04_VGLZ_242004_Form_AF_66_03_15_24.xls

XLS spreadsheet 47 KB Posted

Attached to
VGLZ242004 Replace MV Transformers TP170A and T170B.
Solicitation number
W50S8524B0013
Issued by

About this file

This document is a Schedule of Material Submittals (AF Form 66 Modified) for the project titled "Repair medium voltage transformer - TP170A and T170B" under Solicitation/Contract No. VGLZ 242004.

The key details are: The project requires the submittal of various items including deadfront loopfeed fused medium voltage transformers with primary and secondary copper windings and lighting/surge arrestors, copper cables, junction boxes, grounding system, breakers, fuses, and conduits. The contractor is required to submit shop drawings, samples, manufacturer's recommendations and warranties, and other related material and data submittals within 14 days after Notice to Proceed. The project is part of a larger federal contract opportunity under Solicitation No. W50S8524B0013, which is a 100% Small Business set-aside with a NAICS code of 237130 (Power and Communication Line and Related Structures) and a project magnitude between $250,000 to $500,000. The contract is being awarded by the Department of the Army Michigan Army National Guard, and prospective bidders are encouraged to attend a pre-bid conference and site visit.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242004Repair medium voltage transformer – TP170A and T170B
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1SANGB Form 23
2Recycling and Disposal Form
3Deadfront loopfeed fused MV transformerS with primary and secondary copper windings and lighting/surger arrestors
4DD Form 1354XX
5Product specification cut-sheetsxXXXXXXX
6Product Safety Data Sheetsxxxxxxxx
7Warranty of workxX
8Deadfront loopfeed fused outdoor MV transformers with primary and secondary copper windings and lighting/surger arrestorsxxxxxx
9Copper Cablesxxxxxx
10Pull Boxes, Junction Boxes and all raceways and hardwaresxxxxxx
11Grounding system/new grounding planxxxxxx
12new power planxxxxxx
13grounding materials including copper ground rods, copper ground cables, test wells, exothrmic weldxxxxxx
14Breakersxxxxxx
15Fuses for load break switch and transformersxxxxxxx
16Fused cut outxxxxxx
17Disconnectxxxxxx
18RGS, PVC and EMT conduitsxxxxxx
19Certified signed test reportsx
20Certified signed factory test reportsx
21
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242004Repair medium voltage transformer – TP170A and T170B
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
15/15 Kv Copper cablesxxxxxx
2600 volt THHN copper cablesxxxxxx
3Deadfront loopfeed fused MV transformerS with primary and secondary copper windings and lighting/surger arrestorsxxxxxx
4lighning arrestors/surge arrestors
5copper ground rodsxxxxxx
6test wellsxxxxxx
7copper ground cablesxxxxxxx
Deadfront loopfeed fused outdoor MV transformers with primary and secondary copper windings and lighting/surger arrestors
xxxxx
Grounding system/new grounding plan
xxxxxx
grounding materials including copper ground rods, copper ground cables, test wells, exothrmic weldxxxxxx
Fuses for load break switch and transformersxxxxxxx
Fused cut out
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242004Repair medium voltage transformer – TP170A and T170B
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
Deadfront loopfeed fused MV transformerS with primary and secondary copper windings and lighting/surger arrestors
x
Deadfront loopfeed fused outdoor MV transformers with primary and secondary copper windings and lighting/surger arrestors
xxxxx
1Grounding system/new grounding plan
2xxxxxx
grounding materials including copper ground rods, copper ground cables, test wells, exothrmic weldxxxxxx
Fuses for load break switch and transformersxxxxxxx
Fused cut out
1
2
3
4
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242004Repair medium voltage transformer – TP170A and T170B
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

File details come from the government source that posted it. Updated .