F8Y36P1034AW02 VGLZ 212008

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make the follow ing changes In accordance w ith the enclosed Summary of Changes.

1. Incorporate a heavily revised Statement of Work into the terms and conditions of this solicitation any subsequent purchase order.

2. A second site vist has been scheduled for 10 September 2011 at 11:00 am.

3. The due date for proposals is extended to 16 September. The time proposals are due remain unchanged.

4. The Wage Deterimination is updated to : MI20210001 09/03/2021

5. There are no other changes and all other terms and conditions shall remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 41

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8521R0006

X 9B. DATED (SEE ITEM 11)

13-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2021

CODE

USPFO MI 127 MISSION SUPPORT CONTRACTING

43200 MAPLE ST

SELFRIDGE ANGB MI 48045-5213

W50S85 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8521R0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 10-Sep-2021 10:00 AM to 16-Sep-2021 10:00 AM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 10 September at 11:00 AM local time.

(c) Participants will meet at-- 43200 Maple Street Bldg 105 – Conference Room Selfridge ANGB, MI 48045

(End of provision)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

SOW

SELFRIDGE ANG BASE MICHIGAN

STATEMENT OF WORK (SOW)

Project Number, Title: VGLZ 212008 Repair Airfield Gates A25, A26 & A29 18 November 2020

1.0 GENERAL INSTALLATION REQUIRMENTS:

The General Specifications and Selfridge Design Standards 10 Nov 2017 apply to this Statement of Work (SOW).

The work shall be in strict compliance with those specifications and the requirements identified in this SOW and its attachments. Sections of this SOW may supersede the requirements of the specifications, in which case the more stringent/higher quality requirements shall apply.

Several motor-driven gates (A-25, A-26 & A-29), used to control access to the airfield, are significantly worn and inoperable. The condition of the gates are as a result of the age of the gates and the severe weather conditions the gates are exposed to. The disrepair of the gates causes accessibility to the airfield to be unreliable. Gate related parts that have reached the end of their lifetime should be identified and replaced to improve reliability of access to the airfield.

2.0 DESCRIPTION OF SERVICES:

Work to be accomplished under this contract includes, but is not limited to:

2.1. Investigation of airfield gates (A-25, A-26 & A-29), including gate foundations, to identify all gate related parts that are causing the individual gates to be inoperable and/or unreliable.

2.2. Derive a plan to permanently repair the gates so that reliable functionality of gates is restored. The plan shall meet the minimum requirements outlined in Part 3 herein and shall conform to relevant codes and standards outlined in Part 5 herein.

2.3. Implement the repair plan so that the subject airfield gates are repaired and operable. It shall be the sole responsibility of the contractor to ensure at least one gate, of the three gates, remain operational at all times while the contractor performs gate repairs outlined herein. “Operational” means a gate shall be capable of being both electromechanically and manually operated, as normal, by Selfridge personnel.

3.0 SCOPE OF WORK:

The Contractor shall provide all labor, supervision, equipment, and materials necessary to support all work under this contract. All hardware used in gate repairs shall be graded sufficiently to withstand the secured load without shearing and/or bending.

The Contractor shall obtain Government approval prior to executing gate repairs.

Airfield Gate A-25:

3.1. Inspect existing gate foundations to ensure in-place strength of foundation is sufficient to hold the load / weight of the gate, to be newly installed, and associated equipment. During Government inspection, the Government noted at least one gate foundation is heaved from the ground. The contractor shall be responsible to verify that all existing foundations are securely in-tact in the ground prior to installation of any new equipment to said gate foundations. All gate foundations that are weak and/or heaved from the ground shall be repaired and/or replaced.

Repaired and/or replaced foundations shall be subject to a strength test prior to a load / weight being connected to the foundation.

3.2. Replace the existing gate operator with a new fully enclosed and weatherproof electromechanical gate operator. The operator must be compatible with the sliding cantilever gate to be installed per section 3.3. The new gate operator must comprise of at least:

3.2.1. one controller, configured with the following features:

3.2.1.1. programmed with built in diagnostic capabilities and configured to display a plurality of error codes.

3.2.1.2. programmed to allow gate activation from at least 40 different access control transmitters.

3.2.2. a new chain drive and hardware.

