Appendix A - Hangar 253 Building Plans.pdf
PDF 14 MB Posted
- Attached to
- Paint Booth
- Solicitation number
- W50S8A20Q0005
About this file
This sources sought notice seeks capability statements from interested parties to provide a paint booth and installation services on-site at Pease Air National Guard Base. The New Hampshire Air National Guard requires a commercial off-the-shelf paint booth under CLIN 0001 and installation services under CLIN 0002. Respondents should provide pricing, lead time, product origin, details on fire suppression systems, confirmation of sufficient compressed air supply, and indicate if they are a prime contractor or subcontractor. The notice specifies information required in capability statements, including organization details, size standard, and NAICS codes. Based on responses, the requirement may be set aside for small businesses or procured through full and open competition with potential for multiple awards. Responses are due by email to the specified contracting officer and specialist by the stated deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Paint Booth Statement of Work Rev5.pdf | ||
| Appendix C - NHDES Air Permit Application.doc | DOC document | |
| Appendix E - FP Hydraulic Calc Revisions.pdf | ||
| Appendix B - Summary of Available Utilities within Hangar 253.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
F
F
F F
FFF
F
F
F
F
FF
F
F
AE-201
AE-201
AE-202
AE-202
8' 9'
D'
E'
F'
G'
C'
B'
A'
7'5' 10' 12' 14' 15'3'2'
AE-301
193'-1"
NEW SINK
1 7
B
A
C
D
E
F
G
H
J
2 3 4 5 6
AE-302
31'-6" 31'-6" 31'-6" 31'-6" 31'-6" 31'-6"
HANGAR
COMPOSITE SHOP
AIRLOCK
PREP ROOM
SANDING (DIRTY)
CTK
STRUCTURAL OFFICE
AE-302
AE-301
PAINT MIXING
PAINT STOR
SE STORAGE
COMPRESSED AIR
143A B C
COMMUNICATIONS
MEN LOCKER DIRTY
MEN RESTROOM
DIRTY
MEN SHOWER DIRTY
JANITOR
WOMEN LOCKER
DIRTY
WOMEN SHOWER
DIRTY
WOMEN RESTROOM
DIRTY
WOMEN LOCKER
CLEAN
MEN LOCKER CLEAN
MEN RESTROOM
CLEAN
WOMEN RESTROOM
CLEAN
AE-104
AE-105
HEF ROOM
104A
103A 104 102
110112
AE-304
AE-304
AE-305
189'-0"
AE-306
AE-501
AE-102
13'4'
AE-501
OPP
KEYNOTES
1 KC-46 AIRCRAFT
2 KC-46 AIRCRAFT REQUIRED CLEARANCE
3 KC-135 AIRCRAFT
4 KC-135 AIRCRAFT REQUIRED CLEARANCE
5 REPLACE GYPSUM WALL BOARD INSIDE STAIR
TOWER AND EFFECTED AREA IN MECHANICAL
MEZZANINE.
6 EXISTING OVERHEAD DOOR TO REMAIN
7 16"X16" AIR HOSE ACCESS DOOR
8 TRENCH DRAIN, RE: PLUMBING
9 STEEL BOLLARDS RE: DETAIL 4/AE511.
PAINT YELLOW
AE-307
AE-303
AE-103
PLAN
NORTH
TRUE
NORTH
SCALE: 1/16" = 1'-0"
FLOOR PLAN
0' 4' 8' 16' 32'
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by No. Date
SheetAS SHOWN
Stamp
AE-101
OVERALL FLOOR PLAN
09 APRIL 2015
G UECKER
B BRADDICK
R WENTE
Q REMY
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
1006210771C Rectangle
1006210771C Callout Room 129 Approximate Paint Booth Location
1006210771C Rectangle
1006210771C Rectangle
1006210771C Callout Main Electrical Room
1 2 3A B
1006210771C Rectangle
1006210771C Rectangle
1006210771C Callout Room 129 South Elevation
1006210771C Callout Room 129 East Elevation
1006210771C
10" Dia Exhaust Duct (Unused)
1-888-640-4297
FINISHED FLOOR
0'-0"
8'9' 7' 5'10'12'14'15' 3' 2'
AE-301
17 234562
AE-302
MEN LOCKER CLEAN
MEN RESTROOM
CLEAN
COMMUNICATIONS
102 104 104A
AE-304
AE-305
AE-306
EQUIPMENT PLATFORM
15'-4"
13'
1 2
9 9
SE STORAGE
EQUIPMENT PLATFORM
MECHANICAL
FINISHED FLOOR
0'-0"
D'E'F'G' C' B' A'
NEW HANGAR TAIL DOCKEXISTING HANGAR
2 3/4" / 1'-0"
1'- 2"
/ 1 '-0
BA C D E F G H J
AE-302
TOP OF MID. DOOR OPENING
60'-0"
AE-301
1/2" / 1'-0"
AE-304
EQUIPMENT PLATFORM
15'-4"
MULLION CLEAR HEIGHT
30'-0"
AE-307
AE-503
AE-503
AE-502
AE-503
AE-502
AE-504
0' 4' 8' 16' 32'
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by No. Date
SheetAS SHOWN
Stamp
AE-301
BUILDING SECTION
09 APRIL 2015
G UECKER
B BRADDICK
R WENTE
Q REMY
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 1/16" = 1'-0"
HANGAR SECTION
SCALE: 1/16" = 1'-0"
