04_VGLZ_242004_Form_AF_66_03_15_24.xls
XLS spreadsheet 47 KB Posted
- Solicitation number
- W50S8524B0013
About this file
This document is a Schedule of Material Submittals (AF Form 66 Modified) for the project titled "Repair medium voltage transformer - TP170A and T170B" under Solicitation/Contract No. VGLZ 242004.
The key details are: The project requires the submittal of various items including deadfront loopfeed fused medium voltage transformers with primary and secondary copper windings and lighting/surge arrestors, copper cables, junction boxes, grounding system, breakers, fuses, and conduits. The contractor is required to submit shop drawings, samples, manufacturer's recommendations and warranties, and other related material and data submittals within 14 days after Notice to Proceed. The project is part of a larger federal contract opportunity under Solicitation No. W50S8524B0013, which is a 100% Small Business set-aside with a NAICS code of 237130 (Power and Communication Line and Related Structures) and a project magnitude between $250,000 to $500,000. The contract is being awarded by the Department of the Army Michigan Army National Guard, and prospective bidders are encouraged to attend a pre-bid conference and site visit.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242004 | Repair medium voltage transformer – TP170A and T170B | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER
NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | ||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||
| 1 | SANGB Form 23 | ||||||||||||
| 2 | Recycling and Disposal Form | ||||||||||||
| 3 | Deadfront loopfeed fused MV transformerS with primary and secondary copper windings and lighting/surger arrestors | ||||||||||||
| 4 | DD Form 1354 | X | X | ||||||||||
| 5 | Product specification cut-sheets | x | X | X | X | X | X | X | X | ||||
| 6 | Product Safety Data Sheets | x | x | x | x | x | x | x | x | ||||
| 7 | Warranty of work | x | X | ||||||||||
| 8 | Deadfront loopfeed fused outdoor MV transformers with primary and secondary copper windings and lighting/surger arrestors | x | x | x | x | x | x | ||||||
| 9 | Copper Cables | x | x | x | x | x | x | ||||||
| 10 | Pull Boxes, Junction Boxes and all raceways and hardwares | x | x | x | x | x | x | ||||||
| 11 | Grounding system/new grounding plan | x | x | x | x | x | x | ||||||
| 12 | new power plan | x | x | x | x | x | x | ||||||
| 13 | grounding materials including copper ground rods, copper ground cables, test wells, exothrmic weld | x | x | x | x | x | x | ||||||
| 14 | Breakers | x | x | x | x | x | x | ||||||
| 15 | Fuses for load break switch and transformers | x | x | x | xx | x | x | ||||||
| 16 | Fused cut out | x | x | x | x | x | x | ||||||
| 17 | Disconnect | x | x | x | x | x | x | ||||||
| 18 | RGS, PVC and EMT conduits | x | x | x | x | x | x | ||||||
| 19 | Certified signed test reports | x | |||||||||||
| 20 | Certified signed factory test reports | x | |||||||||||
| 21 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242004 | Repair medium voltage transformer – TP170A and T170B | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||||||
| APPROVAL | REMARKS | |||||||||||
| APPROVED | DISAPPROVED | |||||||||||
| 1 | 5/15 Kv Copper cables | x | x | x | x | x | x | |||||
| 2 | 600 volt THHN copper cables | x | x | x | x | x | x | |||||
| 3 | Deadfront loopfeed fused MV transformerS with primary and secondary copper windings and lighting/surger arrestors | x | x | x | x | x | x | |||||
| 4 | lighning arrestors/surge arrestors | |||||||||||
| 5 | copper ground rods | x | x | x | x | x | x | |||||
| 6 | test wells | x | x | x | x | x | x | |||||
| 7 | copper ground cables | x | x | x | x | x | x | x | ||||
| Deadfront loopfeed fused outdoor MV transformers with primary and secondary copper windings and lighting/surger arrestors | ||||||||||||
| x | x | x | x | x | ||||||||
| Grounding system/new grounding plan | ||||||||||||
| x | x | x | x | x | x | |||||||
| grounding materials including copper ground rods, copper ground cables, test wells, exothrmic weld | x | x | x | x | x | x | ||||||
| Fuses for load break switch and transformers | x | x | x | xx | x | x | ||||||
| Fused cut out |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242004 | Repair medium voltage transformer – TP170A and T170B | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||||||
| APPROVAL | REMARKS | |||||||||||
| APPROVED | DISAPPROVED | |||||||||||
| Deadfront loopfeed fused MV transformerS with primary and secondary copper windings and lighting/surger arrestors | ||||||||||||
| x | ||||||||||||
| Deadfront loopfeed fused outdoor MV transformers with primary and secondary copper windings and lighting/surger arrestors | ||||||||||||
| x | x | x | x | x | ||||||||
| 1 | Grounding system/new grounding plan | |||||||||||
| 2 | x | x | x | x | x | x | ||||||
| grounding materials including copper ground rods, copper ground cables, test wells, exothrmic weld | x | x | x | x | x | x | ||||||
| Fuses for load break switch and transformers | x | x | x | xx | x | x | ||||||
| Fused cut out | ||||||||||||
| 1 | ||||||||||||
| 2 | ||||||||||||
| 3 | ||||||||||||
| 4 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242004 | Repair medium voltage transformer – TP170A and T170B | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 | ||||||
| 0 |
File details come from the government source that posted it. Updated .