This document contains questions and answers regarding a solicitation to repair restrooms at a National Guard facility. The solicitation seeks a contractor to perform repairs to restroom walls, ceilings, plumbing lines, and fixtures at multiple restrooms on site. No hazardous materials are present. Work may be conducted simultaneously in all restrooms, and all work must be performed during normal business hours. Lockers and benches are to be replaced with models matching existing dimensions and quantities. The solicitation instructions and site visit details are provided in the accompanying solicitation document.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Restrooms B1401, newest first.
File Type Posted
Abstract of Bids W50S75-20-B-0001 Restrooms.pdf PDF
Site Visit Roster Restrooms.pdf PDF
Attach 2 Drawings - B1401.pdf PDF
W50S75-20-B-0001 Solicitation IFB.pdf PDF
Attach 1 SOW- Rpr B1401 Restooms.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Restrooms B1401, Solicitation W50S75-20-B-0001 Questions and Answers

Effective 21 September 2020

QUESTION ANSWER

1. Is there a phasing schedule or will all bathrooms be provided to the contractor simultaneously? If so, will the contractor be responsible to provide portable restrooms for building occupants. If so, please provide temporary restroom requirements.

Bathrooms can be worked on simultaneously. No phasing schedule. No temporary restrooms needed.

2. Is there any know hazardous materials? No. There are no lead base paint nor asbestos on the installation.

3. Existing restrooms walls have a level 5 smooth finish, in contracts, clin 001 item 3.1.8 calls out for repair (fill holes and re-texture) ceilings and non-shower walls; Texture will be orange-peel, spray applied. Please confirm restroom wall finish.

Restroom wall finish shall match existing.

4. CLIN 001, paragraph 3.1.1, calls for camera line inspection of drain/sewer/vent stack lines. Please confirm that this is only the lines in the restrooms, or provide plumbing as-built drawings so we can determine the linear footage of lines.

Only lines in Restrooms

5. CLIN 001, paragraph 3.1.2, calls for hydro-jetting of drain/sewer/vent stack lines. Please confirm that this is only the lines in the restrooms, or provide plumbing as-built drawings so we can determine the linear footage of lines.

Match existing, so floor mounts to be installed

6. Will the renovation of the restrooms have to be phased, and if so how many restrooms can be taken out of service for any one phase.

Restrooms can be worked at same time.

7. Can all work be performed during normal work hours

Yes

8. What is the specification of the lockers & benches for the job?

Install new Republic Storage System Company’s or approved equal metal standard single tier lockers at existing locker locations with matching existing locker dimension and quantities. Lockers shall have full louver ventilation with continuous “plano” style hinge and continuous sloped tops.

Install new Republic Storage System Company’s or approved equal Locker benches shall be laminated maple, 1-1/4" full finished thickness. All corners are to be rounded and sanded. Top and edges have two coats of a clear finish with one coat on the bottom. Bench tops are to be 9-1/2" wide and furnished in lengths of 3' through 12' (whole foot increments). Bench Tops to be mounted on pedestals consisting of 1-1/4" O.D. tubing with 10 gauge steel flanges welded to each end. The overall height of bench assembly shall be 17-1/2".

Pedestals shall be finished to match lockers.

Questions and Answers

Effective 21 September 2020

QUESTION ANSWER

9. Per Solicitation, Offer, and Award Document, Page 4 of 75 (see attached): "The Contractor shall report ALL contracting labor hours (including subcontractor labor hours) required for performance of services provided under this contract for AIR FORCE collection site."

Are you requesting an estimate amount to be given with the bid proposal? And did you want the value in hours or dollar amount? Please Advise

You are not required to submit an amount. You can enter an amount in dollars if there is a chargeable amount that your company is requesting for inputting that data or you can put NSP “Not Seperately Priced” if you company does not have a separate charge for it.

10. Are we to submit the entire Solicatation, Offer and Awards documenmt, or just pages 1 - 4? Please Advise