HANGAR SECTION
KEYNOTES
1 KC-46 AIRCRAFT
2 KC-46 AIRCRAFT REQUIRED CLEARANCE
3 DUCTWORK RE: MECHANICAL
4 INSULATION CORE WALL PANEL R-26 MINIMUM
5 EMERGENCY EYEWASH/SHOWER STATION
6 3 PANEL VERTICAL LIFT FABRIC DOOR
7 STEEL CROSS BRACING RE: STRUCTURE
8 LIGHTNING ROD RE: ELECTRICAL
9 SNOW/ICE GUARD RE: SPECS
10 INSULATED TRANSLUCENT SANDWICH PANEL
DAYLIGHTING SYSTEM RE: SPECS RE: AE-510
11 10" X 10" X 1/4" TUBE STEEL DOWNSPOUT PAINT
TO MATCH ADJACENT SURFACE
12 EQUIPMENT PLATFORM ACCESS LADDER
13 NOT USED
14 UPPER INSULATION CORE WALL PANEL FROM MRF.
COLORS TO MATCH SHERWIN WILLIAMS SW6115 -
TOTALLY TAN
15 PRE FINISHED METAL TRANSITION FLASHING TO
MATCH SHERWIN WILLIAMS SW6069 - JUTE BROWN
16 LOWER INSULATION CORE WALL PANEL FROM MRF.
COLORS TO MATCH SHERWIN WILLIAMS SW6096 -
JUTE BROWN
1006210771C Rectangle
1006210771C
Room 129 Building Section
Rectangle
1006210771C
Room 129
F
F
F
F F
FFF
F
F
F
F
FF
F
F
F
F
F
1006210771C Rectangle
1006210771C
8' 9'
D'
E'
F'
G'
C'
B'
A'
7'5' 10' 12' 14' 15'3'2'
1 7
B
A
C
D
E
F
G
H
J
2 3 4 5 6
13' 4'
ACCU-253-2
ACCU-253-1
UH-1
ERH-8
EF-19
HVU-1HVU-2
ERH-7
MAU-1
FCU-253-4
FCU-253-5
EF-23
FCU-253-2
ERH-5
CF-3
FCU-253-1
FH-1
FCU-253-3
B-3 B-2
B-1
EF-22
CF-5
HVU-4
HVU-3
DOAU-1
VFD-2 VFD-1
VFD-3
EF-24
EF-14
EF-11
EF-5
EF-20
ERH-3
ERH-4
ERH-2
ERH-1
EF-21
CF-4
ERH-6
CF-1 CF-2
RH-4
RH-3RH-2
RH-1
EF-15
EF-6
EF-7
EF-8
EF-10
EF-12
EF-13
EF-4
EF-2
EF-1
EF-16
CTK
FUEL
SYSTEMS
WASH
ROOM
HANGAR
COMPOSITE
SHOP
PREP
ROOM
SANDING
(DIRTY)
SE
STORAGE
MEN
RESTROOM
CLEAN
WOMEN
RESTROOM
CLEAN
COMMUNICATIONS
COMPRESSED
AIR
CCU-253-2
CCU-253-3
FCU-253-6
ACCU-253-4 ACCU-253-3
HEF
105A
STORAGE
WARP
STORAGE
CORRIDOR
103B
WOMEN
LOCKER
108A
WOMEN
RESTROOM
VESTIBULE
LAUNDRY
109B
MEN
RESTROOM
MECHANICAL
MEN
LOCKER
CORRIDOR
FUELS
SUPERVISOR
104A
STORAGE
103A
HWP-5
HWP-4
HWP-6 HWP-7
CO
CO
CO
CO
CO
CO
CO
AC-2
CO CO
HR-3
HR-1 HR-2
HANGAR
SF-3
HVU-5
AC-1
EF-25
HWP-3 HWP-2
HWP-1
ET-1
DIZ-T-5'-7'
DIZ-T-8'-9'
DIZ-T-9'-10'
DIZ-T-11'-12'
EF-17
NO2
NO2
NO2
NO2
NO2
NO2
NO2
NO2
EF-18
ACCU-253-5
EXISTING
OVEN
HR-6 HR-7
HR-4HR-5 HR-9 HR-8
HR-10HR-11
EF-26
DESPATCH
OVEN
SF-4
ACCU-253-6
H-1
H-2
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
Au to ca d
Pr oj ec ts
\P ea se
AF
B H an ga rs \D ra w in gs
\A ut oC
AD
R ef er en ce
SZ
C
Q
-G -B
SA
R
C 1.
dw g gu ec ke r
AS SHOWN
Stamp
M-100
OVERALL MECHANICAL HVAC FLOOR PLAN
09 APRIL 2015
MJG
MEL/MJG
RAC
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 1/16" = 1'-0"
OVERALL MECHANICAL HVAC FLOOR PLAN1
0' 4' 8' 16' 32'TRUE
NORTH
PLAN
NORTH
KEYED NOTES:
PROVIDE CARBON MONOXIDE DETECTORS SIMILAR TO "HONEYWELL E3POINT E3SB" SERIES WITH
E3SCO CO DETECTION CARTRIDGE. THE DETECTORS SHALL BE CAPABLE OF COMMUNICATING
WITH THE DDC BAS SYSTEM. DETECTOR SHALL BE PROVIDED WITH A HEAVY DUTY HINGED
ENCLOSURE AND SENSOR END OF LIFE INDICATION. THE CO DETECTOR SHALL HAVE A
MEASUREMENT RANGE OF 0-200 PPM. THE INITIAL SETTING SHALL BE 20 PPM. (ADJ.) MOUNT CO DETECTORS 5'-0" AFF. CO DETECTORS SHALL BE NO MORE THAN 80' STRAIGHT LINE DISTANCE
FROM EACH OTHER OR 40'-0" FROM THE TAIL OR NOSE ENDS OF THE HANGAR. ENTIRE
PERIMETER OF HANGAR SHALL BE COVERED. IF SENSORS DETECT CONCENTRATIONS
EXCEEDING 50 PPM (ADJ.) AN ALARM SHALL SOUND LOCALLY AND SHALL BE REPORTED
THROUGH THE FIRE ALARM CONTROL PANEL. TYPICAL.
PROVIDE NITROGEN DIOXIDE DETECTORS SIMILAR TO "HONEYWELL E3POINT E3SB" SERIES WITH
E3NO2 NO2 DETECTION CARTRIDGE. THE DETECTORS SHALL BE CAPABLE OF COMMUNICATING
WITH THE DDC BAS SYSTEM. DETECTOR SHALL BE PROVIDED WITH A HEAVY DUTY HINGED
ENCLOSURE AND SENSOR END OF LIFE INDICATION. THE NO2 DETECTOR SHALL HAVE A
MEASUREMENT RANGE OF 0-10 PPM. THE INITIAL SETTING SHALL BE 1 PPM. (ADJ.) MOUNT NO2 DETECTORS 5'-0" AFF. NO2 DETECTORS SHALL BE NO MORE THAN 80' STRAIGHT LINE DISTANCE
FROM EACH OTHER OR 40'-0" FROM THE TAIL OR NOSE ENDS OF THE HANGAR. ENTIRE
PERIMETER OF HANGAR SHALL BE COVERED. IF SENSORS DETECT CONCENTRATIONS
EXCEEDING 3 PPM (ADJ.) AN ALARM SHALL SOUND LOCALLY AND SHALL BE REPORTED THROUGH
THE FIRE ALARM CONTROL PANEL. TYPICAL.
LOCATE OUTSIDE AIR SENSOR FOR BMS SYSTEM IN PROTECTED LOCATION. PREFERRABLY IN
THE SHADE OF AN OVERHANG. ENSURE THAT SENSOR IS ACCESSIBLE FROM BELOW (BY LIFT OR
LADDER).
PROVIDE AN "EDWARDS SIGNALING" 95 SERIES (OR SIMILAR) ADAPTABEACON LIGHT DUTY
STROBE WITH 85 dB AUDIBLE/VISUAL SIGNAL ALARM TO BE ACTIVATED IF HANGAR DOORS ARE
OPEN FOR LONGER THAN 10 MINUTES AND HEATERS HAVE BEEN ACTIVATED DUE TO LOW
HANGAR TEMPERATURE. ALARM SHALL SOUND AND STROBE UNTIL HANGAR DOORS ARE
CLOSED. MOUNT IN A LOCATION VISIBLE FROM MOST LOCATIONS IN THE HANGAR AND 10 FEET
ABOVE THE FLOOR.
PROVIDE A LASER BREAK BEAM SENSOR THAT SHALL BE MOUNTED 40 FEET AFF (INTENT IS TO
DETECT THE TAIL OF THE PLANE BUT NO OTHER OBJECTS SUCH AS VECHILES). THE BREAK
BEAM SENSOR SHALL BE SUITABLE TO VIEW ACCURATELY ACROSS THE HANGAR AND SHALL
HAVE THE CAPABILITY OF PROVIDING A BINARY SIGNAL TO THE BMS SYSTEM. LOCATE BEAM
SENSOR SUCH THAT IT WILL NOT BE ACCIDENTLY TRIPPED BY OTHER HANGAR EQUIPMENT
SUCH AS FANS. PROVIDE THE COMPANION RECEIVER ON THE OPPOSITE SIDE OF THE HANGAR
AND ALIGN THE LASER SUCH THAT IT HITS THE RECEIVER TARGET.
UPON A SIGNAL FROM THE FIRE ALARM SYSTEM ALL MECHANICAL AIR MOVING SYSTEM SERVING
THE HANGAR SHALL SHUT DOWN, INCLUDING BUT NOT LIMITED TO CIRCULATION FANS,
RADIANT HEATERS, HEATING AND VENTILATION UNITS, AND MAINTENANCE FANS. TYPICAL.
