Sidewalk RFI Response 1.pdf
PDF 38 KB Posted
- Attached to
- Sidewalk Replacement Federal contract opportunity
- Solicitation number
- W50S82-23-B-0001
About this file
This document contains a request for information response related to a sidewalk replacement solicitation from the Department of the Army Maryland Army National Guard. The RFI response provides details on the scope of work including that the sidewalk replacement project is for a 632 foot long by 4 foot wide sidewalk at a height of 4 inches. The middle section of the new sidewalk must align with existing sidewalks using geographical benchmarks provided. Any retaining walls impacted by the work must be reconstructed flush with the exterior side of the new sidewalk to accommodate changes to the soil and terrain. The related solicitation lists the opportunity as a replacement of an existing sidewalk at W50S82-23-B-0001 for the Department of the Army Maryland Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419A.pdf | ||
| OF_1419.pdf | ||
| SOW.docx | DOCX document | |
| W50S8223B0001 Solicitation.pdf | ||
| WF 113 - Installation Access Application.pdf | ||
| Google Map View.PNG | PNG image | |
| Sidewalk Detail.jpg | JPG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
175th Base contracting
2701 EASTERN BOULEVARD
BALTIMORE MARYLAND 21220-2899
3 Aug 2023
1) What are the overall approx. dimensions for the sidewalk requirement?
Length: 632ft
Width: 4ft
Height: 4in
2) Does the side need to follow the road or go in a straight line? The middle section of the sidewalk points to the right when looking down the road from the HQ building.
The contractor will be provided multiple Geographical benchmarks that will allow the newly constructed sidewalk to be aligned with the already existing concrete sidewalk.
3) Retaining wall info:
The location of the retaining walls will need to be flush to the exterior side of the new sidewalk and will need to be reconstructed as the soil and terrain will be altered. Please reference the RFI answer above to know where the relocation of the retaining wall will be located.