Questions and Answers.docx
DOCX document 13 KB Posted
- Attached to
- Repair_Auditorium_B603_Solicitation Federal contract opportunity
- Solicitation number
- W50S75-23-B-0002
- Issued by
- Department of the Army National Guard
About this file
This document contains questions and answers regarding solicitation number W50S75-23-B-0002 from the Department of the Army National Guard to renovate the 146 Operations Group Auditorium at Channel Islands Air National Guard Station. The scope of work includes replacing ceiling tiles, installing thirty recessed LED lights where existing lights were removed, and relocating and reinstalling auditorium seating to provide working space for elevated equipment. It is the contractor's responsibility to move and replace the seating. The government will provide a storage location for the seating during construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S7523B0002_Repair_Auditorium_B603_Abstract_of_Bids.pdf | ||
| W50S7523B000200003_WD_Update.pdf | ||
| W50S7523B0002_Repair_Auditorium_B603_Amendment_2.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| W50S7523B0002P00001_RFI Deadline and Sign In Sheet .pdf | ||
| W50S75-23-B-0002_ Repair_Auditorium_B603_1442_Solicitation_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Solicitation W50S7523B0002, Renovate 146 Operations Group Auditorium, Channel Islands Air National Guard Station, 4146 Naval Air Road Port Hueneme, CA 93041, Building 603
Question #001 Per Statement of Work Repair Auditorium B603 PROJECT NO.: DJCF232672 Section 3.1.5.1 States “Replace existing ceiling grid with new ceiling grid/tiles. Contractor shall maintain the same configuration of existing equipment (i.e. lighting, vent covers, ceiling mount paging speakers, and other equipment not mentioned herein)”.
Does this scope of work include replacement of all support/seismic wires and anchors for the new acoustical ceiling system or can all existing support/seismic wires and anchors be utilized to support new acoustical ceiling system? All existing support/seismic wires and anchors can be utilized to support new acoustical ceiling system, unless replacement of support/seismic wires is required. Updated Scope of Work Section 3.1.5.1 states, “Replace existing ceiling tiles with new ceiling tiles.” Ceiling grid will remain in-place.
Question #002 Per Statement of Work Section 3.1.2, subsection 3.1.2.1 states; “Install twenty-four (24) recessed architectural LED dimmable lights where existing lights were removed from”.
Does this scope of work include replacement of all support/seismic wires and anchors for the Lights or can all existing support/seismic wires and anchors be utilized for new fixtures? All existing support/seismic wires and anchors can be utilized to support new fixtures, unless replacement of support/seismic wires is required. Updated Scope of Work Section 3.1.2.1 states, “Install thirty (30) recessed architectural LED dimmable lights where existing lights were removed from.”
Question #003 Per Statement of Work Repair Auditorium B603 PROJECT NO.: DJCF232672 Section 3.1.5.1 States “Replace existing ceiling grid with new ceiling grid/tiles.
Is there existing ceiling insulation located on top of the existing acoustical ceiling grid system, which will require removal and replacement? No
Question #004 Is it the Contractors responsibility to relocate/reinstall existing Auditorium Seating to achieve working space for elevated lift equipment and/or scaffolding for access to the high ceiling? If not, and existing Auditorium Seating is required to be relocated/ reinstalled by Contractor, is there a designated storage area for existing seating within B603? Can the Government provide location of designated storage area for the existing seating as applicable? Yes, it is the Contractors responsibility to relocate/reinstall existing Auditorium Seating to achieve working space for elevated lift equipment and/or scaffolding for access to the high ceiling. Government will provide location of storage area for existing seating while work is being performed.