RFI_11 Sep.docx
DOCX document 14 KB Posted
- Attached to
- Generator Installation Federal contract opportunity
- Solicitation number
- W50S7Z-22-R-0020
About this file
This document contains a request for information and federal contract opportunity related to a generator installation project. The request for information involves questions about existing generator and electrical infrastructure at several buildings on a naval air station, including requests for drawings, confirmation that wiring and conductors can be reused, and plans for decommissioning old equipment. The federal contract opportunity is a solicitation between $250,000 and $500,000 to install generators at the naval air station over 180 days. The project is 100% set aside for small businesses with a size standard of $16.5M. The solicitation is issued by the Department of the Army Louisiana Army National Guard. Offerors are encouraged to attend an on-site visit in September and funds have been identified but are not presently available, so no award will be made until funding is appropriated.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S7Z-22-R-0020_Generator Project.pdf | ||
| EXHIBIT A.doc | DOC document | |
| EXHIBIT_C_Reference_Questionnaire_Package 18Jan18_NEW.docx | DOCX document | |
| SOW_Gen.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Can 1-Line Diagrams be provided for each of the generators? Can be made available
1. Can existing building electrical plans be provided for each of the existing generator installations? No drawings currently exist
1. The existing transfer switch panels at Buildings 149, 194, 473, and 516 are already wired to the buildings as required. New transfer switches will replace the existing transfer panels and no additional wiring into the building is not required. Please confirm. 149 and 473 will have some additional electrical requirements
1. Existing conductors to and from the transfer panels are properly sized, in good working condition, and can be re-used. Pleas confirm. Yes
1. Transfer panel at Building 149 is currently fed from generators at Building 119. Is contractor to de-terminate and abandon in place? Yes
1. Except for the generator as Building 473 all the other generators will be installed on existing foundation paving. Please confirm. Yes
1. Is contractor to de-terminate and abandon conductors in place at Building 473 and Building 24? Yes
1. Will all 6 generators be 480V 3-Phase? If not, please provide required voltage rating on all generators. 473 is 120/208
File details come from the government source that posted it. Updated .