Sidewalk RFI Response 1.pdf

PDF 38 KB Posted

Attached to
Sidewalk Replacement Federal contract opportunity
Solicitation number
W50S82-23-B-0001
Issued by
Department of the Army Maryland Army National Guard

About this file

This document contains a request for information response related to a sidewalk replacement solicitation from the Department of the Army Maryland Army National Guard. The RFI response provides details on the scope of work including that the sidewalk replacement project is for a 632 foot long by 4 foot wide sidewalk at a height of 4 inches. The middle section of the new sidewalk must align with existing sidewalks using geographical benchmarks provided. Any retaining walls impacted by the work must be reconstructed flush with the exterior side of the new sidewalk to accommodate changes to the soil and terrain. The related solicitation lists the opportunity as a replacement of an existing sidewalk at W50S82-23-B-0001 for the Department of the Army Maryland Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to Sidewalk Replacement, newest first.
File Type Posted
OF_1419A.pdf PDF
OF_1419.pdf PDF
SOW.docx DOCX document
W50S8223B0001 Solicitation.pdf PDF
WF 113 - Installation Access Application.pdf PDF
Google Map View.PNG PNG image
Sidewalk Detail.jpg JPG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

175th Base contracting

2701 EASTERN BOULEVARD

BALTIMORE MARYLAND 21220-2899

3 Aug 2023

1) What are the overall approx. dimensions for the sidewalk requirement?

Length: 632ft

Width: 4ft

Height: 4in

2) Does the side need to follow the road or go in a straight line? The middle section of the sidewalk points to the right when looking down the road from the HQ building.

The contractor will be provided multiple Geographical benchmarks that will allow the newly constructed sidewalk to be aligned with the already existing concrete sidewalk.

3) Retaining wall info:

The location of the retaining walls will need to be flush to the exterior side of the new sidewalk and will need to be reconstructed as the soil and terrain will be altered. Please reference the RFI answer above to know where the relocation of the retaining wall will be located.