PWS Refuse and Recycling FY27.pdf
PDF 291 KB Posted
- Attached to
- Refuse & Recycling Services
- Solicitation number
- W50S8527QA001
About this file
Performance Work Statement Summary
This is a Performance Work Statement (PWS) for refuse and recycling collection, transportation, and disposal services at Selfridge Air National Guard Base (SANGB) in Michigan. The contract covers a base year of 12 months plus four 12-month option years, with services provided Monday through Friday between 0630 and 1630 hours. The contractor must establish and submit vehicle routes and collection schedules for Contracting Officer approval at least 10 working days prior to contract start, with no schedule changes permitted without approval. Services include collection of refuse and recyclables from 91 regular non-shared dumpsters across multiple buildings and departments, disposal at Type II landfills in compliance with federal, state, and local regulations, and provision of four 8-cubic-yard recycling containers with weekly disposal. The contractor must furnish all dumpsters and equipment, maintain them in proper condition free of rust and odors, and provide replacement containers during maintenance periods.
Key performance standards include ensuring dumpsters do not overflow with an acceptable quality level of no more than 2 missed full dumpsters per month, limiting valid customer complaints to no more than 3 per month, and submitting monthly reports with certified weigh tickets by the 5th workday of each month. The contractor must also provide on-call services with response times of four normal duty hours and emergency dumpster relocation within two hours during military exercises. Additional requirements include 36 roll-off dumpster hauls per year at a fixed rate, site cleanup following collection, compliance with OSHA and environmental regulations, Antiterrorism Level I training for all employees within 15 days, and Service Contract Reporting via SAM.gov. The Government furnishes dumpster location spots and security/fire protection services; the contractor is responsible for all other materials and equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pricing CLIN Structure for Quote- Refuse 10-27-2026.xlsx | XLSX spreadsheet | |
| Historical Dumpster Locations and Sizes 10-27-2026.xlsx | XLSX spreadsheet | |
| Solicitation - W50S8527QA001.pdf | ||
| WD 2015-4867_ 22 Aug 2026_ Rev 35.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
ERFORMANCE WORK STATEMENT (PWS)
FOR
REFUSE AND RECYCLING SERVICES
AT
SELFRIDGE AIR NATIONAL GUARD BASE, MICHIGAN (SANGB)
SECTION 1 GENERAL
SECTION 2 DEFINITIONS AND ACRONYMS
SECTION 3 GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT, AND
SERVICES
SECTION 4 CONTRACTOR FURNISHED PROPERTY, MATERIALS, AND EQUIPMENT
(CFP/M/E)
SECTION 5 REQUIREMENTS
SECTION 6 APPLICABLE PUBLICATIONS
TECHNICAL EXHIBIT 1: Performance Requirements Summary
TECHNICAL EXHIBIT 2: Deliverables Schedule
TECHNICAL EXHIBIT 3: Historical/Estimated Workload Data
1.0 General:
1.1 Scope: The contractor shall perform refuse and recycle collection, transportation, and disposal services, for
Selfridge Air National Guard Base (SANGB) Michigan in accordance with (IAW) all applicable laws, regulations, standards, instructions and commercial practices as described in this PWS with focus on safety, sanitation and customer service.
The required refuse services include:
• Collection Requirements of refuse and recyclables
• Disposal
• Reports and Records
1.2 Background:
1.2.1 The 127th Wing is the host unit at SANGB and is responsible to provide refuse services to all units at Selfridge.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and four 12-month option years.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0630 and 1630, Monday through Friday. Collection outside these hours shall require prior approval of the KO except on recognized US holidays. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement.
Service is not suited for telework.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees shall only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor may be required to work on these federal holidays, as approved in advance by the KO. When holiday work is required, the contractor shall be compensated at the applicable line item rate on the Standard Form (SF) 1449 Continuation Sheet(s).
