Pre-Bid Conference_Site Visit W50S8524B0012 (1).pdf
PDF 316 KB Posted
- Solicitation number
- W50S8524B0012
About this file
This document is a pre-bid conference agenda for a federal contract opportunity to REPAIR MV TRANSFORMER TP1414 - BUILDING 1414 at Selfridge ANG Base, Michigan. The solicitation number is W50S8524B0012 with a NAICS code of 237130 Power and Communication Line and Related Structures.
The key details are:
- Project Magnitude: $500,000 - $1,000,000
- Period of Performance: 360 calendar days after Notice to Proceed
- Set-Aside: 100% Small Business
- Pre-Bid Conference and Site Visit are required for prospective bidders
- Sealed bids are required, with a public bid opening
- Award will be made to the lowest priced, responsive, and responsible small business bidder
- Bid bond of 20% of the bid price is required for offers over $150,000
- DFARS 252.204-7020 NIST SP 800-171 DoD Assessment is required prior to award
- The contracting agency is the Michigan Army National Guard.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Selfridge ANG Base Pre-Bid Submission Meeting and Site Visit
• Project # VGLZ212031 "
REPAIR MV TRANSFORMER
TP1414 - BUILDING 1414"
• Solicitation: W50S8524B0012
31 July 2024
Integrity – Excellence – Service
Agenda
• Admin Matters/Contact info
• Process for Questions and Answers (Requests for Information)
• Project Overview
• Notable Items
• Bid Schedule
• Sealed Bid Requirements and procedures for submission of bids
• Determination of Responsibility
• Small Business Subcontracting Plan
• Questions
Administrative Matters - Attendance Roster
• Ensure you sign the attendance roster
• We plan to post the roster and this power point presentation on https://sam.gov to facilitate communication amongst potential suppliers and subcontractors.
• No other site visits will be granted.
Contact Information
• Contracting Officer
Mr. Steven Stocking steven.stocking.2@us.af.mil
• Contracting Specialist Ms. Anna Randall anna.randall.1@us.af.mil mailto:jeremy.starrett.1@us.af.mil mailto:steven.stocking@us.af.mil
Process for Questions and Answers
• Submit questions (aka Requests for Information) to Steven Stocking and Anna Randall. See Section 00 21 00 for instructions.
• Questions and Answers will be posted on SAM.gov on a non attributional basis with solicitation at https://sam.gov
• Submit questions not later than the fifth working day prior to bid opening.
• Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment.
https://sam.gov/
Project Overview
• Title: VGLZ242003Replace leaking medium voltage transformer T781.
• Magnitude:$500,000-$1,000,000
• A firm fixed price contract will be awarded to the lowest price, responsive, and responsible small business sealed bid offer
• Performance Period: 360 calendar Days after issuance of Notice to Proceed.
• The Notice to Proceed will be issued after formal approval of applicable bonds.
Project Overview
The contractor shall Remove/ Replace existing three (3) transformers are pole mount type mounted on the ground, Install/ Construct new 5/15 kV electric Service, including new concrete pad, one (1) new manhole, Concrete encased duct bank, new Pad mounted loop feed dead front fused 750 KVA, 5/15 kV 3-phaseTransformer,new 5/15kv dead front loop feed fused load break switch, and new grounding system per drawing and specifications. The Contractor shall also obtain digging permits for all underground work including but not limited to demotion work and installation of new duct bank, installation of new concrete pads, and excavation, back filling or soil boring installation of new conduits, new steel reinforced concrete duct bank, new ground rods, new ground loop, new concrete pads for all equipment, and new bollards. At the conclusion of the project, the contractor shall be responsible for preparing as built construction documents on completion of project
Notable Items
Brand Name Requirements: Model G981682 Itron Centron Polyphase electric meter
DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements
- Contracting Officer shall verify..... prior to award (DFARS 204.7303 (b)(1))
- Complete the Assessment in the Supplier Performance Risk System (SPRS)
Request the SPRS vendor role: https//:piee.eb.mil
SPRS Access and NIST Quick Entry Guide:
https://www.sprs.csd.disa.mil/pdf/NISTSP800-171QuickEntryGuide.pdf
SPRS Frequently Asked Questions: https://www.sprs.csd.disa.mil/faqs.htm#nist
Bid Schedule
• CLIN 0001 – Non-Personal Services: Provide all plant, labour, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance, and supervision necessary to complete the work in VGLZ 212031 " REPAIR MV TRANSFORMER TP1414 - BUILDING 1414". All work shall be in accordance with the plans, drawings, specifications, and all applicable terms and conditions
Sealed Bid Procedures
The following is a brief overview of the sealed bid requirements:
• BIDDERS ARE STRONLY CAUTIONED TO CAREFULLY READ THE
REQUIREMENTS OF THE SOLICIATION AND COMPLY ACCORDINGLY
REFER TO THE SOLICITATION AND FAR 14 FOR DETAILS.
• Public bid opening occurs. Prices are read to the public. There will be no discussion.
• Bidders must submit sealed bids to be opened at the time and place stated int the solicitation for the public opening of bids
• After bids are publicly opened an award will be made to that responsible bidder whose bid conforming to the IFB will be most advantageous to the Government considering only price and price related factors.
• The bid abstract will be certified and posted on SAM.gov as soon as practicable.
Bid Requirements
• SF 1442, (Blocks 14-20c)-Do not enter less than 120 days in block 17
• Section 00010. Bid Schedule—all items must be priced.
• IAW Clause 252.236-7008, Contract Prices-Bidding Schedules (Dec
1991) the prices shown in the bidding schedule must reflect ALL COSTS involved in performing the work, as described in the plans and specifications.
• Reps and Certs (00 45 00): In addition, the bidder must have entered current and complete data within the past year via the Online Representatives and Certifications at https://sam.gov
• Acknowledge all amendments issued on an SF 30 on page 2 of SF1442 and/or by providing signed SF 30s with bid.
• Bid Bond/Guarantee for offers over $150K shall be 20% of the complete bid price and be issued the most recent edition of the SF 24 with a complete power of attorney.
http://www.sam.gov/
Bid Requirements-Bid Submission
• The bid opening will occur at the date and time specified on Block 13 of the SF 1442 at Selfridge Air National Guard Base, MI Bldg. 105
• Hand carried bids must be dropped off prior to the time established for the opening of bids. A Base access form must be generated for individuals attending the bid opening or to drop off bids.
• Mailed bids must be received at the location specified on block 7 prior to the time established for opening of bids.
• Mailing address:
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
• Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and the clause at FAR 52.214-7
Determination of Responsibility
• IMPORTANT: REFER TO THE SOLICIATATION AND FAR
PART 9 FOR DETAILS
• To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
Subcontracting Plan
• N/A: A Subcontracting Plan is not needed for this requirment.
Questions?
Questions will not be answered at the site visit.
Please ensure that the Request for Information process is utilized.
| Selfridge ANG Base�Pre-Bid Submission Meeting and Site Visit |
| Agenda |
| Administrative Matters -�Attendance Roster |
| Contact Information |
| Process for Questions and Answers |
| Project Overview |
| Project Overview |
| Notable Items |
| Bid Schedule |
| Sealed Bid Procedures |
| Bid Requirements |
| Bid Requirements-Bid Submission |
| Determination of Responsibility |
| Subcontracting Plan |
| Questions? |
File details come from the government source that posted it. Updated .