This is a Geotechnical Data Report documenting subsurface exploration conducted by AECOM for the Indiana Air National Guard's proposed New Entry Control Point at Hulman Field in Terre Haute, Indiana. The project involves constructing a visitor check-in building, overwatch position, expanded pavements, new site utilities, and associated security infrastructure on a low-relief site with elevations between 588.4 and 590.2 feet above sea level, located approximately 1,000 feet southwest of the entry road entrance from Indiana State Route 42.

The subsurface investigation included four exploratory soil borings (SB-01 through SB-04) advanced to depths of 10 to 20 feet between November 16-18, 2018, along with Standard Penetration Testing and laboratory analysis. The site profile consists of asphalt pavement (10-12 inches thick) or topsoil overlying predominantly fat clay (CH) and lean clay (CL) units with varying moisture and consistency. At the deepest boring (SB-03), a gravelly to sandy lean clay with gravel unit was encountered, substantially stiffer than overlying clays. Groundwater was encountered at depths of 6 to 11 feet at three of four borings. Laboratory testing included moisture content, particle size analysis, Atterberg limits, and consolidation testing on representative samples. Geotechnical recommendations address foundation design using continuous reinforced concrete mat foundations for the visitor building (bearing pressure 1,500 psf), spread footings or drilled shaft foundations for canopy structures, subgrade preparation with undercutting for slabs and flexible pavements, seismic site classification as Site Class D, and construction considerations including excavation, dewatering, and fill placement specifications. The report notes that surface and utility grades will require minimal modification with only nominal cuts and fills generally less than 2 feet in various site areas.

View the file

Other files

File Type Posted
RFI Responses (version 3).pdf PDF
ASCEDesignHazardsReport.pdf PDF
Site Location Map.pdf PDF
CES - STATEMENT OF WORK - Billboard.docx DOCX document
1. Solicitation - W50S7V26QA007 - 181 Billboard.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Visitor Check-in Building:

Overwatch Position:

Pavements:

Site Utilities:

4.1.2.1 Fat Clay

4.1.2.2 Lean Clay

Moisture Content (%) (4 tests)

Particle Size Analysis (%) (1 test)

Particle Size Analysis (%) Fines passing No. 200 sieve (1 test)

Atterberg Limits (%) (4 tests)

Density (1 test)

Consolidation Testing (1 test)

4.1.2.3 Gravelly Lean Clay and Sandy Lean Clay

Visitor Check-In Building

Canopy Structure

Engineered Fill Selection

Engineered Fill Placement

January 2019

Figures

Figure 1 – General Site Location Map

Figure 2 – Geotechnical Boring Location Map

GENERAL LOCATION MAP

U.S. GEOLOGIC SURVEY

NATIONAL MAP

PROPERTY LOCATION

(VIGO COUNTY)

SITE

LOCATION

TERRE HAUTE, INDIANA

INDIANA AIR NATIONAL GUARD

NEW ENTRY CONTROL POINT

INDIANA

TERRE HAUTE, INDIANA

INDIANA AIR NATIONAL GUARD

GEOTECHNICAL BORING LOCATION MAP

SOIL BORING

LOCATION

NEW ENTRY CONTROL POINT

Appendix A

Boring Logs

Appendix B

Laboratory Testing Results

Tested By: E. Rothe Checked By: S. Vaught

LIQUID AND PLASTIC LIMITS TEST REPORT

P

LA

S

TI

C

IT

Y

IN

D

E X

LIQUID LIMIT

0 10 20 30 40 50 60 70 80 90 100 110

CL-ML

CL or O L

CH or O H

ML or OL MH or OH

Dashed line indicates the approximate upper limit boundary for natural soils

W A

TE

R

C O

N

TE

N T

NUMBER OF BLOWS

5 6 7 8 9 10 20 25 30 40

MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS

Project No. Client: Remarks:

Project:

Source of Sample: B-1 Depth: 6.0-8.5 feet Sample Number: S-3

PATRIOT ENGINEERING AND ENVIRONMENTAL, INC.

Indianapolis, Indiana Figure

Brown and gray SILTY CLAY with trace sand 41 19 22 99.1 95.0 CL

18-1613-02G AECOM

INANG Field Entrance

Particle Size Distribution Report

PE

R C

EN

T

FI

N

ER

GRAIN SIZE - mm.

0.0010.010.1110100

% +3" Coarse % Gravel

Fine Coarse Medium % Sand

Fine Silt % Fines

Clay

0.0 0.0 0.1 0.0 0.8 4.1 62.8 32.2 in in in

1½ in in

¾ in

½ in

3/ in

#4 #1

#2

#3

#4

#6

#1

#1

#2

TEST RESULTS (ASTM D422 (2007))

Opening Percent Spec.* Pass?

Size Finer (Percent) (X=Fail)

Material Description

Atterberg Limits (ASTM D 4318)

Classification

Coefficients

Date Received: Date Tested:

Tested By:

Checked By:

Title:

Date Sampled:Source of Sample: B-1 Depth: 6.0-8.5 feet Sample Number: S-3

Client:

Project:

Project No: Figure

Brown and gray SILTY CLAY with trace sand

3/8" #4 #8 #10 #16 #30 #40 #50

#100 #200

0.0374 mm.