3.2.3. a manual disconnect configured to allow an operator to freely move the gate in the event of an electrical failure / fault.

3.2.4. an electrical coil brake system

3.2.5. a motor sized appropriately to drive the load

3.2.6. two loop detectors that are compatible with the new gate operator and must have adjustable levels of sensitivity for vehicle detection.

3.3. Replace the existing gate with a new sliding cantilever gate that includes at least:

3.3.1. A new, black powder coated, sliding cantilever gate. Black powder coat finish is required per standard 5.1.1.

specified below. The black powder coat color shade should align with existing fencing as much as reasonably possible.

3.3.2. An aluminum, black powder coated, wind bar that allows the gate to resist bending forces associated with high winds. Black powder coat finish is required per standard 5.1.1. specified below. The black powder coat color shade should align with existing fencing as much as reasonably possible.

3.3.3. Replacement of all upper and lower bearings and associated hardware.

3.4. Replace keypad and route a new wire to new gate operator controller. Ensure the new gate operator controller and the new keypad are communicatively (i.e. electrically) coupled.

3.5. Replace two impact /collision sensors on lead side of gate. The new sensors shall be yellow colored (per UL 325 standard). The sensors shall be installed on the gate such that if an obstacle is encountered while the gate is in motion, the obstacle is immediately sensed and gate motion immediately stops. Ensure the new gate operator controller and the new impact / collision sensors are communicatively (i.e. electrically) coupled.

3.6. Replace vehicle detection loops embedded in roadway. This will require saw cutting into the roadway to remove existing loops and patching asphalt once loops are installed. Each vehicle detection (wire) loop shall be run within its own conduit, installed in the roadway, to the new gate operator controller.

3.7. Install Black Nylon-Coated mesh screening on one picket slide gate and sections of the fence line that the gate slides behind to eliminate hazardous entrapment areas and to prevent personnel reach through injuries (per UL 325). The Black Nylon-Coated mesh must be easy to see through for airfield security purposes.

3.8. **The contractor shall be responsible to return all gate parts, removed during gate repair efforts, to the Government**

Airfield Gate A-26:

3.9 Replace the existing wind bars with aluminum, square shaped tubing, black powder coated, wind bars that allows each gate to resist bending forces associated with high winds. Black powder coat finish is required per standard 5.1.1. specified below. The black powder coat color shade should align with existing fencing as much as reasonably possible.

3.10 Replace the existing master and slave gate operators with new fully enclosed and weatherproof electro-mechanical gate operators. The operators must be compatible with the existing sliding gate that is installed. Each new gate operator must comprise of at least:

3.10.1. one controller configured with the following features:

3.10.1.1. programmed with built in diagnostic capabilities and configured to display a plurality of error codes.

3.10.1.2. programmed to allow gate activation from at least 40 different access control transmitters

3.10.2. a new chain drive and hardware.

3.10.3. a manual disconnect configured to allow an operator to freely move the gate in the event of an electrical failure / fault.

3.10.4. an electrical coil brake system.

3.10.5. a motor sized appropriately to drive the load

3.10.6. two loop detectors (in master gate operator only) that are compatible with the new gate operator and must have adjustable levels of sensitivity for vehicle detection.

3.11 Replace keypad and route a new wire to new master gate operator controller. Ensure the new master gate operator controller and the new keypad are communicatively (i.e. electrically) coupled.

3.12 Replace / add two impact /collision sensors on lead side of each gate. The new sensors shall be yellow colored (per UL 325 standard). The sensors shall be installed on each gate leading edge such that if an obstacle is encountered while the gate is in motion, the obstacle is immediately sensed and respective gate motion immediately stops. Ensure the new gate operator controller and the new impact / collision sensors are communicatively (i.e.

electrically) coupled.

3.13 Replace vehicle detection loops embedded in roadway. This will require saw cutting into the roadway to remove existing loops and patching asphalt once loops are installed. Each vehicle detection (wire) loop shall be run within its own conduit, installed in the roadway, to the new gate operator.

3.14 Install Black Nylon-Coated mesh screening on both picket slide gates and sections of the fence line that the gate slides behind to eliminate hazardous entrapment areas and to prevent personnel reach through injuries (per UL 325). The Black Nylon-Coated mesh must be easy to see through for airfield security purposes.

