W50S85-22-B-0004 _ Amendment 01.pdf
PDF 400 KB Posted
- Attached to
- Repair Hangar 36 Federal contract opportunity
- Solicitation number
- W50S85-22-B-0004
About this file
This document contains an amendment to a solicitation and related federal contract opportunity. The amendment updates the wage determination section to include a new General Decision Number for building construction projects in Macomb County, Michigan.
The federal contract opportunity is for repair work at Hangar 36 at Selfridge Air National Guard Base in Michigan. The work includes installing electrical, water, compressed air and exhaust systems for various equipment, as well as installing a new 2.5 ton heat pump. The solicitation is a 100% small business set-aside and seeks firm fixed price proposals for a 180-day period of performance, with an estimated value between $250,000 and $500,000. The soliciting agency is the Department of the Army Michigan Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening _W50S8522B0004 _ Sign In Sheet.pdf | ||
| Bid Opening Abstract _Hangar 36_W50S85-22-B-0004_23Aug22_1.pdf | ||
| Pre-Bid _ Meeting _ Minutes _ W50S85-22-B-0004 Hangar 36 Test Stand.pdf | ||
| Sign In _ Pre-Bid Conference _ W50S85-22-B-0004 Hangar 36 Test Stand.pdf | ||
| Solicitation _ W50S85-22-B-0004 _Repair Hangar 36.pdf | ||
| General Construction Requirements.pdf | ||
| Plans VGLZ 202019 _ Repair Hangar 36 _ 2 Sheets _ 10Feb2022.pdf | ||
| Selfridge Base Vetting 2022.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F8Y36P2031A001 VGLZ 202019
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 01 is to update the General Decision Number_ Wage Determination to: MI20220091 08/05/2022 (Building _ Macomb County, Michigan)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8522B0004
X 9B. DATED (SEE ITEM 11)
19-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2022
CODE
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
W50S85 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8522B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE
"General Decision Number: MI20220091 08/05/2022
Superseded General Decision Number: MI20210091
State: Michigan
Construction Type: Building
County: Macomb County in Michigan.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,|
| | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022 2 02/25/2022 3 06/24/2022 4 07/15/2022 5 08/05/2022
ASBE0025-002 06/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 35.41 32.91
BOIL0169-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 35.95 34.52
BRMI0001-001 06/01/2020
Rates Fringes
BRICKLAYER.......................$ 36.24 22.74
TILE FINISHER....................$ 28.58 20.45
TILE SETTER......................$ 35.71 20.45
CARP0687-003 06/01/2021
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold
Building)........................$ 35.16 29.22
CARP1045-001 06/01/2020
Rates Fringes
CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 30.60 24.58
CARP1102-002 06/01/2020
Rates Fringes
MILLWRIGHT.......................$ 35.30 34.10
ELEC0058-001 07/21/2021
Rates Fringes
ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 30.12 14.57 Technician..................$ 37.62 14.80
ELECTRICIAN......................$ 45.17 26.01
ELEV0036-002 01/01/2022
Rates Fringes
ELEVATOR MECHANIC................$ 57.35 36.885+a+b
ENGI0324-017 06/01/2022
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 46.44 24.95
GROUP 2....................$ 44.94 24.95
GROUP 3....................$ 43.44 24.95
GROUP 4....................$ 43.14 24.95
GROUP 5....................$ 42.32 24.95
GROUP 6....................$ 41.46 24.95
GROUP 7....................$ 40.49 24.95
GROUP 8....................$ 38.78 24.95
GROUP 9....................$ 30.44 24.95
FOOTNOTES:
Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.
Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom and jib or leads 400' or longer
GROUP 2: Crane with boom and jib or leads 300' or longer
GROUP 3: Crane with boom and jib or leads 220' or longer
GROUP 4: Crane with boom and jib or leads 140' or longer
GROUP 5: Crane with boom and jib or leads 120' or longer
GROUP 6: Regular crane operator, and concrete pump with boom operator
GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher
GROUP 8: Forklift & extend-a-boom forklift
GROUP 9: Oiler
IRON0025-019 06/01/2019
Rates Fringes
IRONWORKER
REINFORCING.................$ 30.98 27.99
STRUCTURAL..................$ 36.77 29.03
IRON0025-022 06/01/2019
Rates Fringes
IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 36.77 29.03
LABO0259-002 08/01/2021
Rates Fringes
LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 31.63 14.47
LABO0334-005 06/01/2022
Rates Fringes
LABORER: Landscape &
Irrigation
GROUP 1.....................$ 23.82 7.60
GROUP 2.....................$ 21.60 7.60
CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
LABO1191-002 06/01/2022
Rates Fringes
LABORER
Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;
Pipelayer; Sandblaster......$ 29.95 16.95
PAIN0022-003 06/01/2015
Rates Fringes
PAINTER: Brush and Roller.......$ 26.06 17.66 PAINTER: Drywall Finishing/Taping.................$ 27.05 18.26 PAINTER: Spray..................$ 26.86 17.66
PAIN0357-002 06/01/2022
Rates Fringes
GLAZIER..........................$ 37.15 20.98
PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;
provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.
PLAS0067-001 04/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07
PLAS0067-004 04/01/2014
Rates Fringes
PLASTERER........................$ 30.63 14.07
PLUM0098-001 06/01/2022
Rates Fringes
PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 35.24 37.44
PLUM0636-003 06/05/2022
Rates Fringes
PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 41.60 29.35
ROOF0149-001 07/01/2021
Rates Fringes
ROOFER...........................$ 38.16 25.91
SFMI0704-001 08/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 46.13 30.99
* SHEE0080-004 06/01/2022
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation;
Excluding HVAC System Installation)....................$ 47.64 26.15
TEAM0247-002 06/01/2018
Rates Fringes
TRUCK DRIVER
GROUP 1
Dump; Flatbed; Pickup......$ 26.71 0.70+a
GROUP 2
Semi.......................$ 26.86 0.70+a
GROUP 3
Lowboy.....................$ 26.96 0.70+a
PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.
FOOTNOTE:
a. $456.70 per week, plus $67.10 per day.
* SUMI2011-016 02/01/2011
Rates Fringes
INSTALLER - OVERHEAD DOOR........$ 27.98 0.00
IRONWORKER, ORNAMENTAL...........$ 18.48 7.93
TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 ** 1.18
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
(End of Summary of Changes)
File details come from the government source that posted it. Updated .