New Year’s Day 1 January Martin Luther King, Jr.’s Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May
Juneteenth 19 June Independence Day 4 July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 November Thanksgiving Day 4th Thursday in November Christmas 25 December
1.4.3 Quality Control (QC): QC is the sole responsibility of the contractor. The contractor shall develop and maintain an effective QC methods and processes to ensure continuous, cost effective, and efficient collection and disposal of refuse is performed IAW commonly accepted commercial practices
1.4.4 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.4.1 The COR will evaluate the contractor’s performance through intermittent on-site inspections, review of the contractors QCP, and receipt and investigation of customer complaints. Initial customer complaints shall be validated by Government personnel and in cases of disagreement with customer(s), the final determination of the validity shall be made by the KO.
1.4.4.2 The contractor shall ensure that timely and effective corrective action is obtained for all deficiencies identified by the Government. All deficiency responses shall include identification of the cause of the deficiency to preclude recurrence and an analysis of the quality program’s effectiveness in the area of the deficiency.
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. Prior to access the contractor shall submit a written request on the current Base Access Form to the contracting specialist providing all requested information. The contracting specialist will forward the request to the issuing base Pass and Registration office / Security Forces mailbox for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and official documentation of a social security number to obtain a dbids identification or base pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4. Reserved
5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
6. Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1 Reserved
1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)
1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor or completing the Force Protection computer-based training (CBT) course on or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.4 Reserved
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 thru 1.4.5.14 Reserved
1.4.6 Environmental
1.4.6.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection to include AFI 32-7001 Environmental Management and AFMAN 32-7002 Environmental Compliance and Pollution Prevention. In the event environmental laws/regulations/requirements change during the term of this contract, the contractor shall comply with such laws/regulations as changed.
1.4.6.2. Notification of Environmental Spills. If the contractor spills or releases any substance into the environment, the contractor shall immediately call 911 to report the incident and notify the COR, and be familiar with and follow the most current spill response procedures. The contractor shall be held liable for the spill or release of such substances. The contractor is responsible for advising his employees of all Environmental Materials (EM) and Hazardous Materials (HM) Handling and is also required to have and maintain Safety Data Sheets (SDS) on all materials that are required by State and Federal Laws and/or Regulations.
1.4.6.3 Safety Requirements: The contractor shall comply with all federal and state OSHA requirements and standards as published in the OSHA 29 CFR, technical orders (TO), regulations, and referenced publications. The http://jko.jten.mil/ contractor shall comply with the highest degree of safety protection where any disagreements exist. Additionally, the contractor shall comply with installation regulations governing safety and fire prevention, IAW SANGBI 32-7, Fire Protection Program. The KO, COR, Base Civil Engineer (BCE) or designated representative, Occupational Ground Safety, and Security Police may issue an order to the contractor or employee(s) to stop all or part of the contractor’s work until all violations are corrected. Bio-environmental Engineering personnel, who notice violation of OSHA or local standards, will notify the KO who has the authority to stop all or part of the contractor’s work. The contractor shall not be excused for unsatisfactory performance that may result from a stop work order.
1.4.6.3.1 Accident prevention and safety practices on contractual work under the jurisdiction of the KO are the responsibilities of the contractor concerned. The contractor shall brief all employees on proper safety and accident reporting. The contractor shall provide all occupational health services to his employees. Contractor employees shall be instructed to notify the contractor’s Contract Manager of potential or existing occupational health hazards that require attention.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating vehicles or equipment used in the performance of this contract. Only licensed operators shall be permitted to operate the vehicles or equipment under this contract. Truck drivers shall possess a valid driver’s license with a Commercial Driver License (CDL) rating and be thoroughly acquainted with and comply with base traffic regulations. The contractor shall submit the name and proof of qualifications to the KO prior to start of work.
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend a post award conference convened by the KO IAW FAR 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract.
The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, or the Contract Specialist (CS) if a COR is not available, to resolve issues, receive directions and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor employees working on Government facilities shall wear identification badges or uniforms distinguishing themselves as such. All contractor personnel attending meetings shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from their employees who depart employment for any reason. All identification media (i.e., badges and vehicles passes) shall be returned to the KO within 14 days of an employee’s departure.
