Pre-Bid _ Meeting _ Minutes _ W50S85-22-B-0004 Hangar 36 Test Stand.pdf

PDF 562 KB Posted

Attached to
Repair Hangar 36
Solicitation number
W50S85-22-B-0004
Issued by

About this file

This document outlines the pre-bid meeting minutes for solicitation number W50S85-22-B-0004 to repair Hangar 36 at Selfridge Air National Guard Base. The scope of work includes providing electrical, water, compressed air and exhaust systems for government furnished equipment, installing a new low ambient heat pump, and has a performance period of 180 calendar days. The opportunity is set aside for small businesses under NAICS code 236220 for commercial and institutional building construction, with a magnitude between $250,000 and $500,000. Bids are due no later than August 23, 2022 and the pre-bid meeting provided an overview of the project and site visit. Safety requirements outlined in the Army Corps of Engineers manual and MIOSHA standards apply.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHIGAN AIR NATIONAL GUARD

127th MISSION SUPPORT GROUP

SELFRIDGE ANG BASE MICHIGAN

5 August 2022

MEMORANDUM FOR RECORD

FROM: 127 MSC

Contracting Division 43200 Maple St, Bldg. 105 Selfridge ANGB, MI 48045-5213

SUBJECT: Pre-Bid Conference for Solicitation W50S85-22-B-0004, Project No. VGLZ 202019

- Selfridge ANGB, MI – Hangar 36 – Test Stand.

1. Site visit held this date at Selfridge ANGB, MI Commencing at 10:00 AM ET in conjunction with interested contractors. For list of attendees see sign in sheet.

2. MSgt Bradley Moehlig, and 127th CE (Engineering) introduced themselves.

A. PROJECT DESCRIPTION:

Set Aside: 100% Set Aside for Small Business’s with the NAICS Code 236220 “Commercial and Institutional Building Construction”

-Prime Contractor must hold NAICS Code 236220, in order to receive an award.

-If you are in the process of renewing within SAM.gov, please call SAM.gov, and check on the progress of the renewal. Something has changed, and it’s currently taking SAM.gov months to renew.

-Contractors advised of PTACS of Michigan. http://www.ptacsofmichigan.org/

-Contractors must have an “Active Registration” within SAM.gov, at the time of award, in order to be awarded a project.

3. The project’s scope of work consists of: to provide electrical power supply, water supply, compressed air, exhaust system for Gov't furnished StringRay Parts Washer, Hydraulic Component Test Stand – HCT-12 (MHC and P&MTC) and electrical power supply for four (4) Maintenance stands. The work includes the installation of new 2.5 tons low ambient heat pump.

4. Bids are due NLT 23 August 2022 at 10:00 AM ET. A public bid opening will take place at Selfridge ANGB, MI. Bids are to be deposited in the bid repository by the due date and time.

a. Facsimile transmission of bid is NOT authorized. Electronic submission of bids will NOT be accepted.

b. If mailing your Bid, please allow extra time for Delivery to the Bid Repository. Because your tracking number says it’s been ‘delivered’ to Selfridge, does not mean it’s been delivered to “Contracting” or the “Bid Repository”.

c. A Complete Bid Package should contain the following: (See Instructions to Offerors)

(a) Offer, Standard Form (SF) 1442 front and back signed

(b) Section 00010 Line Items- all items must be priced

(c) An Original Bid Bond and original Power of Attorney is required along with the bid on the due date.

NOTE: An Original Bid bond and Original Power of Attorney is required with submission of the bid. The bid bond is due on the date as stated on the SF1442 block 13.

The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section. In addition, the Offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.

(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.

(f) All amendments to the solicitation must be acknowledged. Amendments are posted to sam.gov under “Contract Opportunities”. I would advise anyone against utilizing Local Plan rooms as your source of information, as they DO NOT keep you up to date with amendments to the solicitation.

(g) Mark the front of the envelope with the following: “BID No. W50S85-22-B-0004, “Hangar 36”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.

(h) A formatted disk (CD) containing your bid submission. The formatted disk bid documents will not be accessed by the government until after public bid opening has occurred. Files on the formatted disk are for electronic records keeping only. (no .ZIP files) .

d. Magnitude of project is between $250,000 and $500,000

e. After the notice to proceed is issued the project has a performance time of 180 calendar days for project completion.

f. A Site Visit was held immediately after this pre-proposal conference at the construction site.

g. Payment Bond/ Performance Bond will be required for this project. (Bid Bond, Performance Bond, Payment Bond.)

h. Liquidated damages are not included in this project.

i. Warranty of Construction clause is incorporated and applies to this project.

j. The most current wage determination is incorporated into the solicitation and will be made part of the resultant contract but it is the contractor's responsibility to keep track of the most current wage rate. Selfridge ANGB, MI – Macomb County – 48045 “Building”.

k. Safety measures are always a part of Government contracts and the Army Corp of Engineers manual is incorporated in the contract as well as MIOSHA.

l. RFI procedures were reviewed as follows:

i. Email technical questions in RFI format to Contracting Office for resolution.

ii. All RFI questions and answers posted to “Contracting Opportunities”, as soon as possible.

m. Please recall that only the Contracting Officer can approve changes such as price, schedule, specifications, and clauses with formal written notice typically in the form of a solicitation amendment or task order modification. Work undertaken regarding changes not formally approved by the Contracting Officer (save for COR approved no cost field changes) is at the Contractor’s risk.

n. Army Core of Engineers and MIOSHA Safety requirements are incorporated into this contract.

o. This requirement is Funded.

5. The project description was stated in the “Contracting Opportunities” announcement package W50S85-22-B-0004.

6. Contractors were briefed that the project is within Michigan and the Selfridge ANGB Base follows/complies with all active Michigan Governor’s Executive Orders relating to COVID-19 and the project is deemed as mission essential.

7. All/ all project specific questions were referred to the RFI submittal process no later than 11 August 2022, 2:00 p.m ET. . It was advised that any changes would be issued with an addendum.

8. It is extremely important to submit all requirements within BID, and review the Instructions to Offerors.

9. The site visit concluded at on Thursday 5 August 2022 @ 1100 hours.

BRADLEY M. MOEHLIG