0.0276 mm.

0.0186 mm.

0.0136 mm.

0.0114 mm.

0.0083 mm.

0.0060 mm.

0.0029 mm.

0.0013 mm.

100.0 99.9 99.9 99.9 99.9 99.6 99.1 98.3 96.3 95.0 88.0 78.9 64.9 54.8 47.8 40.7 34.7 27.9 23.7

19 41 22

CL A-7-6(22)

0.0412 0.0334 0.0158

0.0121 0.0040

12/05/2018 12/13/2018 E. Rothe

S. Vaught Laboratory Supervisor

AECOM

INANG Field Entrance

18-1613-02G

PL= LL= PI=

USCS (D 2487)= AASHTO (M 145)=

D90= D85= D60= D50= D30= D15= D10= Cu= Cc=

Remarks

* (no specification provided)

PATRIOT ENGINEERING

AND ENVIRONMENTAL, INC.

Indianapolis, Indiana

Final Voids [Log]

ASTM D2435

87.8Dry Density (pcf) 33.7Moisture (%)

Saturation (%) 98.9 Void Ratio 0.92

0.1 1.0 10.0 100.0

Pressure (tsf)

0.30

0.40

0.50

0.60

0.70

0.80

0.90

Fi na l V oi d R at io

, e

(A) Final Void Ratio Curve

BEFORE AFTER

Specific Gravity

Liquid Limits Plastic Limits

0.46

24.2 115.7

2.702

Test Date 12/8/2018

MEASURED

Depth (ft) Sample Number

Sample Description Project Number

Client Project

Boring Number Remarks

Location

Air National Guard Field Entrance Gate S-3

Brown and gray SILTY CLAY with trace sand 18-1613-02G

B-1 6.0-8.5

AECOM

Preconsolidation Stress (tsf) NA 0.288Cc 0.144Cr

Consolidation Test - Results

Indianapolis, Indiana

6150 E. 75th Street Patriot Engineering and Environmental

Report Created: 1/2/2019 Page 3

Test Date: 12/8/2018 Checked By: ___________________ Date: _____________Technician: S. Vaught

Project Name: Air National Guard Field Entrance Gate Project Number: 18-1613-02G

Coefficients of Consolidation

0.100 1.000 10.000 100.000

Pressure (tsf)

0.00000

0.05000

0.10000

0.15000

0.20000

C v

(in ²/M in

T90

Coefficients of Consolidation (T90)

0.100 1.000 10.000 100.000

Pressure (tsf)

0.01000

0.02000

0.03000

0.04000

0.05000

0.06000

0.07000

0.08000

C v

(in ²/M in

T50

Coefficients of Consolidation (T50)

Consolidation Test - Results

Indianapolis, Indiana

6150 E. 75th Street Patriot Engineering and Environmental

Report Created: 1/2/2019 Page 4

Cv - Void Ratio

0.01000 0.10000 1.00000

Cv (in²/Min)

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

Fi na l V oi d R at io

, e

T90

Cv (T90)

0.01000 0.10000

Cv (in²/Min)

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

Fi na l V oi d R at io

, e

T50

Cv (T50)

Consolidation Test - Results

Indianapolis, Indiana

6150 E. 75th Street Patriot Engineering and Environmental

Report Created: 1/2/2019 Page 5

AECOM

6.0-8.5 B-1

18-1613-02G Brown and gray SILTY CLAY with trace sand

S-3 Air National Guard Field Entrance Gate

Location

Remarks Boring Number

Project Client

Project Number Sample Description

Sample Number Depth (ft)

Index

Loading Sequence

(tsf)

Cummulative Change in

Height (in)

Void Ratio

Specimen Height

(in)

Height of Voids

(in)

Vertical Strain

T90 Fitting Time (Hr)

T50 Fitting Time (Hr)

T90 Cv

(in²/Min)

