B7 - Pre-Bid Conference Minutes - W50S7L-23-B-0001.pdf
PDF 768 KB Posted
- Attached to
- Building 62, 79, JKSE 212400 Repair Roofs
- Solicitation number
- W50S7L23B0001
- Issued by
-
Department of the Army National Guard
About this file
This document summarizes the minutes from a pre-bid conference for an invitation for bids to provide roof repair and replacement services at two buildings located at the Montana Air National Guard base. The solicitation requires the removal of existing roof membranes and replacement with new TPO single-ply roof membrane systems at Buildings 62 and 79, including additional insulation at Building 62. The pre-bid conference provided an overview of the project scope, schedule, procurement details and question submission process. Bids are due on July 6th, 2023 and the contract duration is 150 calendar days with a magnitude between $1-5 million. The pre-bid conference included a site visit of the roof areas and encouraged contractors to check the solicitation website regularly for any amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Conference Minutes
MEMORANDUM FOR RECORD
SUBJECT: MINUTES OF PRE-BID CONFERENCE AND SITE VISIT
SOLICITATION: W50S7L-23-B-0001
REPAIR AND REPLACE ROOFS, BLDGS 62 & 79
13 June 2023 / 10:00 AM MST / 1.5 Hours
1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The
Government representatives who attended the subject meeting:
Adam Sackman Contracting Officer
MSgt Anthony Barille Contract Specialist
Maj James Miller Base Civil Engineer
Capt Aaron Jewett Deputy Base Civil Engineer/ COR
2. The following items were discussed during the Pre-Bid Conference
a. Synopsis of project was discussed to include CLINS
b. The contract duration is 150 days after Notice to Proceed, magnitude of project, 100% small business set-aside, questions due date and bid opening date and location
c. Liquidated Damages and Warranty Clause were pointed out as being included
d. Importance of having Bid-Bond along with Power of Attorney on Bid due date
e. Bid due dates along with bid repository and mailing address
f. Solicitation website and the importance of checking the website regularly for amendments
g. Contractors responsibility to read the solicitation, submit questions timely if they have needs for clarification. Importance of submitting questions to contracting directly and not the A&E or Engineers and how this will only delay the process
h. Read the solicitation carefully and comply accordingly
3. A power point slide presentation was used during the first part of the Pre-Bid Conference and will be posted to www.SAM.gov with the minutes and sign in sheet.
4. Immediately after the slide presentation, the group went to Building 62 (Dining Facility) and accessed the roof.
5. After viewing the roof on Building 62, the group then proceeded to Building 79 (Base
Operations) to view the roof. Two roof access points were used in order to look at all areas of work.
6. Mr. Adam Sackman stated the following items at the end of the slide show presentation:
a. The purpose of an amendment and how amendments will be issued if something substantially changes within the solicitation.
b. Mr. Sackman wanted to make sure all contractors were aware the www.SAM.gov allows for notifications/alerts whenever documents/amendment are uploaded by the Government.
7. Two questions were asked during the slide show presentation:
a. Can a sample be taken from each roof? The Government did not allow for samples to be taken.
b. Can we get a copy of the sign-in sheet? Yes, MSgt Anthony Barille stated that the sign-in sheet would be posted to www.SAM.gov, along with pre-bid conference minutes and slide show presentation.