1.4.11 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The contractor shall notify its employees of the United States Government’s zero tolerance policy and the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 thru 1.4.15 Reserved
1.4.16 An annual performance evaluation will be prepared at the exercise of each option and at the end of the contract period IAW FAR 42.1502. Interim evaluations may be prepared at any time during contract performance when determined to be in the best interest of the Government (i.e. substandard performance).
1.4.16.1 Contractor will be sent an email notice to review and comment (if appropriate) on the performance evaluations via a web based system contract performance reporting system (CPARS). The contractor’s point of contact (POC) to receive notification of performance evaluations shall be identified at time of award of the contract.
The POC must maintain a current email address on file with the Contracting Officer.
1.4.16.2 All DoD contractors are required to obtain a Public Key Infrastructure (PKI) certificate to access the CPARS applications. DoD contractors are required to purchase a certificate from an External Certificate Authority (ECA). Contractor must be proactive in obtaining certificates. If you have questions on obtaining PKI certificates, please visit www.cpars.navy.mil. Contractors who fail to have their certificates will not be able to access the system.
1.4.17 Coordination with Other Contractors. The Government may award other contracts or additional work not prescribed in this contract. The contractor shall fully cooperate with other such contractors. The contractor shall not commit or permit any act that will interfere with the performance of work by another contractor.
1.5 Training. Contractor personnel shall be responsible for satisfactorily completing and documenting all required training over the life of the contract.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 UNSERVICEABLE CONTAINER. A container, which does not operate properly due to a physical defect or one that, emits nuisance odors discovered by customer or government representative.
2.1.12 VALID COMPLAINT. A complaint investigated and substantiated by the COR and passed on to the contractor.
2.2 ACRONYMS:
AF Air Force AFI Air Force Instruction AFMAN Air Force Manual ANG Air National Guard AT/OPSEC Antiterrorism/Operational Security CFR Code of Federal Regulations CM Contract Manager CS Contract Specialist COR Contracting Officer Representative CPARS Contract performance reporting system DFARS Defense Federal Acquisition Regulation Supplement DFAS Defense Finance and Accounting System DOD Department of Defense FAR Federal Acquisition Regulation GFP/S Government Furnished Property/ Services HAZMAT Hazardous Materials (office) HM Hazardous Material IAW In Accordance With KO Contracting Officer MING Michigan National Guard NHO Normal hours of operation OPSEC Operations Security OSHA Occupational Safety and Health Standards PKI Public Key Infrastructure POC Point of Contact PoP Period of Performance PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SANGB Selfridge Air National Guard Base SDS Safety Data Sheet TE Technical Exhibit
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract::
3.1 Property: The Government will furnish the necessary spots for the contractor to locate the dumpsters. The location and size of the dumpsters required are in TE 3.
3.2 Materials: None
3.3 Equipment: None
3.4 Services: Security Police and Fire Protection. Phone Number 911. If using a cell phone on base to call 911 the user must identify that they are at Selfridge and the call will then be transferred to Selfridge.
3.5 Utilities: None
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Section 3.0, the contractor shall furnish everything required to perform the services as indicated in this PWS.
4.1.1 The contractor shall provide all dumpsters necessary to perform this contract. The initial location and size of dumpsters are reflected on a map to be provided.
4.1.2 Dumpster Quantities: See Technical Exhibit (TE) 3 Historical/Estimated Workload Data.
4.2 Reserved
4.3 Contractor Security Clearance: None
5.0 Requirements: The contractor shall:
5.1 Establish vehicle routes and collection schedules to meet the requirements of this PWS. Schedules shall be submitted to the Contracting Officer (KO) for approval within ten (10) working days prior to start of contract performance. The KO must approve the schedules prior to the contractor starting work. No changes are allowed to the schedule or haul route without KO approval. The contractor shall notify the Contracting Officer ’s Representative (COR) of any conditions that may interrupt the schedule of performance such as disposal sites backed up, delay entering or leaving the base due to security measures, vehicle breakdowns, etc. Updates to the schedules shall be given to the COR within five (5) working days of any modification changes. Contractor shall service dumpsters as often as necessary to ensure containers do not overflow.