1006210771C Rectangle
1006210771C Callout Room 129
1006210771C
Despatch Oven will not be installed in Room 129
9'
D'
E'
F'
G'
C'
B'
A'
10' 12' 14' 15'
A
4 5 6
13'
"x
"x
"x
4950L-15
"x
12"x12"
12"x14"47 "x
36"x10"
36"x10"
FCU-253-4
FCU-253-5
FCU-253-2
VAV-1-2
VAV-1-3
VAV-1-4
B-3 B-2
B-1
HWP-3 HWP-2 HWP-1
M-301
20"x14"
20"x14"
16"ø16"ø
"ø
635SRC
18"x10"
635SRC
18"x10"
ERH-5
1500L-18
HVU-3
CF-3
12"x12" 10"x8"
12"x10"
12"x8"
"ø
AS-1
54"ø
48"x36"
345CDD 345CDD
M-401
CLEARANCES TYPICAL
M
M M
M A
T C
H
LI
N E
C O
N T
IN
U
E D
O N
S H
E E
T M
-1
MATCHLINE
CONTINUED ON
SHEET M-104
EQUIPMENT
PLATFORM
MECHANICAL
COMPOSITE
SHOP
PREP
ROOM
SANDING
DIRTY
M
VFD-1
VFD-2
VFD-3
ET-1
14"ø
14"ø
14"ø
14"ø
HVU-4
EF-22
CF-5
8"ø
635SRC
18"x10"
635SRC
18"x10"
M
EF-23
20"x20"
"x
20"x20"
MAU-1
"ø
6"ø
1318"x20"
"x
440CDE440CDE
6"ø
VAV-2-1
10"x8"
VAV-2-2
VAV-2-3
12"x12"
36"x34"
"x
"x
"x
"ø
12"x10"
12"x8"
6"ø
"ø
4"ø
12"x12" BELOW
"ø
"ø
"ø
"ø
8"ø
6"ø
5"ø
SSU-1
GFU-1
EF-19
M-402
M
20"x22"
54"x54"
20"x20"
22"x20"
22"ø
8"ø
8"ø
M-303
M-303
M M
M
SE
STORAGE
HVU-5
18"x18" 18"x18"
SF-3
BOB: 34' AFF
31' 2" AFF
18' 4" AFF
BOD: 25' - 3"
B O
D
BOD: 28' - 11"
BOD: 26' - 10"
BOD: 36' - 9"
BOD: 35' - 7"
BOD: 34' - 2"
BOD: 27' - 9"
BOD: 21' - 3"
BOD: 31' - 11"
BOB: 23' 9" AFF
IWH-1
3"ø
"ø
BOD: 23' - 6"
BOD: 21' - 10"
BOD: 25' - 9"BOD: 19' - 0"
ERH-8
18"x16"
"x
EF-25
BOD: 34' - 6"
BOD: 34' - 6"
8"ø 8"ø
DOAU-1
EF-26
16"x16" 400L-20
SF-4
400L-21
M
M
400SRC
RHC-2
10"ø
16"x16"
"x
500L-23
22"x14"
EF-18
7 7
M M
7 7
HR-10
HR-11
M M
HR-8
HR-9
12"ø
16"x16"
16"x16"
H-1
H-1
M
H-2
M
BOD: 20' - 5"
AC-4
AC-3
"ø
20"ø
20"ø H-2
27 36"x24" 36"x24"
8"ø
12"x12"
13853L-12A
13853L-12C
13853L-12B
12750L-14B
12750L-14A
TYP
8' MIN
TYP
3' MIN
690RGD
880RGD
48"ø
B O
D
BOD: 16' - 10"
16"ø
18"ø
50"ø
M-302
AC-2
"ø
10"ø
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
M-101
MECHANICAL HVAC CONCRETE DECK PLAN
09 APRIL 2015
MJG
MEL/MJG
RAC
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 1/8" = 1'-0"
CONCRETE DECK LEVEL
0' 2' 4' 8' 16' 24'TRUE
NORTH
KEY PLAN
SCALE: N.T.S.KP
KEY NOTES:
MOTORIZED OPEN/CLOSE DAMPERS . DAMPERS CONNECTED TO OUTSIDE (INTAKE OR EXHAUST) SHALL BE LOW LEAKAGE CLASS 1A TYPE, PARALLEL BLADE. ACTUATOR SHALL BE CAPABLE OF CLOSING THE DAMPER IN 10 SECONDS OR LESS.
CONNECT TO BAS SYSTEM. TYPICAL.
EXISTING RADIANT HEATERS TO REMAIN.
DUCT STATIC PRESSURE SENSOR
RELOCATED EXISTING RH AND ASSOCIATED EXISTING GAS TRAIN ASSEMBLIES.
14" DIAMETER DUCT DOWN TO 26'-5" AFF. TURN TO THE HORIZONTAL AND CONNECT INTO COILED FLEXIBLE HOSE. BALANCE
FOR 1000 CFM.
PAINT BOOTH EXHAUST DUCT SHALL BE ROUTED THROUGH EXTERIOR WALL DIRECTLY TO THE OUTSIDE. PROVIDE A
STAINLESS STEEL BIRD SCREEN AT THE DISCHARGE.
HOSE REEL FOR FUEL CELL PURGE. SEE SCHEDULES AND DETAILS.
SUPPORT MECHANICAL EQUIPMENT FROM CMU WALL. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL WALL STIFFENING
DETAILS. REFER TO "EQUIPMENT CANTILEVERED SUPPORT" DETAIL.
OPEN ENDED DUCT (OED) WITH WIRE MESH SCREEN (WMS).
AIR INTAKE CONNECTION SHALL BE MADE AT THIS LOCATION FOR CUSTOMER PROVIDED PAINT BOOTH MAKE-UP AIR UNIT (TO
BE PROVIDED BY OTHERS AS PART OF PAINT BOOTH PROCUREMENT).
EXHAUST PLENUM SHALL BE A MINIMUM OF 2 FEET DEEP. THE PAINT MIXING FUME HOOD EXHAUST SHALL DISCHARGE INTO THE TOP SECTION OF THE PLENUM AND THE GENERAL SPACE EXHAUST SHALL DISCHARGE INTO THE BOTTOM OF THE PLENUM.
EXHAUST AIR CONNECTION SHALL BE MADE AT THIS LOCATION FOR CUSTOMER PROVIDED PAINT BOOTH EXHAUST FAN (TO BE
PROVIDED BY OTHERS AS PART OF PAINT BOOTH PROCUREMENT).
DUCT DOWN TO FIRST FLOOR ELEVATIONS. REFER TO M-102 AND/OR M-401 FOR CONTINUATION.
BOILER COMBUSTION INTAKE: INCREASE TO ONE DUCT SIZE GREATER THAN THE BOILER CONNECTION. SLOPE HORIZONTAL DUCT AT 1/4" PER FOOT DOWNWARDS TOWARDS THE EXTERIOR WALL. ONCE DUCT HAS PENETRATED EXTERIOR WALL TURN DOWN WITH A LONG RADIUS ELBOW AND PROVIDE A STAINLESS STEEL BIRD SCREEN. INTAKE SHALL BE NO LESS THAN 4'-0" BELOW AND NO LESS THAN 3'-0" HORIZONTALLY FROM ANY BOILER FLUE EXHAUST TERMINATIONS. TYPICAL 3 PLACES.
BOILER EXHAUST: INCREASE TO ONE DUCT SIZE GREATER THAN THE BOILER CONNECTION. DUCT SHALL BE CONSTRUCTED OF STAINLESS STEEL. PENETRATE WALL WITH AN APPROVED WALL THIMBLE WITH AN AIR GAP BETWEEN FLUE AND WALL MATERIALS. EXHAUST SHALL TERMINATE NO LESS THAN 12" FROM EXTERIOR WALL SURFACE. PROVIDE A STAINLESS STEEL BIRD SCREEN. EXHAUST SHALL BE NO LESS THAN 4'-0" ABOVE AND NO LESS THAN 3'-0" HORIZONTALLY FROM ANY BOILER
COMBUSTION INTAKES. TYPICAL 3 PLACES.
CONTRACTOR SHALL CONNECT EXHAUST DUCTWORK AND TERMINATIONS TO NEW OVEN. PROVIDE NEW METAL-FAB IPIC-4 EXHAUST DUCT AND FITTINGS AS NECESSARY. INSTALL EXHAUST DUCT IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS. PROVIDE INSULATED WALL THIMBLE AND TERMINATE WITH STANDARD VENT CAP. MAINTAIN MIN 10'-0" ABOVE
GRADE. SEE DETAIL ON SHEET M-402.
DUCT DROP TO AVOID STRUCTURAL TRUSSES. CONTRACTOR SHALL COORDINATE ROUTING WITH EXISTING STRUCTURE AND
ALL TRADES. TYPICAL.
INTAKE PLENUM SHALL BE A MINIMUM OF 4' DEEP.
COMBINE 3" COMBUSTION AIR INTAKE AND 3" VENT INTO ONE PENETRATION THROUGH ROOF USING MANUFACTURER'S
PROVIDED CONCENTRIC ADAPTER.