3.15 **The contractor shall be responsible to return all gate parts, removed during gate repair efforts, to the Government**

Airfield Gate A-29:

3.16. Remove and replace the existing gate operator with a new fully enclosed and weatherproof electromechanical gate operator. The new gate operator must be compatible with the existing sliding gate that is installed. The new gate operator must comprise of at least:

3.16.1. one controller configured with the following features:

3.16.1.1. programmed with built in diagnostic capabilities and configured to display a plurality of error codes.

3.16.1.2. programmed to allow gate activation from at least 40 different access control transmitters.

3.16.2. a new chain drive and hardware.

3.16.3. a manual disconnect configured to allow an operator to freely move the gate in the event of an electrical failure / fault.

3.16.4. an electrical coil brake system

3.16.5. a motor sized appropriately to drive the load

3.16.6. two loop detectors that are compatible with the new gate operator and must have adjustable levels of sensitivity for vehicle detection.

3.17. Remove and replace the following parts of the existing gate with equivalent new parts:

3.17.1. Replacement of all upper and lower bearings and associated hardware.

3.18. Replace / add two impact /collision sensors on lead side of each gate. The new sensors shall be yellow colored (per UL 325 standard). The sensors shall be installed on each gate leading edge such that if an obstacle is encountered while the gate is in motion, the obstacle is immediately sensed and respective gate motion immediately stops. Ensure the new gate operator controller and the new impact / collision sensors are communicatively (i.e.

electrically) coupled.

3.19. Remove and replace vehicle detection loops embedded in roadway. This will require saw cutting into the roadway to remove existing loops and patching asphalt once loops are installed. Each vehicle detection (wire) loop shall be run within its own conduit, installed in the roadway, to the new gate operator.

3.20. Install Black Nylon-Coated mesh screening on one picket slide gate and sections of the fence line that gate slides behind to eliminate hazardous entrapment areas and to prevent personnel reach through injuries (per UL 325).

The Black Nylon-Coated mesh must be easy to see through for airfield security purposes.

3.21. **The contractor shall be responsible to return all gate parts, removed during gate repair efforts, to the Government**

3.22. The Contractor shall provide a minimum of 35 access control transmitters. Each access control transmitter shall be capable of wirelessly communicating with each gate operator controller to allow an authorized user gate access.

4 TESTING AND ACCEPTANCE:

4.1 The contractor shall notify the Government when ready to initiate gate testing, for each gate identified herein. The contractor shall provide necessary personnel and equipment to complete testing.

4.2 A performance verification test, otherwise known as acceptance testing, will be conducted by the contractor with the Government on-site to witness. The purpose of the acceptance test is to demonstrate that all installed equipment and components are performing according to system specifications and operational requirements per contract documents. The acceptance test should not reveal any operability problems (i.e. for instance, unusual noise or vibration) but if operability problems are observed, at the time of testing, the contractor shall be fully responsible to perform corrective action.

5 STANDARDS:

5.1 The project design shall conform to relevant codes and standards as set forth by the National Council of Governments on Building Codes and Standards, the Department of Defense, the National Guard Bureau, and Selfridge ANGB; including but not limited to the latest versions of the following criteria:

5.1.1. Selfridge Design Standards

5.1.2. ANGETL 15-01, ANG Design Policy

5.1.3. ANGETL 10-03, Design Objectives and Procedures

5.1.4. ANGETLs 15-01-01 through 15-01-08

5.1.5. UL 325 Standard

5.1.6. UFC 4-022-03, Security Fences and Gates

5.1.7. UFC 4-020-01, DoD Security Engineering Facilities Planning Manual

5.1.8. UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.

5.1.9. ASTM F2200, Standard Specification for Automated Vehicular Gate Construction

5.1.10. Occupational Safety and Health Administration Standards

6 WARRANTY:

6.1 The contractor shall warranty the installed gate components in accordance with manufacturer guidance for parts/components for a minimum 1 year period. The contractor shall respond to any gate performance problems for 12 months after the date of project completion.

6.2 Extended warranties offered by the Contractor and their subcontractors or suppliers may be accepted at the Government’s discretion.

6.3 The Contractor shall complete all inspection and commissioning requirements prior to government final inspection.

6.4 All O&M manuals shall be provided in digital PDF format. Additionally, the contractor shall provide one paper copy of the O&M manual.

