This is a Questions and Answers document for federal contract opportunity W50S85-26-Q-A033, a Backflow Cross Contamination Report for Selfridge Air National Guard Base (ANGB). The document addresses clarifications submitted by potential offerors regarding the solicitation requirements as of August 12, 2026.

The contract involves surveying and documenting 184 known backflow devices at the facility to identify unprotected cross connections that pose health risks to the distribution system. The contractor must document all existing equipment, assess installation adequacy, and provide a comprehensive report. No standardized ANGB format is required for presenting this information. Testing results must be submitted directly to Selfridge ANGB as part of the final report and can be provided to the Contracting Officer's Representative (COR) or Point of Contact (POC). The solicitation contains two CLINs (0001 and 0002) with identical descriptions for invoicing purposes; offerors should split total pricing between the two CLINs. This is a new requirement with no incumbent. Offerors with no prior federal prime contract experience will not receive neutral treatment based on lack of past performance and do not need commitment letters from subcontractors. An optional site visit was scheduled for August 13 at 1 p.m. local time, with registration required by August 5 at 10 a.m. via email to tami.mckenney.1@us.af.mil, including company name, full name, date of birth, driver's license number, and U.S. citizenship verification. Qualified representatives, including proposed first-tier subcontractors, may attend the site visit on behalf of the bidding company if vetted.

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS.docx DOCX document
DOS Backflow Cross Connection Rpt Svc FY26.pdf PDF
WD 2015-4867_Rev 33_Dated 13 May 2026.pdf PDF
Solicitation - W50S8526QA033.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO:

W50S85-26-Q-A033

Backflow Cross Contamination Report as of 2:04pm EDT on 8-12-2026

Dated: 7-23-2026

Q1. Is there an incumbent? If so who it is and what was their cost?

A1. This is a new requirement.

Q2. "These surveys identify unprotected cross connections that pose a health risk to the distribution system." Would we need to identify unprotected portions of the system as well or is this survey just for the known 184 devices?

A2. This survey is for the known 184 devices.

Q3. “The Contractor shall document all existing equipment, assess installation adequacy, and provide a comprehensive report." Does ANGB already have a preferred format/form/database to present this information?

A3. There is not a standardized ANGB format/form/database for this information.

Q4. Clarification; "Part 51 of Michigan’s General Industry Safety and Health Standard" refers to logging. (LEO - General Industry Safety and Health Standards)

A4. Please disregard.

Dated: 7-29-2026

Q5. FAR 52.212-2 requires information for at least two similar contracts completed within the last two years and refers to the offeror’s past performance.

-----------has zero completed federal prime contracts. May------------submit clearly attributed recent comparable contracts performed by a committed first-tier backflow/cross-connection specialist, supported by a commitment letter and references? If not, will----------- receive neutral treatment for lacking prime past performance?

A5. No commitment letter and references will be needed. Having no past performance will not result in neutral treatment.

https://www.michigan.gov/leo/bureaus-agencies/miosha/standards/standards-and-interpretations/general-industry-safety-and-health-standards https://www.michigan.gov/leo/bureaus-agencies/miosha/standards/standards-and-interpretations/general-industry-safety-and-health-standards

Q6. CLINs 0001 and 0002 appear to contain identical descriptions, quantities and delivery information. Please identify the intended distinction between the two CLINs and how each should be priced.

A6. This is for invoicing purposes. Split the total between the two CLINS.

Q7. May qualified proposed first-tier subcontractor attend the optional site visit on behalf? requests a site visit and will provide the attendee’s verified legal name and access information once the local specialist is confirmed. Please identify the visit date/time and attendee-registration requirements.

A7. Your company can have anyone you like represent at the site visit on your behalf, provided they can be vetted. A site visit will be held on Aug 13 at 1pm local time. This will be added to the solicitation by Amendment. In order to attend the site visit I will need an email to (tami.mckenney.1@us.af.mil) no later than 5 August at 10am, to include:

• Company Name

• Full name: First, middle initial, Last

• Date of Birth

• Drivers license number

• Citizenship (must be USA)

Dated: 8-12-2026

Q8. For the 184 known backflow devices, where are the completed testing results required to be entered or submitted? Is there a specific online reporting system or portal that the contractor will be required to use, such as through Harrison Township, or are the results only required to be provided directly to Selfridge ANGB as part of the final report?

A8. Provided directly to Selfridge ANGB as part of the final report, can be submitted to the COR/POC.

mailto:tami.mckenney.1@us.af.mil