5.2 Refuse and recycling collection service shall be restricted to contractor owned dumpsters. The Contractor shall ensure dumpsters are emptied prior to exceeding their capacity. Dumpsters shall be returned to the appropriate locations or site in an upright position with lids/side doors closed. Containers shall be squared on the pad provided and within dumpster enclosures where applicable.
5.3 Recycling containers will be located at a single fixed location. The container will be co-mingled for all the paper products including cardboard, mixed paper, office packs, manuals, paper shreds in bags, etc. (no food paper products will be disposed of in these containers).
5.3.1 Four (4) Required containers shall be provided and shall be no less than 8 cubic yard containers. The recycling containers will be a different color than that of waste disposal container. The contents of the containers shall be disposed of once a week.
5.4 Contractor will provide two (2) 30 or 40 yard roll off type dumpsters in 127 Wing’s open storage area for wood and other large materials that do not fit in the front load dumpsters. 2 physical containers are provided, with a maximum of 36 hauls/exchanges permitted per year.
5.4.1 The roll off dumpsters upon request will be changed out within 3 business days upon notification from the COR, CS, or KO.
5.4.2 Thirty-Six (36) Roll off dumpsters shall be provided at a firm fixed rate for each year of the period of performance. These will only be billed monthly per use. Any remaining will not roll over to next period of performance.
5.5 Off-Base Disposal. The contractor shall dispose of all refuse at a Type II landfill or equivalent facility, licensed to accept municipal waste. Disposal shall be IAW existing local, state, and federal regulations. The contractor shall be responsible for any permits associated with the use of off-base disposal locations.
5.5.1 Prior to start of work, the contractor shall submit a certified statement of available disposal facilities for his/her use during the period of this contract. A certified statement shall also be provided prior to the use of any new facility the contractor may propose using during contract performance. The certified statement shall specify the legal and identification name of the facility, location of the facility, identification of the legal entity responsible for its operation, and identification of the documents or certificates specifically stating compliance of the facility with all applicable laws and regulations.
5.6 Reports and Records. The contractor shall provide a monthly report detailing total tonnages for all refuse removed from SANGB. The report and all associated weigh tickets shall accompany the invoice and shall be submitted by the 5th working day of the month. All weigh tickets shall contain the name, address, and telephone number of the receiving facility for every load of disposed materials. All vehicles utilized in the collection of refuse shall be weighed on state certified scales. Incoming and outgoing vehicle weights shall be recorded on weight tickets to determine the amount of refuse tonnage collected at the base. Vehicle weights shall be recorded on machine printed weight tickets provided by the operator at the weigh station, empty vehicle weights will be record at landfill and with the COR. Weighing of vehicles may be subject to periodic check by the Government.
5.7 On-Call Services. The contractor shall provide “On-Call” service when verbally notified by the COR. On call service consists of the contractor providing additional pick up services, movement of containers, delivery of additional dumpsters, etc. Response time for these on-call services shall be provided within four (4) normal duty hours after initial receipt of notification. When notification does not allow contractor sufficient time during the normal duty day, the contractor shall respond within the first 4 hours of the next duty day.
5.7.1 The contractor shall be required to move dumpster (s) for occurrences such as military exercises, real world threats, building demolition’s, etc. The contractor shall begin moving dumpster (s) within two (2) hours of verbal notification by the COR. During military exercises and real world threats, the contractor shall move container(s), away from building(s), for a minimum of 75 feet to a maximum of 150 feet away from the buildings. After military exercises and real world threats the contractor shall move dumpster (s) back to their original location(s). The regular pick up schedule shall not be interrupted because of these requirements.
5.8 Dumpster/Container Size and Type: All 2 yard, 3 yard, 4 yard, 6 and 8 yard dumpsters shall have lids that cover 100% of the containment area and shall be front-end loading. All 30 yard dumpsters (roll-offs) are exempt from lid requirements.
5.9 Points of Collection.
5.9.1 Collection Stations. The collection points (Building Numbers) are located in TE 3.
5.9.2 Multiple Containers. If more than one container is positioned at one collection station, the contractor shall place containers as close together as feasible for user convenience and organized appearance.