8. Contractors were encouraged to check www.SAM.gov regularly
9. The pre-bid conference and site visit concluded around 11:30 AM MST
ANTHONY BARILLE, MSgt, MTANG
Contract Specialist
Attachments:
Sign-in Sheet
PowerPoint Slides http://www.sam.gov/ http://www.sam.gov/
**Welcome, Please Sign in as you enter**
Pre-Bid Conference
13 June 2023
BCE Building 60, Great Falls, MT
Buildings 62 & 79 Repair and Replace Roofs
120th Airlift Wing
W50S7L-23-B-0001
Agenda
Buildings 62 & 79 Repair and Replace Roofs
• Introductions (Gov’t and Contractor)
• Synopsis
• Important Dates
• Solicitation
• Disclaimers/Questions
13 June 2023 2
Introduction / Purpose
Intros:
Mr. Adam Sackman – Contracting Officer
Capt. Aaron Jewett – Contracting Officer Representative
MSgt. Anthony Barille – Contract Specialist
Purpose:
❑ Familiarization with site
❑ Not intended for re-design/technical questions or interpretations by technical personnel
13 June 2023 3
Contractor Introduction
❑ Your Name
❑ Company
❑ Position in Company
❑ Prime or Subcontractor
13 June 2023 4
Synopsis
❑ This project includes the removal of the existing single-ply roof membrane at B62, and the existing modified SBS roof system (roof covering and fibrous backer board) at B79, and their replacement with a new TPO single-ply roof membrane system for each building, including an additional composite roofing panel of insulation and cover board at B62 to improve the R-value of the roof assembly to meet current IECC standards.
❑ This includes the removal and replacement of all metal flashings, copings, scuppers, and roof-related trim throughout, as well as flashings at all curbs, roof jacks, and all penetrations.
❑ All existing mechanical and electrical equipment present on both roofs is to remain in place and removed/reset only as required for each instance. The existing rooftop pedestrian/user deck at B79 must be removed and reinstalled to facilitate installation of the new roof membrane system beneath it.
13 June 2023 5
Synopsis Cont.
❑ CLINs 0001-0003
❑ No options included
❑ Contract Duration: 150 Days ANP
❑ 100% Small Business Set-Aside
❑Magnitude of Project: $1M to $5M
13 June 2023 6
Bid Due Dates
❑ Bid Due Date/Opening: 6 July 2023 @ 1300 (1:00
PM MST)
❑ Public bid opening and no late submissions will be accepted
❑ No Facsimile or electronic offers
❑ Bids must be signed by the person authorized
❑ Complete bid package listing in Section 00 21 00
(Page 7 of Solicitation)
13 June 2023 7
Bid Due Dates Cont.
❑ Bid Repository
120th Airlift Wing/MSC
Building 60 / Room 133
Base Contracting Office
2800 Airport Ave B, Great Falls, MT 59404-5570
❑ Bid Opening
120th Airlift Wing
Building 60 / Room 137
Civil Engineering Classroom
2800 Airport Ave B, Great Falls, MT 59404-5570
❑ Bid Mailing Address
120th Airlift Wing
Base Contracting Office
Attention: MSgt Anthony Barille
2800 Airport Ave B, Great Falls, MT 59404-5570
13 June 2023 8
Solicitation
❑ On the Web – https://SAM.gov
❑ Check website regularly for Amendments
❑ Amendments must be acknowledged on bid
❑ Questions / Answers will be posted on SAM.gov
❑ Contractor responsibility to read entire Solicitation and all amendments
13 June 2023 9 https://sam.gov/
Solicitation Questions
❑ Questions must be submitted via email to Contract Specialist listed in the solicitation
❑ ONLY questions/answers and information through an amendment are part of the solicitation/contract process
❑ All questions, on a non-attribution basis, and the answers will be posted to the FBO website as an amendment
❑ Check web site regularly for amendments to solicitation
❑ Refer to Description on the SAM.gov posting for Q&A due date
❑ Do not call technical personnel or A&E (ex. SMA) directly; This will delay getting and answer
13 June 2023 10
Disclaimer
❑Bidders are strongly cautioned to carefully read the requirements of the solicitation and comply accordingly
13 June 2023 11
Questions
❑Site Visit
13 June 2023 12
| B7 - Pre-Bid Conference Presentation.pdf |
| Slide 1: **Welcome, Please Sign in as you enter** |
| Slide 2: Agenda |
| Slide 3: Introduction / Purpose |
| Slide 4: Contractor Introduction |
| Slide 5: Synopsis |
| Slide 6: Synopsis Cont. |
| Slide 7: Bid Due Dates |
| Slide 8: Bid Due Dates Cont. |
| Slide 9: Solicitation |
| Slide 10: Solicitation Questions |
| Slide 11: Disclaimer |
| Slide 12: Questions |