T50 Cv

(in²/Min) Sequence

Status

0 0.000 0.0000 0.00000.9278 0.0 0.922 0.000 0.000 0.00000 0.00000 ENABLED

1 0.250 0.0263 0.41780.9015 2.8 0.864 0.042 0.009 0.07263 0.07957 ENABLED

2 0.500 0.0417 0.40240.8861 4.5 0.832 0.026 0.022 0.11883 0.03265 ENABLED

3 1.000 0.0682 0.37590.8596 7.3 0.777 0.112 0.020 0.02718 0.03507 ENABLED

4 2.000 0.1065 0.33760.8213 11.5 0.698 0.155 0.020 0.01963 0.03503 ENABLED

5 4.000 0.1483 0.29580.7795 16.0 0.611 0.067 0.018 0.04534 0.04026 ENABLED

6 8.000 0.1904 0.25370.7374 20.5 0.524 0.056 0.020 0.05465 0.03467 ENABLED

7 4.000 0.1851 0.25900.7427 19.9 0.536 0.000 0.000 0.00000 0.00000 ENABLED

8 2.000 0.1797 0.26440.7481 19.4 0.547 0.000 0.000 0.00000 0.00000 ENABLED

9 1.000 0.1718 0.27230.7560 18.5 0.563 0.000 0.000 0.00000 0.00000 ENABLED

10 2.000 0.1731 0.27100.7547 18.7 0.560 0.000 0.000 0.00000 0.00000 ENABLED

11 4.000 0.1825 0.26160.7453 19.7 0.541 0.034 0.012 0.09001 0.05987 ENABLED

12 8.000 0.2093 0.23480.7185 22.6 0.485 0.017 0.031 0.17405 0.02285 ENABLED

13 16.000 0.2517 0.19240.6761 27.1 0.398 0.047 0.025 0.06480 0.02787 ENABLED

14 32.000 0.3010 0.14310.6268 32.4 0.296 0.067 0.037 0.04523 0.01891 ENABLED

15 16.000 0.2839 0.16020.6439 30.6 0.331 0.000 0.000 0.00000 0.00000 ENABLED

16 8.000 0.2722 0.17190.6556 29.3 0.355 0.000 0.000 0.00000 0.00000 ENABLED

Consolidation Test - Results

Summary

ASTM D2435

Report Created: 1/2/2019 Page 8 Technician: S. Vaught Date: _____________Checked By: ___________________Test Date: 12/8/2018

Index

Loading Sequence

(tsf)

Cummulative Change in

Height (in)

Void Ratio

Specimen Height

(in)

Height of Voids

(in)

Vertical Strain

T90 Fitting Time (Hr)

T50 Fitting Time (Hr)

T90 Cv

(in²/Min)

T50 Cv

(in²/Min) Sequence

Status

17 4.000 0.2626 0.18150.6652 28.3 0.375 0.000 0.000 0.00000 0.00000 ENABLED

18 2.000 0.2536 0.19050.6742 27.3 0.394 0.000 0.000 0.00000 0.00000 ENABLED

19 1.000 0.2429 0.20120.6849 26.2 0.416 0.000 0.000 0.00000 0.00000 ENABLED

20 0.500 0.2314 0.21270.6964 24.9 0.440 0.000 0.000 0.00000 0.00000 ENABLED

21 0.250 0.2216 0.22250.7062 23.9 0.460 0.000 0.000 0.00000 0.00000 ENABLED

Consolidation Test - Results

Summary

ASTM D2435

Report Created: 1/2/2019 Page 9

Consolidated Test Results

Parameters Height (in)

FinalInitial

0.9278 0.7062

6.0-8.5 Depth (ft)

Location:

Project Number:

Project:

Sampling Date:

Sample Number:

Client Name:

Remarks:

Air National Guard Field Entrance Gate 18-1613-02G

12/3/2018 S-3

AECOM

Brown and gray SILTY CLAY with trace sandSpecimen Description:

Soil Classification:Sampling Method: Undisturbed

Specific Gravity: 2.702 Plastic Limit: 19 41Liquid Limit:

Job Number:

Test Date: 12/8/2018

B-1Boring Number:

Weight of Ring (g) 109.7MEASUREDSpecific Gravity Method:

TEST RESULTSNAHeight Source NA2.4970Diameter (in) NA4.897Area (in²)

Volume (in³) 4.5434 3.4581 Weight of Container (g) 14.3 165.6

Weight of Wet Soil + Container (g) 59.7 295.7 Weight of Dry Soil + Container (g) 48.2 270.3

Moisture Content (%) 33.7 24.2 Moist Weight + Ring Weight (g) 249.7 240.0

Dry Density (pcf) 87.8 115.7 Wet Density (pcf) 117.4 143.6

Saturation (%) 98.9 1 Void Ratio 0.9 0.5

Consolidation Test - Information - Section 1

6150 E. 75th Street

Indianapolis, Indiana

Patriot Engineering and Environmental

Report Created: 1/2/2019 Page 10

Consolidation Test Results

Specimen 1

Large Particle:

Other Associated Tests:

Technician: S. Vaught 12/8/2018 12:00:00 AMTest Time:

Brown and gray SILTY CLAY with trace sandSpecimen Description:

Test Description:

Device Details:

Test Specification:

Sampling Method: Undisturbed Specimen Code: C Specimen Lab #:

Percent Strain [LOG] Graph (tsf): NA Final Voids Graph (tsf): NA

Natural MoistureMoisture Content:

Test Condition:

Seating Pressure Used: NO 0.015Seating Pressure (tsf):

Ring-Lined SamplerSpecimen Preparation:

Preconsolidation Stress:

ASTM D2435Test Procedure:

Consolidation Test - Information - Section 2

6150 E. 75th Street

Indianapolis, Indiana

Patriot Engineering and Environmental

Report Created: 1/2/2019

Project Name: Air National Guard Field Entrance Gate Project Number: 18-1613-02G

Date: _____________Checked By: ___________________ Technician: S. Vaught Test Date: 12/8/2018

File details come from the government source that posted it. Updated .