SELFRIDGE ANGB, MICHIGAN REPAIR EXTERIOR ENVELOPE BUILDING 507
VGLZ232004
TEMPORARY UTILITIES
01 51 00 - 1
SECTION 01 51 00 - TEMPORARY UTILITIES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Temporary Utilities: Electricity, lighting, heat, ventilation, telephone service, water and sanitary facilities.
PART 2 - PRODUCTS
2.1 RELATED SECTIONS
A. Section 01 00 00, Requirements of Selfridge Air National Guard Base.
B. Section 01 50 00, Construction Facilities and Temporary Controls.
C. Section 01 52 13, Field Offices and Sheds.
D. Section 01 77 00, Project Closeout: Final cleaning.
2.2 TEMPORARY ELECTRICITY
A. If the Contractor deems temporary electric service is necessary, it shall be metered and will be charged to the contractor at prevailing rates.
B. The temporary electric service shall originate from the nearest available power pole and coordinated with the Contracting Officer’s Representative.
C. The electrical contractor shall be responsible for furnishing and installing all fused cutouts, meter, transformers, primary and secondary conductors, disconnects, and miscellaneous hardware.
2.3 TELEPHONE SERVICE
A. Telephone Service is not available on this site.
2.4 FACSIMILE SERVICE
A. Facsimile Service is not available on this site.
2.5 TEMPORARY WATER SERVICE
SELFRIDGE ANGB, MICHIGAN REPAIR EXTERIOR ENVELOPE BUILDING 104
VGLZ232023
TEMPORARY UTILITIES
01 51 00 - 2
A. Water is not available on this site. The Contractor shall be responsible to provide his own water for construction and personal use.
2.6 TEMPORARY SANITARY FACILITIES
A. The Contractor shall provide, maintain, and pay for required facilities and enclosures for use by construction personnel.
B. Existing facilities may not be used during construction operation.
C. Provide facilities at time of project mobilization.
D. Provide regular maintenance service to maintain facilities in a clean and sanitary condition.
2.7 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
1. Comply with work restrictions specified in Section 01 10 00, Summary of Work.
B. Temporary Erosion and Sedimentation Control: Comply with requirements of 2003 EPA
Construction General Permit or authorities having jurisdiction, whichever is more stringent and requirements specified in Section 31 10 00, Site Clearing, and Section 01 57 19, Environmental Protection.
C. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to undisturbed areas and to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings CE 100 and requirements of 2003 EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent.
1. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross tree- or plant- protection zones.
2. Inspect, repair, and maintain erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
3. Clean, repair, and restore adjoining properties and roads affected by erosion and sedimentation from the project site during the course of the project.
4. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.
D. Stormwater Control: Comply with requirements of authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains. Provide baro prevent runoff into local waterways.
END OF SECTION