7 QUALITY ASSURANCE:

7.1 The Contracting Officer Representative (COR) will assess the contractor’s performance through intermittent on-site inspections of the contractor’s quality control system. The Government may inspect each task as completed or increase the number of quality assurance inspections if deemed appropriate.

8 GOVERNMENT FURNISHED EQUIPMENT AND MATERIALS

8.1 There is no government-furnished equipment or material for the commodities buy, design or incidental installation for this project. A copy of the gate site plan is included herein. It is the contractor’s responsibility to verify the gate site plan. All Contractors observed discrepancies between the gate site plan and existing conditions shall be referred to the Contracting Officer (KO) before affected work is performed. Failure to make such notification shall place responsibility upon the contractor to carry out the work in a manner acceptable to the KO at no additional cost to the Government.

9 GENERAL INFORMATION

9.1 HOURS/DAYS OF OPERATION: The contractor shall coordinate work dates and times with COR. Typically, contractor working hours shall be from 0700 – 1700 hrs. Monday through Friday unless the installation has specific requirements as outlined in the contract documents. Work on Federal Holidays and base down days requires approval of the KO. There will be no staff to allow for access or provide coordination on those days.

The following are remaining federal holidays for calendar year 2021:

9.1.1. New Year’s Day – January 1st

9.1.2. Martin Luther King Jr. Day – Third Monday in January

9.1.3. President’s Day – Third Monday in February

9.1.4. Memorial Day – Third Monday in February

9.1.5 Juneteenth- June 19th

9.1.6. Independence Day – July 4th

9.1.7. Labor Day – First Monday in September

9.1.8. Columbus Day – Second Monday in October

9.1.9. Veterans Day –November, 11th

9.1.10. Thanksgiving Day – Last Thursday in November

9.1.11. Christmas Day – December 25th

9.2 SECURITY: The contractor and all employees shall comply with all installation security requirements imposed by Selfridge ANGB installation commander at all times while on the premises as outlined in the contract documents. The contractor shall provide an up-to-date roster of contractor personnel, by employee name and position title, authorized to work on the base to the Contracting Officer/COR at the pre-performance conference meeting The contractor shall provide to the contracting officer/COR a Selfridge ANGB Pre-Authorization Access Request List on company letterhead with the names of all employees who will require base access. The access list will contain the following information: Employee’s full name, date of birth, driver’s license number and state of issue.

9.3 ESCORTS: All personnel must qualify for unescorted base access during the construction period. Some of this work is to be accomplished in secure areas will require the contractor to coordinate independent escorts with the Point of Contact (POC), specified in section 17 below, to complete the tasks outlined herein.

9.4 BADGES: The contractor shall obtain and monitor assigned security badges (used by both prime contractor and subcontractor staff) used during the duration of this contract. All security badges or passes shall be returned to COR upon expiration of the badge, upon completion of the project, or when possession of the badge is no longer necessary (e.g., upon removal of contracted personnel from specific projects).

9.5 PERSONNEL ROSTER: The contractor shall provide a personnel roster to the KO consisting of names, social security numbers, and security clearance confirmation no later than 10 days after the contract award date. The personnel roster shall be updated as individuals are removed and added to roster.

9.6 PHYSICAL SECURITY: Contractor shall be responsible for safeguarding all government property in the work area including:

9.6.1. The contractor shall secure all equipment at the close of each workday.

9.6.2. The contractor shall not leave an open and/or removed gate unattended unless previously agreed upon with Selfridge Security Forces (hereinafter SSF). At no time shall a gate that is open and/or removed be left unattended without prior authorization from SSF. The contractor shall follow all instructions provided by SSF. The contractor is encouraged to coordinate with SSF in advance of the time an open and/or removed gate is expected to be left unattended.

9.7 ANTITERRORISM / OPERATIONS SECURITY / INFORMATION PROTECTION: The following antiterrorism / operations security / information protection clauses are applicable to this contract:

9.7.1. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

9.7.2. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

9.7.3. This standard language is for contractor employees with an area of performance within an Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil.

10 SAFETY:

10.1 All appropriate safety measures (as outlined in Occupational Safety and Health Administration (OSHA) and Air Force Occupational and Environmental Safety, Fire Protection, and Health (AFOSH) guidance) will be utilized and adhered to throughout this project.