EF-25 SHALL BE INTERLOCKED WITH HVU-5 AND SHALL OPERATE AT MINIMUM SPEED (450 CFM) WHENEVER HVU-5 OPERATES DURING OCCUPIED HOURS. IF TEMPERATURE IN SPACE EXCEEDS 85 DEGREES SF-3 SHALL ENERGIZE AND BLOW MORE VENTILATION/COOLING AIR INTO THE MECHANICAL ROOM AND THE EF-25 SHALL INCREASE SPEED TO MAXIMUM. SUPPLY AND EXHAUST FAN AND DAMPERS SHALL CLOSE ON A SIGNAL FROM THE EMERGENCY SHUTDOWN SWITCH.
HVU SHALL MAINTAIN A MINIMUM OF 60 DEGREES IN THE SPACE. DURING UNOCCUPIED HOURS THE OUTSIDE AIR DAMPER SHALL BE CLOSED AND THE RETURN AIR DAMPER SHALL BE OPEN. DURING OCCUPIED HOURS THE RETURN AIR DAMPER SHALL BE CLOSED AND THE OUTSIDE AIR DAMPER SHALL BE OPEN. DURING OCCUPIED HOURS THE HVU SHALL RUN CONTINUOUSLY AND THE HOT WATER VALVE SHALL MODULATE TO MAINTAIN TEMPERATURE AT SET POINT. HVU-5 SHALL DE-ENERGIZE AND ALL OUTSIDE AIR DAMPERS SHALL CLOSE ON A SIGNAL FROM THE EMERGENCY SHUTDOWN SWITCH.
TURN DOWN TIGHT TO WALL AND CONNECT INTO RESIN TABLE HOOD ON LEVEL BELOW. REFER TO M-102 FOR CONTINUATION.
TURN DUCT DOWN TO 12" BELOW THE FINISHED CEILING ELEVATION. CONNECT INTO A WALL MOUNTED SUPPLY REGISTER.
PROVIDE MOTORIZED DAMPERS THAT ARE CONNECTED TO EACH OF THE TWO HOSE REELS/BRANCH DUCT CONNECTIONS ASSOCIATED WITH THE FAN OR AC UNIT. THE MOTORIZED DAMPERS SHALL BE NORMALLY OPEN AND THE OPERATOR SELECTOR SWITCH SHALL CLOSE THE DAMPER OF THE HOSE REEL/BRANCH DUCT THAT THE OPERATOR DOES NOT WISH TO USE (OR BOTH CAN BE OPEN). THE MOTORIZED DAMPERS SHALL BE POWERED THROUGH THE EXHAUST FAN OR AC UNIT SWITCH SUCH THAT IF THE EXHAUST FAN IS TURNED OFF THE DAMPERS SHALL SPRING TO OPEN.
BOTTOM TAP HVU SUPPLY DUCTWORK AND ROUTE TO INLET OF AC-3 AND AC-4
PLACE AC-3 AND AC-4 ON 6" CONCRETE HOUSEKEEPING PAD ON MEZZANINE CONCRETE DECK.
MOUNT HUMIDIFIER STEAM GENERATOR/CONTROL PANEL SUCH THAT THE CENTER OF THE CONTROL PANEL IS 48" ABOVE THE FINISHED FLOOR. STEAM PIPING SHALL BE ROUTED UP TO STEAM DISPERSION ASSEMBLY LOCATED IN THE SUPPLY
DUCTWORK OF AC-3 OR AC-4. REFER TO PIPING PLANS FOR STEAM AND DRAIN PIPING.
PLAN
NORTH
1 RFI 90 - TRENCH EXHAUST 4/7/2016
2 SUBMITTAL 187 - LOUVER ADJUSTMENT 6/17/2016
3 RFI 203 - RETURN DIFFUSERS 5/8/2017
4 RFI 165 - ELECTRICAL HUMIDIFIERS 5/8/2017
5 REV FOR CCOR 253-032 11/20/2018
10" Ø OUTDOOR AIR DUCT SHALL BE CONNECTED TO LOUVER INTAKE PLENUM BOX.
10" Ø OUTDOOR AIR DUCT ROUTED DOWN TO SUCTION INTAKE ON BREATHING AIR COMPRESSOR AC-2. DUCT SHALL TRANSITION TO RECTANGULAR SIZE (10"X12") AT COMPRESSOR INTAKE AND SHALL BE SEALED AT CONNECTION. SEE SECTION ON SHEET M-302 FOR
DETAILS.
6 AIR COMPRESSOR REVISION 5/3/2019
1006210771C Rectangle
1006210771C
1006210771C Callout Despatch Oven will not be installed at Room 129
1006210771C
10" Diameter exhaust duct is INSTALLED at north wall (unused)
1006210771C
1006210771C
Rejected
1006210771C Callout Despatch Oven will not be installed in Room 129
1006210771C
10" Dia Exhaust Duct Installed (unused)
8' 9'
E'
F'
G'
C'
B'
A'
7'5' 10' 12' 14' 15'3'2' 13' 4'
P-402
WASH
ROOM
COMPOSITE
SHOP
PREP
ROOM
COMPRESSED
AIR
AIRLOCK
SANDING
(DIRTY)
CTK
STRUCTURAL
OFFICE
142PAINT
MIXING
PAINT
STOR
COMMUNICATIONS
SE
STORAGE
P-401
P7
FPH
FPH
FPH
CA CA
CA
CA
W
CA
CA
W
W W
P10
P11
/4 "ø
C A
/4 "ø
C A
1 1/4"ø CA 1 1/4"ø CA
/2 "ø
C A
/2 "ø
C A
2 1/2"ø CA2 1/2"ø CA2 1/2"ø CA
IWH-2
IWH-1
IWH-3
CA
BA
BA
BA
BA
BA
BA
1"ø CA BA
2"ø CA BA
2 1/2"ø CA
2" ø
C A
B A
1" ø
C A
B A
1" ø
C A
B A
2"ø CA BA2"ø CA BA
1"ø CA BA
2" ø
C A
B A
2"ø CA BA
2"ø CA BA
2"ø CA BA
CA
BA CA
CABA
CABA
CA
P10
IWH-3
W
1 1/2"ø CW @ 100 PSI
/4 "ø
C W
3"ø CW
/2 "ø
C W
2 1/2"ø CW
1"ø CA BA
1 1/4"ø CA
2 1/2"ø CW
/2 "ø
C W
3/4"ø CW
/2 "ø
C W
2 1/2"ø CW 2 1/2"ø CW
2"ø CA BA
2" ø
C A
B A
/2 "ø
C A
2"ø CA 2"ø CA BA 2"ø CA
2"ø CA BA 1 1/2"ø CA
1 1/2"ø CA BA 2 1/2"ø CA
1 1/4"ø CA 1"ø CA 1"ø CA BA
2 1/2"ø CA
2 1/2"ø CA
WD
WD
2 1/2"ø CW
4"ø G 5 PSI
4"ø G 5 PSI
4" ø
G
6"ø G
6"ø G6"ø G6"ø G6"ø G 6"ø G 2 PSI
ERH-8
ERH-7
ERH-6
2 1/2"ø G 1 1/4"ø G 1"ø G1 1/4"ø G
/2 "ø
G
/2
"ø G
1" ø
G
1"ø G
1" ø
G 1" ø G
1" ø
G
IWH-1 IWH-1
IWH-1
GRIEVE
OVEN
5 PSI TO 2 PSI REGULATOR
P-502
P-502
P-502
P-502
P-502
P-502
P-502
P-502
P-502
P-502
P-502 1
P-502
P-502
P-502
P-502
P-502
P-502
P-502
1-1/2" G UP (REFER TO P-403/
ENLARGED MEZZANINE
PLAN FOR CONTINUATION)
1-1/4" UP
4" G @ 5 PSI UP TIGHT
TO STRUCTURE
IWH- 1 TO BE MOUNTED
TO STRUCTURE ABOVE.
