROOM

CLEAN

COMMUNICATIONS

PAINT

STOR

PAINT

MIXING

COMPOSITE

SHOP

CTK

STRUCTURAL

OFFICE

E

LP-2:17

2#12,#12,3/4"CLP-2:12,14

2#12,#12,3/4"C 30

VAV-1-1

DOOR

MOTOR

NF

HP-4:13,15,17

3#6,#10(GND),1"C

LP-2:28

2#12,#12,3/4"C

LP-2:26

2#12,#12,3/4"C

LP-2A:8

2#12,#12,3/4"C

LP-2:34

2#12,#12,3/4"C

LP-2:30

2#12,#12,3/4"C

LP-2:32

2#12,#12,3/4"C

LP-2:39

2#12,#12,3/4"C

LP-2:36

2#12,#12,3/4"C

48"

48"

LP-2:29

LP-2:33

LP-2:31

2#12,#12,3/4"C

(TYP. OF THIS ROOM)

LP-2:35

2#12,#12,3/4"C

-2

E-111

LP-2:2,4,6

3#12,#12,3/4"C1.5 M

FCU-253-1

SEE AUDIO/VISUAL DIAGRAM ON

SHEET E-503 FOR CABLING

REQUIREMENTS

LP-2:37

G

FI

G

FI

G

FI

G

FI

HP-4

NEW DESPATCH

OVEN

E

2#12,#12,3/4"C

COMMUNICATIONS

140E

LP-2:7,9

NF

LP-2A:2

LP-2A:4

LP-2A:12

LP-2A:10

LP-2A:9

AC-1

2#12,#12,3/4"C

4(TYP. OF 2) .

LP-2A:6

LP-2A:7

LP-2A:5

LP-2A:3

LP-2A:1

(TYP. OF 2) 3

2#12,#12,3/4"C

(TYP. OF TR 140)

(TYP. OF 4)

PEASE AIR BASE

NEW HAMPSHIRE

NATIONAL GUARD Project

Client

Drawing

NEW HAMPSHIRE AIR NATIONAL GUARD

REVISIONS

Description

Drawn by

Designed by

Scale

Date

Project No.

Approved by

Checked by Date

Sheet

N :\P ro je ct s\

Au to ca d

Pr oj ec ts

\P ea se

AF

B H an ga rs \D ra w in gs

\A ut oC

AD

R ef er en ce

SZ

C

Q

-G -B

SA

R

C 1.

dw g gu ec ke r

AS SHOWN

Stamp

E-111

SUPPORT AREA POWER AND SYSTEMS PLAN

09 APRIL 2015

MDG

CMD

WAP

LDC

SZCQ139901

KC-46A ADAL FUEL CELL HANGAR, BUILDING 253

PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE

SCALE: 3/16" = 1'-0"

SUPPORT AREA POWER AND SYSTEMS PLAN1

PLAN

NORTH

0' 1' 2' 4' 8' 12'

KEYNOTES:

RATED CLASS 1, DIVISION 1, PROVIDE SEAL OFFS AS REQUIRED.

MOUNT RECEPTACLE IN RECESSED BOX SIZED TO CONTAIN TOWEL DISPENSER'S

6V A/C POWER ADAPTER.

FLOOR MOUNTED RACK (19" WIDE BY 84" TALL) WITH PATCH PANELS

FOR TERMINATIONS.

PLYWOOD BACK BOARD.

RECEPTACLES SHALL BE CEILING MOUNTED, CENTERED OVER COMMUNICATION

RACK.

PROVIDE BACKBONE CABLING FROM TR 140 TO EXISTING TELECOMMUNICATIONS

EQUIPMENT LOCATED UNDER STAIRS BY ROOM 108, SEE SHEET E-108.

TELECOMMUNICATIONS GROUNDING BAR.

WALL PHONE, 48". 1 CAT 6 RJ-45 TELEPHONE DROP. SEE DETAIL 6/E-503.

TELEPHONE/DATA 18" U.O.N. 4 CAT 6 RJ-45 DATA DROPS. SEE DETAIL 6/E-503.

NOT USED.

12"x4" LADDER TYPE CABLE TRAY 9'-0" A.F.F.

JUNCTION BOX FOR SUPPORT AREA TELE/COMM CABLING. SEE DETAIL 6/E-503

FOR CONDUIT REQUIREMENTS.

JUNCTION BOX FOR COMPOSITE SHOP AREA TELE/COMM CABLING. SEE DETAIL

6/E-503 FOR CONDUIT REQUIREMENTS.

TO VAV-1-2, VAV-1-3, VAV-1-4, VAV-2-1, VAV-2-2, VAV-2-3, VAV-2-4, SEE SHEET E-110.

KEY PLAN

SCALE: N.T.S.KP

SCALE: 1/4" = 1'-0"

ENLARGED TR 1402 0' 1' 2' 4' 8'

PLAN

NORTH

TRUE

NORTH

TRUE

NORTH

1006210771C Rejected

1006210771C Callout Despatch Oven will not be installed at Room 129

1006210771C Rectangle

1006210771C Rectangle

1006210771C Line

1006210771C

Electrical panels actual installation location along west wall of Room 129

B253_AE-101
B253_AE-106
B253_AE-201
B253_AE-301
B253_FP-102
B253_LS-101
B253_M-100
B253_M-101
B253_M-102
B253_M-105
B253_M-106
B253_M-402
B253_P-101
B253_P-103
B253_P-403
B253_P-601
B253_E-102
B253_E-107
B253_E-111
B253_E-601
B253_E-602
B253_E-603

File details come from the government source that posted it. Updated .