Questions and Answers v1.pdf
PDF 103 KB Posted
- Attached to
- Temporary chiller lease Federal contract opportunity
- Solicitation number
- W50S72-24-Q-7100
- Issued by
- Department of the Army National Guard
About this file
This document is a set of Questions and Answers (Q&A) related to Solicitation Number W50S72-24-Q-7100 for the lease of a temporary air-cooled chiller. The solicitation is a Request for Quotation (RFQ) issued by the Department of the Army National Guard.
The key details are: The Government is seeking to award a firm-fixed price contract for the 5-month lease of an air-cooled chiller, including delivery, installation, startup, and return services. The chiller will be used to provide chilled water to several facilities in a Consolidated Support Facility. The solicitation is set aside 100% for small businesses under NAICS code 333415 with a 1,250 employee size standard. Proposals are due on May 3, 2024 by 2:30 PM Central. The preferred start date is May 15, 2024. The Q&A document provides responses to 6 questions related to chiller placement, unloading, water temperatures, electrical connections, and the anticipated start date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers v3.pdf | ||
| Questions and Answers v2.pdf | ||
| ChillerLocation.jpg | JPG image | |
| ChillerPiping.jpg | JPG image | |
| Full-Text Provisions and Clauses - W50S72-24-Q-7100.pdf | ||
| PWS - Chiller Lease.pdf | ||
| Vendor Information Sheet.docx | DOCX document | |
| Temporary Chiller Location Photos.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: W50S72‐24‐Q‐7100 Questions and Answers v1
Current as of 29 April 2024
Q1. Does the chiller have to be placed on the ground or can it be left on a trailer since it's a short term lease?
A1. We would prefer that the chiller be set on the concrete pad next to the existing chiller.
Q2. If the chiller has to be placed on the ground, does the contractor have to unload it?
A2. We can assist with unloading the chiller.
Q3. We notice the specifications mention Glycol, do you know the supply and return water temp needed?
A3. Supply temp needs to be between 40‐ and 45‐degrees Fahrenheit. Return temp will vary based on load.
Q4. Does the government have someone onsite to do the tie in or is that requested as well?
A4. The PWS states that the contractor is to provide delivery, start‐up and return of the chiller and it also lists installation services that are required to connect the chiller to the facility and make it functional. The base will be doing the electrical connections using the power cables provided by the contractor.
Q5. When is the start date?
A5. Preferred start date is 15 May. Depending on when the award is made we would want the install to be as soon as possible after award, but solicitation does state within 2 weeks ARO.
Q6. What will the chiller be cooling?
A6. The chiller will be providing chiller water to several air handling units for a Consolidated Support Facility including a clinic, dining hall, and communications functions.