10.2 Maintaining Work Area: The contractor shall be responsible for immediately cleaning up any spills, debris, etc., which may occur during work. The contractor shall be responsible for keeping the work area clean. The site conditions shall be returned to original conditions or better. All safety precautions, measures and procedures shall be in place. Installation materials and equipment shall not be stored in the site during non-working hours except when the using agency provided a written approval allowing storage of such materials and equipment on approved location on site.

10.3 The contractor shall follow OHSA all safety lock out and tag out procedures. All work shall be done in accordance with the latest National Electrical Code (NEC), UFC and NEMA and IES.

11 PLACE OF PERFORMANCE:

11.1 Primary location of work performance is Selfridge ANGB as indicated in project documents.

12 PERIOD OF PERFORMANCE:

12.1 Contract is for 1.5 months (45 days) from time of award. All work will be completed within that timeframe.

13 EMPLOYEES:

13.1 Contractor personnel shall either wear distinctive clothing bearing the name of the company or appropriate badges that contain the company name and employee name at all times while performing work on base.

13.2 The contractor shall not employ any person who is an employee of the US Government if employing that person would create a conflict of interest.

13.3 The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DODD 5500-7, Joint Ethics Regulation.

14 VISITS:

14.1 The contractor/s shall attend a kick-off meeting and post award conference.

14.2 The contractor also shall attend and support meetings and teleconferences to discuss technical or regulatory issues and project progress and status. The COR or Point of Contact will schedule and provide space for all required meetings.

15 NOTIFICATION REQUIREMENTS:

15.1 The contractor is required to notify the KO of critical issues that may affect the contract performance and/or human health and the environment. The types of issues that require notification include, but are not limited to health risks and changes in critical personnel. On critical issues, verbal notification should be made immediately, followed by written notification as soon as practical.

16 COORDINATION OF ACTIVITIES:

16.1 The contractor shall coordinate worksite activities with all applicable personnel to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions. The contractor shall provide physical security to work areas with security equipment and personnel.

17 CONTRACT ADMINISTRATION:

17.1 Contracting Officer (KO), the term used herein, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the KO shall be the only individual authorized to in any way amend or modify the terms of this contract

17.2 Contract Points of Contact (POCs) are:

Contracting Office

POC: Steven Stocking/Contracting Officer Office Symbol 127 MSG/MSC Address: 28900 Selfridge Ave.

Commercial 586-239-4465 Email: steven.stocking@us.af.mil Project Manager (PM) / Inspector

POC: Brian McMenemy Office Symbol: 127WG/CEC/CEN/CENE Address: 28900 Selfridge Ave.

Building 127 Selfridge ANGB MI 48045 Commercial: (586) 239-4658 Email: brian.mcmenemy@us.af.mil

17.3 Installation Point of Contact/Contracting Officer Representative (POC/COR) Or Base Point of Contact and or the Contracting Officer Representatives see Project documents.

18 ATTACHMENTS:

18.1 Gate Site Plan

18.2 AF Form 66

WAGE DETERMINATION

"General Decision Number: MI20210001 09/03/2021

Superseded General Decision Number: MI20200001

State: Michigan

Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.)

Counties: Michigan Statewide.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 03/12/2021 2 05/07/2021 3 06/04/2021 4 06/18/2021 5 07/02/2021 6 07/09/2021 7 07/16/2021 8 07/30/2021 9 08/27/2021 10 09/03/2021

CARP0004-004 06/01/2019

REMAINDER OF STATE

Rates Fringes

CARPENTER ( Piledriver)..........$ 27.62 20.59

CARP0004-005 06/01/2018

LIVINGSTON (Townships of Brighton, Deerfield, Genoa, Hartland, Oceola & Tyrone), MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR

AND WAYNE COUNTIES

Rates Fringes

CARPENTER (Piledriver)...........$ 30.50 27.28

ELEC0017-005 06/01/2021

STATEWIDE

Line Construction Groundman/Driver............$ 29.11 7.20+32% Journeyman Signal Tech, Communications Tech, Tower Tech & Fiber Optic Splicers.$ 42.55 7.20+32% Journeyman Specialist.......$ 48.93 7.20+32% Operator A..................$ 35.96 7.20+32% Operator B..................$ 33.57 7.20+32%

Classifications

Journeyman Specialist: Refers to a crew of only one person working alone.