(TYPICAL OF 3)
2 1/2"ø CA
REFER TO P-403/
ENLARGED MEZZANINE
PLAN FOR CONTINUATION
1"ø CW @ 100 PSI 1 1/4"ø CW @ 100 PSI
1 1/4"ø CW @ 100 PSI
1"ø CW @ 100 PSI
1" ø
C W
P
S I
1"ø CW @ 100 PSI
2" CW UP TO PWP-1, 2" CW @ 100
PSI DOWN AND 1-1/4" CA (REFER
TO P-403/ ENLARGED MEZZANINE
PLAN FOR CONTINUATION)
P-404
CABA
CABA
1" ø
C A
B A
1" ø
C
ACA 3
P-502
CA
P-502
P-502
W
1-1/2" CW, HW, AND 3/4"
RECIRC. TO MECHANICAL
MEZZANINE
1 1/2"ø HW 3/4"ø HWR
3/
"ø H
W R
/2 "ø
H W
1 1/2"ø HW 3/4"ø HWR 3/4"ø HWR
1 1/2"ø HW
3/
"ø H
W
1" @ 2 PSI TO GWH-1
(REFER TO P-404/ ENLARGED
EXISTING PLUMBING MEZZANINE
PLAN FOR CONTINUATION)
CTK
FUELS
SUPERVISOR
104A
STORAGE
103A
FUEL
SYSTEMS
P-503
HEF
105A
STORAGE
CORRIDOR
MEN
LOCKER
MECHANICAL
112 MEN
RESTROOM
LAUNDRY
109B
VESTIBULE
JANITOR
109A
WOMEN
RESTROOM
WOMEN
LOCKER
108A
CORRIDOR
103B
CORRIDOR
WARP
STORAGE
MECHANICAL
INVERTER
STORAGE
P-503
P-503
P-503 1
P-503
P-503
2 1/2"ø CA
1" CA UP (REFER TO
P-403/ ENLARGED
MEZZANINE PLAN
FOR CONTINUATION)
1" CA UP (REFER TO P-403/
ENLARGED MEZZANINE
PLAN FOR CONTINUATION)
1/2" IWH-1 CONDENSATE ROUTED TO
MEZZENINE FLOOR DRAIN(REFER TO
P-403/ ENLARGED MEZZANINE PLAN
FOR CONTINUATION)
1/2"ø CONDENSATE 1/2"ø CONDENSATE 1/2"ø CONDENSATE
P-503
P-503
P-503
P-503
P-503
P-504
1" UP
P-504
1/2" CA DOWN TO
PNEUMATIC FLOW
CONTROL MANIFOLD
2-1/2" GAS TO
PAINT BOOTH
MAKE-UP AIR
UNIT
EXISTING EMERGENCY SHOWER
/EYEWASH AND ASSOCIATED
PIPING TO BE REMOVED.
CONTRACTOR TO PATCH AND
SEAL WALLS TO MATCH.
HANGAR
EXISTING
GRIEVE
OVEN
1"ø G 5 PSI
MEZZANINE
P-403 MEZZANINE
EXISTING BREATHING AIR
COMPRESSOR, AIR PURIFIER,
AND ACCESSORIES SHALL
REMOVED BY GOVERNMENT.
CONTRACTOR TO PATCH AND
SEAL WALLS TO MATCH.
3/4" DOWN WITH RPBP TO
HUMIDIFIER
3/4"ø CW
3/4" WITH RPBP TO
HUMIDIFIER
2 1/2"ø CA
CA & CWPIPING TO
MECHANICAL
MEZZANINE REFER
TO P-403 FOR
CONTINUATION
/2 "ø
C A
/2 "ø
C A
3/4"ø CW6" ø
G 6" ø G
2-1/2" CA DROP TO 4'-0" AFF
WITH DIRT LEG AND
HORIZONTAL VALVE AND
CAP FOR CONNECTION TO
JACKING MANIFOLD
(MANIFOLD BY OTHERS)
1-1/4" G
TO MAU-1
SYMBOL LEGEND
SYMBOL ABRV. DESCRIPTION
WATER DROP
COMPRESSED AIR DROP
W
CA
BREATHING AIR DROPBA
1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN
WASH OUT
WD
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-101
PLUMBING PRESSURE PIPING NORTH FLOOR
PLAN
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 3/32" = 1'-0"
PLUMBING PRESSURE PIPING NORTH FLOOR PLAN
0' 2' 4' 8' 16' 24'
KEY PLAN
SCALE: N.T.S.KP
TRUE
NORTH
PLAN
NORTH
1 AIR COMPRESSOR REVISION
3 REVISION 9/18/2018
4 REV FOR CCOR 253-032 11/20/2018
5/3/2019
5 B253 RFI 345 - IWH-1 & 3 4/2/2019
1006210771C Rectangle
1006210771C Callout Room 129
1006210771C
Grieve/Despacth Oven will not be installed in Room 129. All associated gas and air piping shown is INSTALLED.
8' 9'
E'
F'
G'
C'
B'
A'
7'5' 10' 12' 14' 15'3'2' 13' 4'
P-402
CORRIDOR
COMMUNICATIONS
WASH
ROOM
COMPOSITE
SHOP
COMPRESSED
AIR
PREP
ROOM
SANDING
(DIRTY)
PAINT
MIXING
PAINT
STOR
CTK
STRUCTURAL
OFFICE
SE
STORAGE
P10
P11
P7
TD2
SLOPED
WITH FLOOR
4"ø SS 6"ø SS
JACKING POINT
JACKING POINT
YCO
P-401
TD2
TD2TD2
TOP OF GRATE ELEVATION ~95.51'
INVERT AT BOTTOM OF TRENCH
~94.67'
TOP OF GRATE ELEVATION ~94.93'
INVERT AT BOTTOM OF TRENCH
~94.09''
TOP OF GRATE ELEVATION ~94.93
INVERT AT BOTTOM OF TRENCH
~94.09''
TRANSITION TO 6" PRIOR
TO EXITING FACILITY
SLOPED
WITH FLOOR
P10
FD2
FD2WCO
FCO
3"ø SS
3" ø
SS
3" ø
SS
2"ø
SS
3" VTR
CTK
FUELS
SUPERVISOR
104A
STORAGE
103A
FUEL
SYSTEMS
CONTRACTOR TO RECONNECT TO EXISTING
SANITARY SEWER SERVICE.
STORAGE
INVERTER
MECHANICAL
HEF
105A
STORAGE
WARP
STORAGE
MEN
RESTROOM
MEN
LOCKER
VESTIBULE
WOMEN
RESTROOM
LAUNDRY
109B
MECHANICAL
CORRIDOR
103BWOMEN
LOCKER
108A
FD-2
3" ø
SS
HANGAR
INVERT @ 87.5' REFER TO
CIVIL DRAWINGS FOR
CONTINUATION
PROVIDE MINIMUM OF 3'-0"
CLEARANCE FROM
EXISTING FOOTER
P-403 MEZZANINE
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
Au to ca d
Pr oj ec ts
\P ea se
AF
B H an ga rs \D ra w in gs
\A ut oC
AD
R ef er en ce
SZ
C
Q
-G -B
SA
R
C 1.
dw g gu ec ke r
AS SHOWN
Stamp
P-103
PLUMBING SANITARY SEWER NORTH FLOOR
PLAN
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 3/32" = 1'-0"
SANITARY SEWER NORTH FLOOR PLAN1
0' 2' 4' 8' 16' 24'
KEY PLAN
SCALE: N.T.S.KP
TRUE
NORTH
PLAN
NORTH
1006210771C Rectangle
1006210771C
C'
B'
A'
10' 12' 14' 15'13'
B-3 B-2 B-1
ERH-5
/2 "ø
C A
4" ø
G
2" ø
C A
B A
4"ø G 3 1/2"ø G 3"ø G
2 1/2"ø CA
2"ø CA BA
2" ø
C A
B A
/2 "ø
C A
2 1/2"ø CA
1 1/4"ø CA
1"ø CA BA
1 1/2"ø CW @ 100 PSI
2"ø CA BA
/2 "ø
C A
1 1/4"ø CA
MECHANICAL
EQUIPMENT
PLATFORM
1" CA DOWN TO SE
STORAGE 129
1-1/2" G DOWN TO
GRIEVE IN
SE STORAGE 129
(OPEN TO BELOW)
SE STORAGE 129
2-1/2" G @ 2 PSI
DOWN TO BOILER
(TYPICAL OF 3)
1-1/4" CA BA DOWN (REFER TO
P-101 FOR CONTINUATION)
1-1/4" CA DOWN (REFER TO
P-101 FOR CONTINUATION)
2" CW UP & 2" CW @ 100 PSI
DOWN (REFER TO P-101 FOR
CONTINUATION)
2 1/2"ø CA
6"ø G
3" SS DOWN TO
BELOW 1ST
FLOOR SLAB
3"ø SS
3"ø SS3"ø SS
FD2 FD2
3" VTR
ALL SS PIPING ROUTED BELOW
CONCRETE FLOOR ABOVE 1ST
FLOOR CEILING.
