Site Visit Minutes_BCANGB.pdf

PDF 4 MB Posted

Attached to
Repair Breaker Panels B6930
Solicitation number
W50S8426BA002
Issued by

About this file

This is a Memorandum for Record documenting pre-bid site visits and key solicitation information for four construction projects at Battle Creek Air National Guard Base in Michigan.

The four solicitations are: W50S84-25-B-A001 (Relocate Perimeter Fence at Fire Station), W50S84-25-B-A002 (Repair Breakers B6930), W50S84-25-B-A003 (Repair POL Yard Asphalt), and W50S84-25-B-A004 (Repair Lift Station B6954). Combined site visits were held on August 11, 2026, at 10:00 AM EDT with representatives from Contracting, Engineering, and Civil Engineering. Questions and RFIs must be submitted by August 17, 2026 (10 days prior to bid opening), with project documents taking precedence over RFI responses unless modified by amendment. All bids must be submitted electronically through the PIEE Solicitation module by August 27, 2026 at 1000, with hand-carried, mailed, or emailed bids to be rejected. A public bid opening will occur on August 27, 2026 at 1000 with results posted to SAM.gov. Bid bonds are required only if specified in SF 1442 Block 13b. Performance bonds will be required post-award if the contract price meets the $150,000 threshold per FAR 28.102-1(a), and payment bonds are required for all projects. The stated 365-day period of performance begins from Notice to Proceed and includes all contract requirements through final acceptance and site restoration, with winter weather exclusions included. Construction wage rates apply to all projects, FAR clause 52.236-6 (Superintendence by the Contractor) is included with subcontractor superintendents requiring written Delegation of Authority, and FAR clause 52.246-21 (Warranty of Construction) requires one-year warranty from final acceptance. Projects are currently unfunded with anticipated funding availability by September 30, 2026.

View the file

Other files

File Type Posted
Bid Opening Abstract W50S84-26-B-A002.pdf PDF
Q and A - B6930 Breakers 20260820.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHIGAN AIR NATIONAL GUARD

HEADQUARTERS 110TH WING (ACC) (ANG)

3545 MUSTANG AVENUE

BATTLE CREEK MI 49037-5509

11 August 2026

MEMORANDUM FOR RECORD

FROM: 110 MSG/MSC

3571 Mustang Ave.

Battle Creek ANGB, MI 49037

SUBJECT: Pre-Bid Site Visits for Solicitations at Battle Creek ANGB, MI:

W50S84-25-B-A001, MBMV242504 Relocate Perimeter Fence (Fire Station) W50S84-25-B-A002, MBMV262008 Repair Breakers B6930 W50S84-25-B-A003, MBMV232017 Repair POL Yard Asphalt W50S84-25-B-A004, MBMV252001 Repair Lift Station B6954

1. Combined site visits for referenced projects were held 11 August 2026 at Battle Creek

ANGB, MI, commencing at 10:00 AM EDT. For list of attendees see sign in sheet.

2. MSgt Michael Solo (Contracting), TSgt Joseph Bryant, Maj Olivia Honeycutt (Engineering), and Jamieson Taylor (Engineering) were introduced along with other members of Civil Engineering.

3. Q&A/RFIs: All questions regarding the solicitations are due 10 days prior to bid opening (17 August). Questions are requested as early as possible to ensure timely answers can be provided. Project documents take precedence over any answers to RFIs, unless changed via solicitation amendment.

4. Electronic Bid Submission Only: All bids must be submitted electronically through the PIEE Solicitation module to be accepted. Link is provided in SAM.gov solicitation. Emailed bids will be rejected. Hand carried or mailed bids will be rejected and/or returned. Read the Instructions to Offerors carefully.

5. Bids are due NLT 27 August 2026 @ 1000 unless updated via amendment.

6. Bid bonds are only required if specified in Block 13b of the SF 1442.

7. Performance bonds will be required post-award if contract price meets the threshold at RFO

FAR 28.102-1(a) ($150K). Payment bond will be required for all projects.

8. A public bid opening will be held at Battle Creek ANGB on 27 August @ 1000 unless updated via amendment. Attendence is optional and results with abstracts of bids will be posted to SAM.gov.

9. Projects include FAR clause 52.236-6 Superintendence by the Contractor. A subcontractor superintendent will only be accepted if written Delegation of Authority is provided to the Contracting Officer. Site superintendent must be present on site during all work.

10. Construction Wage Rates apply and are included in all projects.

11. Stated 365-day period of performance (PoP) begins from issuance of Notice to Proceed and includes all contract requirements through final acceptance, including closeout documents and site restoration. Winter exclusion is included in the PoP, the Government does not intend to extend the contracts due to winter weather.

12. FAR clause 52.246-21 Warranty of Construction is included in all projects, requiring 1 year warranty from date of final acceptance of work.

13. Projects are currently unfunded. The Government anticipates funds will become available prior to but no later than 30 September 2026.

14. It is extremely important to submit all requirements with the Bid, and to review the Instructions to Offerors. Only electronic bids submitted through the PIEE Solicitation module will be accepted. Hand carried, mailed, or emailed bids will be rejected and/or returned.

15. Site visits were held at each of the project sites following the above briefing.

16. The site visits concluded on 11 August 2026 at 11:20 AM.

MICHAEL J SOLO

Contracting Officer, 110 MSC

2026-08-12T07:32:49-0400
SOLO.MICHAEL.JAY.1411821826

File details come from the government source that posted it. Updated .