5.9.3. Site Clean-Up. The contractor shall be responsible for cleaning up any spills, which may occur during servicing of refuse containers. The container area shall be cleaned of all spilled material prior to leaving the collection site.
5.10 Dumpster/Container Maintenance and Condition: The Contractor shall maintain dumpsters to be free of rust, dents, and broken or inoperable parts such as lids, and hinges devices. The Contractor shall maintain dumpsters to ensure they are free of odors, dirt, debris, and pest. All cleaning/washing shall be accomplished off base and IAW local, state and federal regulations.
5.10.1 The contractor shall furnish replacement dumpsters for all dumpsters removed for maintenance and/or cleaning to insure that collection stations have adequate refuse dumpsters.
5.10.2 All dumpsters shall be painted a uniform color and recycling containers shall be a separate uniform color.
The contractor shall provide a sample of the proposed paint color to the KO for approval at the pre-performance conference.
5.10.3 All dumpsters, which are mounted on wheels, must have a positive braking/locking device.
5.11 Service Contract Reporting (SCR):
5.11.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site.
5.11.2 The contractor shall completely fill in all required data fields using the following web address:
https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.
The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1-September 30).
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://www.fsd.gov/
6.0 Applicable Publications: Publications applicable to this PWS are listed below: M=Mandatory A=Advisory
Publication Date of Publication M or A Website
Federal Acquisition Regulation
Para 1.4.11 ctip
Para 1.4.8M https://www.acquisition.gov/
40 CFR, V27, Part 243, Subpart B
Code of Federal Regulations Current as of 17 February 2021
M Ecfr.gov
AFI 10-245 A Para 1.4.5.2
AFI 31-101
Security Forces Standards and Procedures
08/18/2020
A https://www.e-publishing.af.mil/
AFMAN 31-113
Security Forces Standards and Procedures
03/05/2013 Change 1: 12/02/2015
A https://www.e-publishing.af.mil/
AFI 32-7001
Environmental Management
23 Aug 2019 M e-publishing.af.mil/home
AFMAN 32-7002
Environmental Compliance and Pollution Prevention
04 FEB 2020
M e-publishing.af.mil/home
SANGBI 32-7 Selfridge Fire Protection Program
A COR will provide http://www.acquisition.gov/ http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
PWS
Section
Task Performance Standard Acceptable Quality Levels (AQL) Surveillance Method by
COR
5.1 thru 5.3
Service dumpsters
Dumpsters are emptied as often as necessary to ensure containers do not overflow
AQL of 2 missed dumpsters that were at capacity on collection day
Periodic monthly inspection by COR and Customer
Feedback
5.1 thru 5.4
Collection and disposal requirements of refuse from the collection stations
All containers are emptied per approved schedule
AQL of no more than 3 valid customer complaints per month.
Periodic monthly inspection by COR and Customer
Feedback
5.9.3 Container sites
Container sites are clean of all spilled material after containers have been emptied.
AQL of no more than 3 valid customer complaints per month.
Periodic monthly inspection by COR and Customer
Feedback
5.6 Records and
Reports
Monthly report with weigh tickets are accurate and submitted by the 5th workday of each month
AQL of no more than 1 day late or weight tickets are missing some data.
Periodic monthly inspection by
COR
5.10- 5.10.3
Dumpster Maintenance
Dumpsters are maintained IAW para 5.10
AQL of no more than 3 valid customer complaints per month.
Periodic monthly inspection by COR and Customer
Feedback
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies Medium/Format Submit To
1.4.5
Base Access/ Security List Prior to base access, subsequently as employees are added or deleted
1 Electronic KO
1.4.5.3 AT Level I Training
One time. Complete within 15 days of contract start or employees start on contract.
Submit certificates within 15 days of completion.
1 Hard Copy or Electronic COR
1.4.9 CM and alternate CM
designation
Pre-performance meeting & subsequently prior to hire if CM changes
1 Hard Copy or Electronic KO
1.4.10.1 Identification
Media
Return within 14 days of employee’s departure from contract performance.