PWP-1
2"ø CW @ 100 PSI
2"ø CW @ 100 PSI
2"ø CW
1" ø
C W
P
S I
1"ø CW @ 100 PSI
1" ø
C W
P
S I
1 1/4"ø CW @ 100 PSI
1" CA DOWN TO SE
STORAGE 129
1 1/2"ø G
1"ø CA
1" ø
C A
1/2"ø CONDENSATE
1/2" CONDENSATE FROM IWH-1
ROUTED DOWN WALL OVER TO
FD-2.
1/2"ø CONDENSATE
1/ 2" ø C
O N
D E
N S
A T
E
HANGAR
AC-2
500 GALLON
RECEIVER TANK
FOR AC-1
AIR
DRYER
FOR
AC-1
240 GALLON
RECEIVER TANK
FOR AC-2
FILTER
2-1/2" CA TO CA MAIN IN
COMPOSITE SHOP REFER TO
P-101 FOR CONTINUATION
2"ø CA BA 1 1/4"ø CA BA
ROUTE 1/2" CONDENSATE ALONG
FLOOR FROM AC-2 AND AIR DRYER
DOWN TO HUB DRAIN WITH AIR GAP
FITTING IN PAINT MIXING 124 BELOW
3/4" CW TO BOILER
MAKE0UP WATER REFER TO
P-101 FOR CONTINUATION
3/4" MAKE-UP
WATER TO BOILERSCLEARANCE INDICATED
BY HATCHED LINES
1/
"ø
1/2"ø
3/4"ø CW
3/
"ø C
W
/2 "ø
C A
4"ø G
AC-1
2"ø CA
2" ø
C A
PROVIDE 94"X60"
CONCRETE PAD FOR AC-1.
CONTRACTOR TO VERIFY
DIMENSIONS.
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-403
PLUMBING ENLARGED PLANS
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 1/4" = 1'-0"
ENLARGED EAST PLUMBING MEZZANINE PLAN
0' 1' 2' 4' 8'TRUE
NORTH
PLAN
NORTH
1 AIR COMPRESSOR REVISION
2 RFI 89 - RESTROOM SANITARY UPDATES 5/8/2017
3 REV FOR CCOR 253-032 11/20/2018
5/3/2019
1006210771C Rectangle
1006210771C
MARK DESCRIPTION
MANUFACTURER
OR APPROVED EQUAL MODEL
CONNECTIONS
NOTES
CW HW WASTE VENT
P1
WATER CLOSET, WALL MOUNTED H.C. (1.28 GPF)
WITH WATER POWERED FLUSH VALVE KOHLER K-4325 1" - 4" 2"
TOTO FLUSH VALVE: TET1N32#CP,
KOHLER SEAT: K-4731-SC
P2
WATER CLOSET, WALL MOUNTED, (1.28 GPF) WITH
WATER POWERED FLUSH VALVE KOHLER K-4325 1" - 4" 2"
TOTO FLUSH VALVE: TET1N32#CP,
KOHLER SEAT: K-4731-SC
P3
URINAL (0.125 GPF) WITH WATER POWERED FLUSH
VALVE KOHLER K-4904-ET 3/4" - 1-1/2" 1-1/2" TOTO FLUSH VALVE: TEU1UN12#CP
P4
COUNTER TOP LAVATORY, H.C. (0.12 GPC WITH 12
SECOND DURATION/ 0.6 GPM) WITH WATER
POWERED METERING FAUCET
KOHLER K-2196-1 1/2" 1/2" 1-1/2" 1-1/2" TOTO FAUCET: TEL5LI15#CP
P5
WALL MOUNTED LAVATORY, H.C. (0.12 GPC WITH 12
SECOND DURATION/ 0.6 GPM) WITH WATER
POWERED METERING FAUCET
KOHLER K-2007 1/2" 1/2" 1-1/2" 1-1/2" TOTO FAUCET: TEL5LI15#CP
P6 SHOWER, H.C. (1.5 GPM) - - 3/4" 3/4" 1-1/2" 1-1/2" DELTA FAUCET: T13220-H2O
P7 2 COMPARTMENT SINK ADVANCE TABCO 94-42-48-24RL 3/4" 3/4" 1-1/2" 1-1/2" ADVANCE TABCO FAUCET: K-11
P8 ELECTRIC WATER COOLER ELKAY EZS4 1/2" - 1-1/2" 1-1/2" -
P9 SERVICE SINK KOHLER K-6710 3/4" 3/4" 3" 1-1/2"
KOHLER FAUCET: K-8907, INCLUDE MOP
BRACKET AND HOSE
P10 EMERGENCY EYE/FACE WASH HAWS 7261-7271 - 1/2" 1-1/2" -
PROVIDE 1/2" TEPID WATER FROM MIXING
VALVE, NOTE 3
P11 EMERGENCY EYE/FACE WASH AND SHOWER COMBO HAWS 8330-8309 - 1-1/4' 1-1/2" -
PROVIDE 1-1/4" TEPID WATER FROM
MIXING VALVE, NOTE 3
FD1 FLOOR DRAIN ZURN ZN415B - - 3" 1-1/2" WITH TRAP GUARD
FD2 FLOOR DRAIN ZURN ZN550 - - 3" 1-1/2" WITH TRAP GUARD
TD1 4" SHOWER TRENCH DRAIN ZURN ZS880 - - 2" 1-1/2" WITH TRAP GUARD
TD2 MAIN HANGAR TRENCH DRAIN ZURN Z784 - - 8" - -
HB HOSE BIBB WILKINS 195-BFP-8 3/4" - - - WITH INTEGRAL VACUUM BREAKER
FPH FREEZE PROOF HYDRANT ZURN Z1300 3/4" - - - WITH INTEGRAL VACUUM BREAKER
WCO WALL CLEANOUT ZURN Z1441 - - - - -
FCO FLOOR CLEANOUT ZURN Z1400 - - - - -
YCO YARD CLEANOUT ZURN Z1400 - - - - -
HR-1 100' HOSE REEL, SPRING DRIVEN COXREEL EZ-SH4100 - - - - -
HR-2 100' BREATHING AIR HOSE REEL, SPRING DRIVEN COXREEL EZ-T-BLL-3100 - - - - -
RPBP REDUCED PRESSURE BACKFLOW PREVENTER ZURN MODEL 375 3" - - - -
HUB
DRAIN HUB DRAIN ZURN Z-211 2" - - - DEEP SEAL TRAP WITH AIR GAP FITTING
NOTES:
1. H.C. DENOTES HANDICAPPED, INSTALL PER ADA REQUIREMENTS.
2. PRODUCT BRANDS SHOWN ON DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY AND SHALL NOT BE CONSTRUED AS THE ONLY PRODUCT AVAILABLE. OTHER BRAND SELECTED SHALL
MEET THE PERFORMANCE AND MATERIAL SPECIFICATIONS OF PRODUCTS LISTED.
3. PROVIDE AUDIBLE AND VISUAL EMERGENCY ALARM SYSTEM HAWS MODEL 9001EXP CONNECTED TO FIRE ALARM SYSTEM.
MARK
AREA SERVED AND
APPROXIMATE LOCATION
MINIMUM
STORAGE
CAPACITY
(GAL.)
MINIMUM
RECOVERY
(GPH)
DISCHARGE
TEMP. °F
TEMP.