Operator A: Shall be proficient in operating all power equipment including: Backhoe, Excavator, Directional Bore and Boom/Digger truck.

Operator B: Shall be proficient in operating any 2 of the above mentioned pieces of equipment listed under Operator A.

ENGI0324-003 06/01/2021

ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,

CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,

ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB,

MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO,

PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC,

SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:

OPERATOR: Power Equipment (Steel Erection)

GROUP 1....................$ 48.02 24.85

GROUP 2....................$ 49.02 24.85

GROUP 3....................$ 46.52 24.85

GROUP 4....................$ 47.52 24.85

GROUP 5....................$ 45.02 24.85

GROUP 6....................$ 46.02 24.85

GROUP 7....................$ 44.75 24.85

GROUP 8....................$ 45.75 24.85

GROUP 9....................$ 44.30 24.85

GROUP 10....................$ 45.30 24.85

GROUP 11....................$ 43.57 24.85

GROUP 12....................$ 44.57 24.85

GROUP 13....................$ 43.21 24.85

GROUP 14....................$ 44.21 24.85

GROUP 15....................$ 42.57 24.85

GROUP 16....................$ 39.37 24.85

GROUP 17....................$ 24.89 12.00

GROUP 18....................$ 28.38 12.00

FOOTNOTE:

Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Engineer when operating combination of boom and jib 400' or longer

GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler

GROUP 3: Engineer when operating combination of boom and jib 300' or longer

GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler

GROUP 5: Engineer when operating combination of boom and jib 220' or longer

GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler

GROUP 7: Engineer when operating combination of boom and jib 140' or longer

GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler

GROUP 9: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level)

GROUP 10: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler

GROUP 11: Engineer when operating combination of boom and jib 120' or longer

GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler

GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator

GROUP 14: Crane operator on a crane that requires an oiler

GROUP 15: Hoisting operator; 2 drum hoist and rubber tired backhoe

GROUP 16: Forklift and 1 drum hoist

GROUP 17: Compressor or welder operator

GROUP 18: Oiler

* ENGI0324-004 06/01/2021

AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON,

HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON,

MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA,

ST. JOSEPH, VAN BUREN

AREA 2: ANTRIM, BENZIE, CHARLEVOIX, EMMET, GRAND TRAVERSE,

KALKASKA, LEELANAU, MISSAUKEE AND WEXFORD COUNTIES:

(Steel Erection)

AREA 1

GROUP 1....................$ 48.02 24.85

GROUP 2....................$ 44.75 24.85

GROUP 3....................$ 43.21 24.85

GROUP 4....................$ 39.37 24.85

GROUP 5....................$ 24.89 12.00

GROUP 6....................$ 28.38 12.00

AREA 2

GROUP 1....................$ 48.02 24.85

GROUP 2....................$ 44.75 24.85

GROUP 3....................$ 43.21 24.85

GROUP 4....................$ 39.37 24.85

GROUP 5....................$ 24.89 12.00

GROUP 6....................$ 28.38 12.00

FOOTNOTES:

Crane operator with main boom and jib 300' or longer: $1.50 additional to the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 additional to the group 1 rate.

PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Crane Operator with main boom & jib 400', 300', or 220' or longer.

GROUP 2: Crane Operator with main boom & jib 140' or longer, Tower Crane; Gantry Crane; Whirley Derrick.

GROUP 3: Regular Equipment Operator, Crane, Dozer, Loader, Hoist, Straddle Wagon, Mechanic, Grader and Hydro Excavator.

GROUP 4: Air Tugger (single drum), Material Hoist Pump 6"" or over, Elevators, Brokk Concrete Breaker.

GROUP 5: Air Compressor, Welder, Generators, Conveyors

GROUP 6: Oiler and fire tender

ENGI0324-005 09/01/2020

AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND,

ST. CLAIR, WASHTENAW AND WAYNE COUNTIES

AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA,

BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS,

CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD,

DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND

TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,

IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,

KWEENAW, LAKE, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE,

MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE,

MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW,

ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE,

ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST.

JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES

(Underground construction (including sewer))

AREA 1:

GROUP 1....................$ 35.88 24.85

GROUP 2....................$ 31.15 24.85

GROUP 3....................$ 30.42 24.85

GROUP 4....................$ 29.85 24.85

GROUP 5....................$ 21.40 12.05

AREA 2:

GROUP 1....................$ 34.17 24.85

GROUP 2....................$ 29.28 24.85

GROUP 3....................$ 28.78 24.85

GROUP 4....................$ 28.50 24.85

GROUP 5....................$ 21.40 12.05

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger);

Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;

Endloader; Gradall (and similar type machine); Grader;

Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator

GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;

Pump (1 or more - 6-in. discharge or larger - gas or diesel- powered or powered by generator of 300 amperes or more - inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller);Vac Truck and End dump operator;

GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);

Maintenance person; Pump (2 or more-4-in. up to 6-in.

discharge-gas or diesel powered - excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger - gas or diesel powered)

GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Hydraulic pipe pushing machine;

Mulching equipment; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered -excluding submersible pumps); Roller (other than asphalt);

Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over); Sweeper (Wayne type); Water wagon and Extend-a boom forklift

Group 5: Fire Person, Oiler

* ENGI0324-006 06/01/2021

GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA,

ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY,

BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN,

CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON,

EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE,

HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON,

KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU,

LENAWEE, LIVINGSTON, LUCE, MACKINAC, MANISTEE, MARQUETTE,

MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM,

MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON,

OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON,

SAGINAW, ST. CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT,

SHIAWASSEE, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES

Power equipment operators:

(AIRPORT, BRIDGE & HIGHWAY

CONSTRUCTION)

GROUP 1.....................$ 36.86 24.85

GROUP 2.....................$ 30.13 24.85

GROUP 3.....................$ 29.52 24.85

GROUP 4.....................$ 29.40 24.85

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt plant operator; Crane operator (does not include work on bridge construction projects when the crane operator is erecting structural components); Dragline operator; Shovel operator; Locomotive operator; Paver operator (5 bags or more); Elevating grader operator; Pile driving operator; Roller operator (asphalt); Blade grader operator; Trenching machine operator (ladder or wheel type); Auto-grader; Slip form paver; Self-propelled or tractor-drawn scraper; Conveyor loader operator (Euclid type); Endloader operator (1 yd. capacity and over);

Bulldozer; Hoisting engineer; Tractor operator; Finishing machine operator (asphalt); Mechanic; Pump operator (6-in.

discharge or over, gas, diesel powered or generator of 300 amp. or larger); Shouldering or gravel distributing machine operator (self- propelled); Backhoe (with over 3/8 yd.

bucket); Side boom tractor (type D-4 or equivalent or larger); Tube finisher (slip form paving); Gradall (and similar type machine); Asphalt paver (self- propelled);

Asphalt planer (self-propelled); Batch plant (concrete-central mix); Slurry machine (asphalt); Concrete pump (3 in. and over); Roto-mill; Swinging boom truck (over 12 ton capacity); Hydro demolisher (water blaster);

Farm-type tractor with attached pan; Vacuum truck operator;

Batch Plant (concrete dry batch); Concrete Saw Operator (40h.p. or over; Tractor Operator (farm type); Finishing Machine Operator (concrete); Grader Operator (self-propelled fine grade or form (concrete)).

GROUP 2: Screening plant operator; Washing plant operator;

Crusher operator; Backhoe (with 3/8 yd. bucket or less);

Side boom tractor (smaller than D-4 type or equivalent);

Sweeper (Wayne type and similar equipment); Greese Truck;

Air Compressor Operator (600 cu.ft. per min or more); Air Compressor Operator (two or more, less than 600 cfm);

GROUP 3: Boiler fire tender; Tractor operator (farm type with attachment); Concrete Breaker; Wagon Drill Operator;

GROUP 4: Oiler; Fire tender; Trencher (service); Flexplane operator; Cleftplane operator; Boom or winch hoist truck operator; Endloader operator *under 1 yd. capacity); Roller Operator (other than asphalt); Curing equipment operator

(self-propelled); Power bin operator; Plant drier (6 ft.

wide or over); Guard post driver operator (power driven);

All mulching equipment; Stump remover; Concrete pump (under 3-in.); Mesh installer (self-propelled); End dump; Skid Steer.