Original(s) Hard Copy KO
5.1 Schedule
Schedule provided within 10 workdays prior to start and within 5 workdays of any schedule changes
1 Hard Copy or Electronic KO
5.5.1 Certified Statement of
available disposal facilities
Prior to start of work 1 Hard Copy or
Electronic COR
5.10.2 Paint Sample
Dumpster Paint Sample provided at the pre-performance meeting
1 Hard Copy COR
TECHNICAL EXHIBIT 3
Historical/Estimated Workload Data
The estimated quantities of services are listed are estimates only and do not constitute a minimum or maximum quantity the Government represents as being the limits for which service is required. These quantities are the Government’s latest available historical data. This may not be a complete list of all dumpsters.
Currently containers are being emptied twice per week Monday’s and Thursday’s.
CLIN BLDG. NUMBER # OF
CONTAINERS
CONTAINER
CAPACITY (CUBIC
YARDS)
127/BOS/ Sales Code
1 3 2 2, 4 127 1 5 1 4 127 1 7 1 4 127 1 9 1 4 127 1 18 1 2 127 1 24 1 4 127 1 34 1 4 127 1 36 2 4,4 127 1 45 1 4 127 1 117 1 4 127 1 126 1 4 127 1 154 1 2 127 1 160 1 2 127 1 165 3 2,4,4 127 1 168 1 2 127 1 171 1 4 127 1 190 1 4 127 1 303 1 4 127 1 304 1 4 127 1 825 1 4 127 1 898 1 6 127 1 1051 1 4 127
2 103 1 4 BOS
2 105 2 4,4 BOS
2 118 1 6 BOS
2 125 1 4 BOS
2 127 1 4 BOS
2 128 1 4 BOS
2 170 1 4 BOS
2 180 2 4,4 BOS
2 197 1 4 BOS
2 560 1 4 BOS
2 831 1 2 BOS
2 859 1 4 BOS
2 881 1 2 BOS
2 886 1 2 BOS
2 901 1 4 BOS
2 1420 1 4 BOS
3 300 1 2 80H JPO
3 301 1 4 80H JPO
3 302 1 4 80H JPO
3 590 1 2 80H JPO
3 1414 3 6,6,4 80H JPO
4 880 1 4 80J GVSC
4 1424 1 4 80J GVSC
4 1426 1 4 80J GVSC
4 1437 2 4,6 80J GVSC
5 700 (Boat Dock) 1 6 91 MWR 5 570 (Golf Course) 2 6,6 91 MWR
6 781 1 4 91A AAFES
6 700 3 6,6,6 91A AAFES
7 701 4 2,2,6,6 27A DECA
9 715 1 2 97 Credit Union
9 971 1 4 80B CDC
10 708 1 2 80B Army Recruiting 11 1408 1 4 81C Naval Res 11 1409 1 4 81C Naval Res 11 1425 1 4 81C Naval Res
12 1412 1 6 86R CG
12 1465 1 4 86R CG
13 1416 1 4 80T Army Surf/Av 14 1422 2 4,4 86R DHS Air 14 1436 1 4 86R DHS Air 15 1428 1 4 86R DHS Marine
16 1533 1 4 86R DHS BP
17 1515 1 4 86R DHS BP
18 1060 2 6 88C Marines 18 1430 1 4 88C Marines 18 1443 1 4 88C Marines 18 1444 1 4 88C Marines 19 1492 1 6 80T Army SurfAv 20 1011 1 4 98 Museum 21 6591 (CE Open Storage) 2 see note 30, 30 127 22 180 (Recycling Center)
4 Shared 8, 8, 8, 8 Shared
23 180 (Recycling Center) BOS 24 180 (Recycling Center) 91A AAFES 25 180 (Recycling Center) 80B Reimbursable
Total 91 Reg not
Shared Dumpsters
NOTE: Estimated Total of thirty-six, 30 Yard dumpsters as needed per Period of Performance, two always located at CE Open Storage
File details come from the government source that posted it. Updated .