RISE °F
ELECTRICAL NATURAL GAS
MANUFACTURER/MODEL
TOTAL KW
VOLTS/
PHASE
NUMBER
OF
ELEMENTS
CFH PRESSURE FLUE SIZE
IWH-1
TEMPERED WASH
WATER N/A N/A 100° 35° N/A 120/1 N/A 250 11" W.C. 3" HUBBEL: GX250
IWH-2
EMERGENCY
EYE/FACE WASH AND
SHOWER
N/A N/A 100° 35° N/A 120/1 N/A 250 11" W.C. 3" HUBBEL: GX250
IWH-3
EMERGENCY
EYE/FACE WASH N/A N/A 85° 30° 16 277/1 N/A N/A N/A N/A EEMAX: EX160T2EE
GWH-1 FACILITIES 60 99 140° 55° N/A 120/1 N/A 120 14" WC 3" - 4" A.O. SMITH: BTH-120(A)
REMARKS:
1. INCLUDE MODBUS INTERFACE MODULE.
2. CONTRACTOR TO PROVIDE REGULATOR AT EACH GAS FIRED EQUIPMENT. REGULATOR TO SHALL BE SET AT 2 PSI TO
MANUFACTURED RECOMMENDED PRESSURE SETTING. PLEASE REFER TO DETAIL 4 ON P502 FOR INSTALLATION.
MARK MANUFACTURER / MODEL SERVICE TYPE GPM
HEAD
(FT.) PSI
NP SH
REQ'D
(FT.)
RPM
EFF.
ELECTRICAL
REMARKS
HP VOLTS HZ.
PWP-1
BELL & GOSSETT /
V2VDC6G50B1CK
POTABLE WATER TO
WASH SYSTEM
VARIABLE SPEED
PUMP PACKAGE 90 219.5 141 5.6 3500 71.4 10 460 3 60 -
MARK MANUFACTURER / MODEL GPM
TD
HEAD
IN FT.
ELECTRICAL
SERVING LOCATION REMARKS
HP V HZ
CP-1
GRUNDFOS /
UP-15-18SU 2 5 1/25 115 1 60 110° F RETURN MECH. RM -
MARK TYPE
MINIMUM
FREE AIR
DELIVERY
(CFM)
PRESSURE
(PSI)
ELECTRICAL TANK SIZE REFRIGERATED AIR DRYER
SERVES REMARKS
HP RPM VOLTS PHASE GAL LENGTH WIDTH HEIGHT TYPE KW CONDENSER
VOLT/
PHASE
AC-1
OIL FREE
ROTARY SCREW 186 125 50
TO
3,400 460 3 500 89" 54" 76"
AIR
COOLED 5.0 - 460/3
TOOL AIR
SYSTEM 1, 2, 4, 5, 6
AC-2
BREATHING AIR
COMPRESSOR 112 100 25 3791 460 3 240 95" 36" 76.5"
AIR
COOLED 2.1 - 460/3
BREATHING
AIR SYSTEM 2, 3, 4, 5, 6
REMARKS:
1. INGERSOLL RAND: H50A; WITH VARIABLE SPEED DRIVE, REFRIGERATED AIR DRYER: NVC200.
2. AIR COMPRESSOR SHALL HAVE A MINIMUM OF 3% IMPEDANCE SERIES REACTOR, PROVIDED BY AIR COMPRESSOR MANUFACTURER.
3. INGERSOLL RAND: UP6-25; 20 PSI DELIVERY AT BREATHING AIR DROPS; COMPRESSOR SHALL HAVE INTEGRAL AIR DRYER AND CO DETECTOR. AIR COMPRESSOR SHALL HAVE 4 STAGE FILTRATION SYSTEM FOR
BREATHING AIR BY MARTECH SERVICES MODEL:150-E SERIES. UPON ACTIVATION OF CO DETECTOR MNS SHALL RECEIVE MESSAGE TO DISCONTINUE USE OF SYSTEM AND SEND SIGNAL TO CENTRAL STATION.
4. AIR COMPRESSOR SHALL MEET UNITIL REBATE CRITERIA.
5. UNITS SHALL BE PACKAGE UNITS WITH ALL ACCESSORIES TO BE INSTALLED.
6. CONTRACTOR SHALL COMPLY WITH ALL MANUFACTURER'S INSTALLATION REQUIREMENTS.
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-601
PLUMBING SCHEDULES
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
2 BOTH RFI 15 - AIR REEL REVISION
5/8/2017
3 RFI 58 - INSTANT WATER HEATERS
5/8/2017
1 AIR COMPRESSOR REVISION 5/3/2019
M
M M
M
M
MM
M
M
M
M
M
D D
Z3 Z3
Z3
D
M
M
M
M
M M
M
M M
M M
M M
M M
M M
M
M
M
M
LV2
O S
O S
O S
Z33
LV
LV
LV
LV
LV
LV
M
M
OS OS
LV
8' 9'
D'
E'
F'
G'
C'
B'
A'
7'5' 10' 12' 14' 15'3'2'
1 7
A
2 3 4 5 6
13' 4'
REEXEX EXEXRE
EX
RE
REEX
RERE
RERE
D
DE
DE
DE
DE
DE
DE
B1
B1
B1E
D
DE
DDE
C1C1
C1 C1
D
DE
DE D D
B1E
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1E
B1
B1
B1E
B1 B1E
B1
B1
B1E
B1
B1E
B1
B1
B1
B1
B1
B1
B1
B1
CE
C
C
CE
C
C
EXEXEXEXEX
EXEXEX
EXEXEX
EXEXEX
EX
EX
EXEX
EX EX
EX EX
EX
EX
EX
EXEX
EX EX
DD
EX
EX
J J
X
X
X
X
X
X
X
X
SE
STORAGE
CORRIDOR
MEN
RESTROOM
CLEAN
MEN
LOCKER
CLEAN
WOMEN
RESTROOM
CLEAN
WOMEN
LOCKER
CLEAN
COMMUNICATIONS
CORRIDOR
PAINT
STOR
PAINT
MIXING
COMPOSITE
SHOP
PREP
ROOM
SANDING
(DIRTY)
CTK
STRUCTURAL
OFFICE
MEN
SHOWER
DIRTY
WOMEN
SHOWER
DIRTY
JANITOR
MEN
LOCKER
DIRTY
MEN
RESTROOM
DIRTY
WOMEN
RESTROOM
DIRTY
WOMEN
LOCKER
DIRTY
ALCOVE
134A
ALCOVE
135A
EX
EX
EX
EX
EX
EX
EX
EX
EX
16' A.F.F.(TYPICAL FOR RM 120)
17' A.F.F.(TYPICAL FOR RM 119,121,122)
AIRLOCK
12' A.F.F.
H G GH
D D D D
DDD
D D D
D
DD
D D D D
DDDD
DE
DE
DE
DE
HP-3:38 2#12,#12,3/4"C
HP-3:40
2#12,#12,3/4"C
HP:3:42
2#12,#12,3/4"C
J1
J1 J1
J1
J1
J1
J1
J1
J1
J1
X
HP-3
RELOCATED
HANGAR LIGHTING
CONTROL DEVICES
J1
J1
J1
2#12,#12,3/4"C
ECU LP-3 LP-4
J
J
J
LP-2:52
2#12,#12,3/4"C
HP-3:48
JJJ
OS
OS
7 7
26' A.F.F.(TYPICAL OF RM 129)
WALL MOUNT 10' A.F.F.
(TYPICAL OF 3)
RECEPTACLE
CONTACTOR
PANEL
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
Au to ca d
Pr oj ec ts
\P ea se
AF
B H an ga rs \D ra w in gs
\A ut oC
AD
R ef er en ce
SZ
C
Q
-G -B
SA
R
C 1.
dw g gu ec ke r
AS SHOWN
Stamp
E-102
PARTIAL LIGHTING FLOOR PLAN BASE BID
09 APRIL 2015
MGD
CMD
WAP
LDC
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
TRUE
NORTH
KEY PLAN
SCALE: N.T.S.KP
0' 2' 4' 8' 16' 24'SCALE: 3/32" = 1'-0"
NORTH HANGAR AND SUPPORT AREA LIGHTING PLAN BASE BID1
GENERAL NOTES:
A. PROVIDE 2 #12, #12 (GND), 3/4" CONDUIT AS
NECESSARY FOR RELOCATED LIGHT
FIXTURES.
B. SEE DETAILS ON SHEET E-501 FOR CABLING
AND CONDUIT REQUIREMENTS RELATED TO
FIXTURE CONTROLS. CONTRACTOR
RESPONSIBLE FOR PROVIDING CABLE AND
CONDUIT INDICATED ON DETAILS NOT
SPECIFICALLY SHOWN ON THIS DRAWING.