ENGI0324-007 05/01/2020

ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,

IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON

AND SCHOOLCRAFT COUNTIES:

(Steel Erection) Compressor, welder and forklift....................$ 33.90 24.60 Crane operator, main boom & jib 120' or longer........$ 40.37 24.60 Crane operator, main boom & jib 140' or longer........$ 40.67 24.60 Crane operator, main boom & jib 220' or longer........$ 41.26 24.60 Mechanic with truck and tools.......................$ 39.50 24.60 Oiler and fireman...........$ 32.36 24.60 Regular operator............$ 37.72 24.60

ENGI0324-008 10/01/2020

ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,

BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,

CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,

DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND

TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,

IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,

KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,

MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,

MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,

MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,

OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.

CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,

VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES

(Sewer Relining)

GROUP 1.....................$ 34.62 13.92

GROUP 2.....................$ 32.83 13.92

SEWER RELINING CLASSIFICATIONS

GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system

GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems

ENGI0325-012 05/01/2021

Rates Fringes

Power equipment operators -gas distribution and duct installation work:

GROUP 1.....................$ 33.48 24.85

GROUP 2.....................$ 31.45 24.85

GROUP 3.....................$ 30.35 24.85

SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as ""distribution work,"" starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation.

Group 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd.

capacity or greater).

GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2 yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck (with powered boom), tractor (wheel type other than backhoe or front endloader). Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day) and trencher(service).

GROUP 3: Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator.

IRON0008-007 06/01/2021

ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,

IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON

Ironworker - pre-engineered metal building erector...........$ 23.70 6.95

IRONWORKER

General contracts $10,000,000 or greater......$ 36.45 27.65 General contracts less than $10,000,000............$ 36.45 27.65

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

IRON0025-002 06/01/2019

ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,

CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,

ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND,

MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE,

ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA,

WASHTENAW AND WAYNE COUNTIES:

Ironworker - pre-engineered metal building erector Alcona, Alpena, Arenac, Cheboygan, Clare, Clinton, Crawford, Gladwin, Gratiot, Huron, Ingham, Iosco, Isabella, Jackson, Lapeer, Livingston (west of Burkhardt Road), Montmorency, Ogemaw, Oscoda, Otsego, Presque Isle, Roscommon, Sanilac, Shiawassee, Tuscola & Washtenaw (west of U.S. 23).$ 24.26 22.11 Bay, Genesee, Lapeer, Livingston (east of Burkhardt Road), Macomb, Midland, Oakland, Saginaw, St. Clair, The University of Michigan, Washtenaw (east of U.S. 23) & Wayne...$ 25.48 23.11

IRONWORKER

Ornamental and Structural...$ 36.77 29.03 Reinforcing.................$ 30.98 27.99

IRON0055-005 07/01/2021

LENAWEE AND MONROE COUNTIES:

IRONWORKER

Pre-engineered metal buildings...................$ 23.59 19.35 All other work..............$ 31.25 26.90

IRON0292-003 06/01/2020

BERRIEN AND CASS COUNTIES:

Rates Fringes

IRONWORKER (Including pre-engineered metal building erector).........................$ 31.75 22.84

IRON0340-001 06/19/2017

ALLEGAN, ANTRIM, BARRY, BENZIE, BRANCH, CALHOUN, CHARLEVOIX,

EATON, EMMET, GRAND TRAVERSE, HILLSDALE, IONIA, KALAMAZOO,

KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA,

MISSAUKEE, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA,

OTTAWA, ST. JOSEPH, VAN BUREN AND WEXFORD COUNTIES:

IRONWORKER (Including pre-engineered metal building erector).........................$ 24.43 24.67

LABO0005-006 10/01/2020

Rates Fringes

Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE

AND WEXFORD COUNTIES - Zone 10) Levels A, B or C............$ 17.45 12.75 class b....................$ 18.64 12.90 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;

Also, Level D...............$ 16.45 12.75 class a....................$ 17.64 12.90 Zone 10 Laborers - hazardous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT

COUNTIES - Zone 11) Levels A, B or C............$ 23.58 12.90 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;

Also, Level D...............$ 22.58 12.90 Laborers - hazardous waste abatement: (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (except the city of Portland);

K…