Pre-Proposal Conference Minutes - Demolish Bldg. 972.pdf
PDF 250 KB Posted
- Attached to
- Demolish Bldg. 972 and Misc Site Work Selfridge ANGB Federal contract opportunity
- Solicitation number
- W50S8520B0008
About this file
This document outlines the pre-proposal conference minutes for solicitation number W50S8520B0008 to demolish Building 972 and conduct miscellaneous site work at Selfridge Air National Guard Base in Michigan. The contractor shall demolish specified buildings and structures, dispose of debris, restore and re-grade the site, and establish grass groundcover. The period of performance is 90 days. The requirement is set aside for small businesses with a size standard of $16.5 million. Bids are due by August 31, 2020. The site visit was held on August 12, 2020. Questions are to be submitted by RFI by August 25. The award will be made to the low-priced responsible bidder without discussions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Abstract W50S8520B0008 Bldg 972 Demo Site Work signed.pdf | ||
| Bldg. 972 Demo Sealed Bid Opening Attendance Sheet.pdf | ||
| SOW - Demolish 972 ADDENDUM 1.docx | DOCX document | |
| 03_A-003 Drainage Plan - B972 ADD1.pdf | ||
| 03_A-002 Demo Plan - B972 ADD1.pdf | ||
| B972 Demo RFI QAs 1 SEP 2020.docx | DOCX document | |
| W50S85-20-B-0008-0003.pdf | ||
| 04_972 Hazmat Surveys.pdf | ||
| 03_A-001 SITE PLAN ADD1.pdf | ||
| 05_Wetlands Near RR Removal Project.pdf | ||
| 06_B972 Secured interior photos.pdf | ||
| 03_A-004 Demo Plan - Railroad ADD1.pdf | ||
| W50S85-20-B-0008-0002.pdf | ||
| 07_Rail Road Markings.pdf | ||
| 03_A-005 Drainage Intent Plan - Railroad ADD1.pdf | ||
| W50S85-20-B-0008-0001.pdf | ||
| B972 Photo 1 - 972.pdf | ||
| Reconfigure Drawing - Specs B972.pdf | ||
| W50S85-20-B-0008.pdf | ||
| B972 Existing Photos 2 - railroad.pdf | ||
| A-001 SITE PLAN Drawings.pdf | ||
| SOW - Demolish 972 REV1.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHIGAN AIR NATIONAL GUARD
127th MISSION SUPPORT GROUP
SELFRIDGE ANG BASE MICHIGAN
12 August 2020
MEMORANDUM FOR RECORD
FROM: 127 MSC
Contracting Division 43200 Maple St, Bldg. 105 Selfridge ANGB, MI 48045-5213
SUBJECT: Pre-Bid Conference for IFB Solicitation W912JB-20-B-0008 – Demolition of Bldg. 972 & Miscellaneous Site Work – Selfridge ANGB, MI (48045)
1. Site visit held this date at the Contracting Division outside Bldg. 105 conference room commencing at:
10:00am EST in conjunction with interested contractors. For list of attendees see sign in sheet.
2. Daniel Taliaferro, MSgt (127th Contracting), 1Lt Adam Vermeersch (127th Civil Engineering) and
Mr. Darren Burton (127th Civil Engineering) introduced themselves.
A. PROJECT DESCRIPTION:
3. Contractor shall perform all work in accordance with the statement of work, specifications and drawings.
VGLZ 202001 Demolish Bldg. 972 & misc. site work consists of labor, materials, and supervision necessary to demolish and to dispose of facilities, various structures, roads, railroads, sidewalks, and utilities; the Contractor shall restore the site following demolition, re-grade and establish grass groundcover on the sites as described below. Demolition includes, but is not limited to, buildings listed in Table 1.01 below and as defined specifically on the information drawings provided. The Contractor shall be held responsible for all requirements described in the SOW, contract documents and all work, including that of his subcontractors, if any. All work shall be done in accordance with the contract documents. Failure to familiarize oneself with their requirements will not relieve the Contractor of his responsibility to comply with contract document requirements. The organization of the work, specifications into divisions, sections and articles, and the arrangement of drawings shall not control the Contractor into dividing the work amongst Subcontractors or in establishing the extent of work to be performed by any trade. All work performed under the scope of work shall be conducted in accordance with all applicable State and Federal laws, regulations, and codes, ANG policies and regulations, General Specifications, and the SOW as outlined.
Solicitation #: W50S85-20-B-0008
Location: Selfridge ANGB, MI (Harrison Twp., MI - 48045)
Period of Performance (POP): 90 Days
Set-aside: This requirement will be 100% Set-Aside for Small Business. Small
Business Size Standard: $16.5M
NAICS Code: (W50S8520B0008) 238910 – Site Preparation Contractors
Project Magnitude: Between $250,000 and $500,000
Submit Bids no later than: 31 August 2020, @ 2:00 pm EST. Bid Bonds are required. Payment and Performance Bonds are required within 10 days after contract award.
4. Bids are due NLT 31 August 2020 at 2:00 pm ET. A public bid opening will take place at Bldg. 105
Conference Room at Selfridge ANGB.
a. Facsimile transmission of bid is NOT authorized.
b. Bids may be mailed in or hand carried. A bid repository is provided for hand carried bids and is located at 43200 Maple Street, Bldg. 105, Contracting Front Office (Directly across from Room 20), Selfridge ANGB, MI 48045. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions to obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
c. Electronic submission of bids will not be accepted.
d. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications.
e. A Site Visit was held immediately after this pre-proposal conference at the construction site.
f. When amendments are issued they will be posted to the beta.sam.gov website.
g. Bid Bonds will be required for this project. (by the time of Bid Opening) If greater than $35,000.00 payment bond will be required; $150,000.00, a performance bond will be required (within 10 days after contract award).
h. Liquidated damages of $719.11 per day apply to this project.
i. Warranty of Construction clause is incorporated and applies to this project.
j. The most current wage determination is incorporated into the solicitation and will be made part of the resultant contract but it is the contractor's responsibility to keep track of the most current wage rate.
Currently MI2020091 07/24/2020 Mod 5.
k. Safety measures are always a part of Government contracts and the Army Corp of Engineers manual is incorporated in the contract.
l. RFI procedures were reviewed as follows:
i. Email technical questions in RFI format to Contracting Office for resolution.
ii. All RFI questions and answers posted to beta.sam.gov, as soon as possible, and if applicable to all.
m. Please recall that only the Contracting Officer can approve changes such as price, schedule, specifications, and clauses with formal written notice typically in the form of a solicitation amendment or task order modification. Work undertaken regarding changes not formally approved by the Contracting Officer (save for COR approved no cost field changes) is at the Contractor’s risk.
n. This requirement is currently unfunded. Prospective offerors were requested to ensure that bids are validated through 30 September 2020.
o. The Government intends to award a contract to the low price responsible bidder without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer, in his/her sole discretion, later determines them to be necessary or appropriate.
i. Evaluation Factors for Award:
1. Price
2. Price-Related Factors
5. The project description was stated in the beta.sam.gov announcement package W50S85-20-B-0008.
6. All/ all project specific questions were referred to the RFI submittal process. It was advised to submit all RFIs NLT COB on 25 August 2020. It was also advised that any changes would be issued with an addendum.
7. It is extremely important to submit all requirements within quote.
8. The site visit concluded at Selfridge ANGB on Wednesday, 12 August 2020 @ 1130 EST.