C. COORDINATE LOCATION OF ELECTRICAL
EQUIPMENT WITH MECHANICAL AND
PLUMBING CONTRACTOR. RELOCATE EQUIPMENT
UP TO FIVE FEET AS NEEDED TO MAINTAIN
CLEARANCES PER NEC.
KEYNOTES:
CIRCUIT NEW FIXTURES TO EXISTING LIGHTING CIRCUIT SERVING THE
ROOM. EXTEND 2#12,#12 (GND), 3/4" CONDUIT AS NECESSARY. THERE
SHALL BE A NET DECREASE IN ROOM LIGHTING LOAD DUE TO THE ENERGY
EFFICIENCY OF THE NEW FIXTURES. REMOVE LINE FOR EXISTING SWITCHING.
CONNECT TO CIRCUIT SERVING NOSE DOCK LIGHTS. EXTEND 2#12, #12 (GND),
3/4" CONDUIT AS NECESSARY.
PROVIDE SEAL OFFS ON CONDUITS AS REQUIRED.
ENCELIUM ENERGY CONTROL UNIT. CATALOG #ECU-100, SEE DETAIL 1, SHEET
E-501 FOR TAIL DOCK EXTENSION LIGHTING CONTROL. WALL MOUNT 45" A.F.F.
CIRCUIT TO PANEL LP-3:17 VIA 2 #12,1 #12(GND), 3/4"C.
PROVIDE CONNECTION TO LIGHTS ASSOCIATED WITH GOVERNMENT FURNISHED
EQUIPMENT.
LIGHTING RELAY PANEL FOR EXTERIOR LIGHTING CIRCUITS, SEE DETAIL 3/E-501.
PROVIDE OCCUPANCY SENSORS TO CONTROL NEW LIGHTS IN ROOM. PROVIDE
2#12,#12(GND),3/4" CONDUIT AS NECESSARY.
PLAN
NORTH
1006210771C Rectangle
1006210771C
Room 129 Lighting Plan
TV
J
J
J
C'
B'
A'
10' 12' 14' 15'
A
13'
48"/GFI
48"/GFI
48"/GFI
48"/GFI
48"/GFI
"/G
FI
E
HP-2
LP-2
LP-2A
60"
60"
CH/GFI
C H
/G
FI
"/G
FI
C H
/G
FI
C H
/G
FI
G
FI
"/G
FI
GFI
G
FI
2 2
SE
STORAGE
CORRIDOR
MEN
LOCKER
DIRTY
MEN
RESTROOM
DIRTY
MEN
SHOWER
DIRTY
WOMEN
SHOWER
DIRTY
WOMEN
LOCKER
DIRTY
WOMEN
RESTROOM
DIRTY
JANITOR
MEN
LOCKER
CLEAN
WOMEN
LOCKER
CLEAN
WOMEN
RESTROOM
CLEAN
ALCOVE
134A
CORRIDOR
ALCOVE
135A
MEN
RESTROOM
CLEAN
COMMUNICATIONS
PAINT
STOR
PAINT
MIXING
COMPOSITE
SHOP
CTK
STRUCTURAL
OFFICE
E
LP-2:17
2#12,#12,3/4"CLP-2:12,14
2#12,#12,3/4"C 30
VAV-1-1
DOOR
MOTOR
NF
HP-4:13,15,17
3#6,#10(GND),1"C
LP-2:28
2#12,#12,3/4"C
LP-2:26
2#12,#12,3/4"C
LP-2A:8
2#12,#12,3/4"C
LP-2:34
2#12,#12,3/4"C
LP-2:30
2#12,#12,3/4"C
LP-2:32
2#12,#12,3/4"C
LP-2:39
2#12,#12,3/4"C
LP-2:36
2#12,#12,3/4"C
48"
48"
LP-2:29
LP-2:33
LP-2:31
2#12,#12,3/4"C
(TYP. OF THIS ROOM)
LP-2:35
2#12,#12,3/4"C
-2
E-111
LP-2:2,4,6
3#12,#12,3/4"C1.5 M
FCU-253-1
SEE AUDIO/VISUAL DIAGRAM ON
SHEET E-503 FOR CABLING
REQUIREMENTS
LP-2:37
G
FI
G
FI
G
FI
G
FI
HP-4
NEW DESPATCH
OVEN
E
2#12,#12,3/4"C
COMMUNICATIONS
140E
LP-2:7,9
NF
LP-2A:2
LP-2A:4
LP-2A:12
LP-2A:10
LP-2A:9
AC-1
2#12,#12,3/4"C
4(TYP. OF 2) .
LP-2A:6
LP-2A:7
LP-2A:5
LP-2A:3
LP-2A:1
(TYP. OF 2) 3
2#12,#12,3/4"C
(TYP. OF TR 140)
(TYP. OF 4)
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
Au to ca d
Pr oj ec ts
\P ea se
AF
B H an ga rs \D ra w in gs
\A ut oC
AD
R ef er en ce
SZ
C
Q
-G -B
SA
R
C 1.
dw g gu ec ke r
AS SHOWN
Stamp
E-111
SUPPORT AREA POWER AND SYSTEMS PLAN
09 APRIL 2015
MDG
CMD
WAP
LDC
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: 3/16" = 1'-0"
SUPPORT AREA POWER AND SYSTEMS PLAN1
PLAN
NORTH
0' 1' 2' 4' 8' 12'
KEYNOTES:
RATED CLASS 1, DIVISION 1, PROVIDE SEAL OFFS AS REQUIRED.
MOUNT RECEPTACLE IN RECESSED BOX SIZED TO CONTAIN TOWEL DISPENSER'S
6V A/C POWER ADAPTER.
FLOOR MOUNTED RACK (19" WIDE BY 84" TALL) WITH PATCH PANELS
FOR TERMINATIONS.
PLYWOOD BACK BOARD.
RECEPTACLES SHALL BE CEILING MOUNTED, CENTERED OVER COMMUNICATION
RACK.
PROVIDE BACKBONE CABLING FROM TR 140 TO EXISTING TELECOMMUNICATIONS
EQUIPMENT LOCATED UNDER STAIRS BY ROOM 108, SEE SHEET E-108.
TELECOMMUNICATIONS GROUNDING BAR.
WALL PHONE, 48". 1 CAT 6 RJ-45 TELEPHONE DROP. SEE DETAIL 6/E-503.
TELEPHONE/DATA 18" U.O.N. 4 CAT 6 RJ-45 DATA DROPS. SEE DETAIL 6/E-503.
NOT USED.
12"x4" LADDER TYPE CABLE TRAY 9'-0" A.F.F.
JUNCTION BOX FOR SUPPORT AREA TELE/COMM CABLING. SEE DETAIL 6/E-503
FOR CONDUIT REQUIREMENTS.
JUNCTION BOX FOR COMPOSITE SHOP AREA TELE/COMM CABLING. SEE DETAIL
6/E-503 FOR CONDUIT REQUIREMENTS.
TO VAV-1-2, VAV-1-3, VAV-1-4, VAV-2-1, VAV-2-2, VAV-2-3, VAV-2-4, SEE SHEET E-110.
KEY PLAN
SCALE: N.T.S.KP
SCALE: 1/4" = 1'-0"
ENLARGED TR 1402 0' 1' 2' 4' 8'
PLAN
NORTH
TRUE
NORTH
TRUE
NORTH
1006210771C Rejected
1006210771C Callout Despatch Oven will not be installed at Room 129
1006210771C Rectangle
1006210771C Rectangle
1006210771C Line
1006210771C
Electrical panels actual installation location along west wall of Room 129
| B253_AE-101 |
| B253_AE-106 |
| B253_AE-201 |
| B253_AE-301 |
| B253_FP-102 |
| B253_LS-101 |
| B253_M-100 |
| B253_M-101 |
| B253_M-102 |
| B253_M-105 |
| B253_M-106 |
| B253_M-402 |
| B253_P-101 |
| B253_P-103 |
| B253_P-403 |
| B253_P-601 |
| B253_E-102 |
| B253_E-107 |
| B253_E-111 |
| B253_E-601 |
| B253_E-602 |
| B253_E-603 |